高压外供电施工总结

时间:2019-05-12 06:37:38下载本文作者:会员上传
简介:写写帮文库小编为你整理了多篇相关的《高压外供电施工总结》,但愿对你工作学习有帮助,当然你在写写帮文库还可以找到更多《高压外供电施工总结》。

第一篇:高压外供电施工总结

xxxxxxxxxxx工程

xxxxxxxxxxxxx工程有限公司

xxxx年 xx月xx日

目录

一、工程基本概况.............................................................1

1、项目概况:............................................................1

2、施工标段主要工程内容描述..............................................1

3、施工内容..............................................................2

4、施工要求..............................................................3

5、工程总体目标.........................................................4

6、工程界面.............................................................4

二、项目机构组成............................................................4

三、质量管理情况............................................................5

1、设备、材料供应........................................................6

2、设备、材料近场开箱验收................................................6

3、设备安装质量控制......................................................6

四、施工进度控制.............................................................7

1、编制“保证工期关键线路网络图”........................................7

2、加强设备采购合同的追踪管理............................................8

3、因地制宜协调工期进度计划的落实........................................8

4、加强内部管理充分发挥出我公司的技术优势................................8 五、工程施工组织及做法......................................................9

1、设计依据及相关标准、规范..............................................9

2、工作程序..............................................................9

3、施工计划.............................................................10

4、质量监控及自检.......................................................11

六、施工安全与文明施工情况..................................................11

1、建立健全公司安全生产责任制...........................................11

2、消防规程和安全措施...................................................12

3、事故报告.............................................................12

七、环境保护措施及体系......................................................13

八、备采购供货情况..........................................................14

九、主要工程变更情况........................................................14

十、运行期存在的问题及尾留工程计划..........................................14

十一、施工体会..............................................................15

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx高压外供电工程自xxxx年xx月与xxxx集团电气化工程有限公司签订合同协议书,并与xxxx年xx月x日正式开始施工,至交工验收历时xx个月。在xxxxx有限公司的正确领导下,在设计、监理单位的大力支持和帮助下,以及在我公司项目部全体人员静心组织、全力施工下,为了确保xxxxxxx外供电工程的顺利开通,保质、保量,争创优质工程为前提下,完成了合同规定的各项工程任务。现将xxxxxxxxxxx外供电工程完成情况报告如下:

一、工程基本概况

1、项目概况:

本工程位于武汉市xxxxxx,xx路与xx公路交叉口附近,xxxxxxxxxxx区域。本项目拟改造、利用xxxxx既有xx线及货场,新建相关物流配套设施,快速实现xxxxxx功能,设计集装箱xxxx运总量为xx万TEU,另外考虑xxxxxx有xx万TEU。通过新建场区和进出场重载道路,将xxx已建xxxxxx作业区与本项目相接,有效缓解xxxx路交通压力;本项目占地约xxx亩,现堆场布局xxxxx区、重箱堆场区、空箱堆场区、拆装箱区、仓库区及辅助办公区等功能,完善港区现有服务体系。

本工程内容为港外新建10KV线路供电工程及开闭所等土建工程及开闭所、配电室高压系统设备安装、调试等,本项目计划工期:4个月。

2、施工标段主要工程内容描述

1、新建开闭所、中心配电室、分配电室所有高压柜、变压器的制作与安装;

2、外线至新建开闭所、新建开闭所至中心配电室、中心配电室至分配电室的高压电缆敷设;

3、新建开闭所土建施工;

3、施工内容(1)电源

主供电源:由110KVxxx变电站xx母线xx间隔xx线,经xxx开闭所1段母线备用11间隔出YJV22-3*400电缆线路(电缆沟敷设)至该户新建公用开闭所,再经xxxxx开闭所1段母线备用出线间隔,以电缆管井方式至新建专用中心配电室供电,电压等级:10KV,供电容量:xxxx千伏安;

备供电源:由110KVxxx变电站xx母线xx间隔xxxx一回线,经xxxxxxx开闭所1段母线xx间隔出YJV22-3*400电缆线路(电缆沟敷设)至xxx开闭所,再经xx开闭所11段母线备用xx间隔至新建港航开闭所,再经新建xxxx开闭所11段母线备用出线间隔,以电缆管井方式至新建专用中心配电室供电,电压等级:10KV,供电容量:xxxx千伏安。

(2)配电装置及供电系统

本工程中心变电所配备xxxxKVA变压器两台,xxKVA变压器一台,分变电所配备xxxKVA变压器二台。供电频率为50Hz。

新建开闭所、中心变电所和分变电所分别采用两回路10KV高压电

缆线进线,高压系统采用 单母线分段接线。本工程主要动力负荷:轨道龙门起重机等。本工程主要照明负荷:高杆灯、路灯照明和室内照明等。本工程主要生产负荷为二级负荷,本工程 消防用电为二级负荷。(3)防雷接地

本工程建筑物均为第三类防雷建筑,电源进线的重复接地,电气设备保护接地,接地装置的电阻值不大于1欧姆。

4、施工要求 1.电气设备安装

(1)高压开关柜的安装

高压配电室高压开关柜采用离墙式落地安装,配电柜安装前应检查基础槽钢埋件是否平直。在基础槽钢上,按高压开关柜的安装孔位置划线钻孔,采用螺栓将柜体固定在基础槽钢上,其安装方法详见设备供应商提供的安装图,详细做法参见建筑电气工程安装施工图集。(2)变压器设备安装

设备运到中心配、分配电室现场后,应进行外观检查。柜体包装完好,包装拆除后柜面无损伤和裂纹,柜门无变形,附件应齐全。随后施工人员指挥吊车配合工人卸载变压器,变压器应按施工图的布置,将变压器按照顺序逐一就位在基础型钢上,应调整到符合施工规范的规定。2.接地安装

设备接地应与基础的接地引出板用-40*4扁钢带焊接详细做法参

见国家标准图集。

5、工程总体目标

xxxxxxxxxxxxxxxx外供电工程于xxxx年xx月签订合同协议书,xxxx年xx月完成整个供配电设备安装并进行了送电,xxxx年xx月经试运后,和监理及业主单位对所有设备进行了验收,按计划全面完成了合同任务。

从工程实施的结果看,实现了原定的设计目标,达到了设计要求。

6、工程界面

xxxxxxxxxxxxxxxxxx外供电工程涉及整个场区供配电,并且与房建、土建单位交叉施工,施工难度较大。在xxxxxxxxx有限公司、设计单位、监理单位的大力协调下工程进行的比较顺利。

此外,供配电施工存在时间紧、送电需与电力部门协商、工程界面需求要与房建、土建单位进行沟通,但是我公司项目部人员发扬不怕困难,严格要求,按照标准完成施工任务。

二、项目机构组成

根据本工程建设进度要求,我项目部于xxxx年xx月底进场,xxxx年xx月初完成项目经理部组建和驻地建设验收。

(1)项目经理部负责协调工程项目的各方面关系,负责施工全过程的组织管理、进度计划管理、施工质量控制、施工方案的设计、劳动力和施工机具的组织、保障安全生产、保障文明施工、技术交底、竣工验收工作的协调、以及廉政工作等各方面与本项目有关的所有事宜。项目经理部由项目经理、项目总工程师、工程部、质量控制部、安全保障部、财务计划计量采购部及办公室组成;各职能部门下设相应的支持人员。

项目经理:负责统筹安排与本工程有关的一切事宜,对工程质量负全面领导责任,负责实施质量目标,对工程安全问题负全面责任,是项目经理部第一责任人,是本项目实施中第一责任人;

技术负责人:协助项目经理统筹安排本工程有关技术事宜,负责系统实施过程中各系统之间的接口协调,并对工程质量负全面技术责任;

工程技术部:由项目技术负责人直接负责,下设若干个实施小组;主要是做好现场的技术有关的各类工作;

计划统计财务部:负责本工程计量支付、请款、工资、补贴、报销等所有财务工作;协助项目经理做好成本、进度、原材料等的协调和控制工作;

质量控制部:贯彻落实水运工程质量检验标准(JST_257-2008);对工程质量直接负责;

安全保障部:负责工程项目施工安全;制定安全施工措施。

三、质量管理情况

为确保xxxxxxxxxxxxxxxxxxxxxxxxxxx外供电工程设备以高标准、高质量、安全可靠地长期运行,达到系统设计的预期目标,满足当前营运及今后扩充的需要,我公司将一如既往,把质量放在第一位,实行全面质量管理。

在本项目实施过程中,我们采取了多种施工过程质量控制方案,以保证工程质量。

1、设备、材料供应

厂商资格:机电设备、材料供应商厂家至少有多年制造这种设备、材料的经验;电子设备、材料厂家至少有多年实践经验。

运输的经验:所有现场交付设备有良好的包装和防护措施,每件设备在托运时,提交装箱清单和提货单,上面有包装尺寸、名称。

2、设备、材料近场开箱验收

设备材料到货后,工作小组(项目经理部主要管理人员、各部组长和专责工程师)根据工作计划,组织开箱检验工作。

3、设备安装质量控制

供配电工程安装项目严格按图施工,对进口设备要详细阅读说明书和有关资料,要掌握设备有关规范和技术要求,各项安装工程要做出施工方案或施工技术措施,项目经理部自审合格后报业主和监理工程师代表会审,批准后方可施工。

加强原材料和设备的质量检查工作,做好原始记录,坚持不合格品不施工的原则。

隐蔽工程要经有关部门验收,并做好原始记录。

凡施工项目均有技术方案,且必须按方案施工,所有工程必须达到有关规范和标书的要求。

我公司在供配电工程安装过程中将认真贯彻水运工程质量检验标准,对安装项目进行过程控制,做好技术交底工作和质量记录。

工程质量目标编制工程质量计划质量计划实施准备阶段控制施工阶段控制技术交底竣工阶段控制索取设计文件联合设计最终检验测试质量缺陷处理测量控制材料控制联合设计会审整理质量记录设备控制设计变更计量控制编制竣工文件选择供货商作业指导书承包人自检联合验收检验控制提出开工报告项目质量计划验证竣工验收报告持续改进项目竣工评价合格工程业主满意

四、施工进度控制

为保证工程实施能够按计划进行,达到按期完成的目的,我们将采取下列保证工期的措施。

1、编制“保证工期关键线路网络图”

网络图强调工程进度安排的总体性和协调性,从全局出发,综合布局,精心设计,精心安排并明确规定各分部、分项工程的起讫与终

止日期,抓住关键路线,对关键工序保证其人力和财力的倾斜,实时检查实际进度与计划进度的差距,及时采取补救措施,保证按时完成关键工序,力求各分部工程与总体计划安排协调统一以及各分项工程的衔接顺畅,从而实现指导具体工程施工的目的。

2、加强设备采购合同的追踪管理

加强设备采购合同的追踪管理,通过多种方式,了解和掌握设备生产、制造和采购情况,以做到心中有数。

3、因地制宜协调工期进度计划的落实

我们将按照要求,根据工程实际进展情况,月底上报监理下月的施工计划,及时发现问题,提出问题,解决问题。确保工程施工的计划性和科学性;同时,做好充分的人力、物力、财力方面的各项准备,安排更多的力量进行多个施工组、多作业面同时交叉施工,以取得在单位时间内完成工程量成倍增长的结果,进一步保证工期。

4、加强内部管理充分发挥出我公司的技术优势

充分发挥我公司的我公司优势,加强项目经理部与我公司下属各公司分工配合,使他们能事先做好相应的技术支持的各项准备工作,一旦工程需要,立即组织相应的工程技术人员赶赴现场,以解决多作业面、多施工组同时交叉施工而可能带来工程技术力量不足的情况。

五、工程施工组织及做法

1、设计依据及相关标准、规范

GB50052-2009《供配电系统设计规范》 GB50054-2011《低压配电箱设计规范》 GB50053-94《10KV及以下变电所设计规范》 JGJ 16-2008《民用建筑电气设计规范》 GB50057-2010《建筑物防雷设计规范》

招、投标文件、图纸

澄清文件 补遗书 相关会议纪要 设计标准及行业规范

2、工作程序

(1)施工前详细阅读有关本次工程的所有资料、文件(包括:招标文件、投标文件、设计图纸、补遗澄清函、确认函等)。

(2)施工现场的实地勘察,了解施工现场情况。

(3)进一步对工程中存在的问题进行澄清,确定施工方案。(4)做好施工组织设计方案,并报批。

(5)对材料生产厂家进行调研,收集材料生产厂商及产品资料和相关证件,进行报批。

(6)根据工程量清单及材料报批结果采购订货。

(7)按工程进度计划组织施工队伍进场,并进行施工前技术培训及技术交底。

(8)组织施队伍施工并按工艺流程、质量要求、技术要求、安全规范等进行自检,并填写施工日志。

(9)现场工程师与施工负责人随时进行现场施工的安全质量监控。

(10)完工验交。

3、施工计划

(1)项目部组建阶段:

根据施工工程量及施工技术要求的需要组织项目部,并报批。技术准备阶段:

根据投标文件及图纸组织施工人员进行技术交底及现场勘查。施工人员详细阅读工程有关文件资料、图纸,并根据现场实际情况,对有关施工问题进行澄清,做出符合实际的具体施工方案并绘制联合设计的施工详图。(2)施工准备阶段:

施工材料、施工机具、设备、施工人员的组织进场,同时在施工前进行施工设备、机具的检验工作,对施工人员进行施工前培训,对施工队伍负责人进行技术交底,对进场施工材料进行报检。项目部组织施工队负责人及专业技术人员进行现场堪察,了解现场情况,并共同对施工方案进行分析、消化,以保证施工进度的顺利进行。(3)自检、验收、竣工资料的整理阶段:

项目部组织施工负责人、专业技术人员对整体完工自检,将结果填写自检报告,并全面系统地整理完成竣工资料,报请监理部进行完工验收。

4、质量监控及自检

(1)施工负责人全面负责施工全过程的质量管理监控工作。

施工过程严格执行施工质量标准及技术要求。施工中现场质量管理人员随时监控、抽查施工质量。施负责人认真填写施工日志,明确责任。做好阶段性总结工作,发现问题及时解决处理。经常做好质量的自检工作。

六、施工安全与文明施工情况

我们严格执行招标文件所规定的施工工地的安全措施,在工程施工过程中,在安全管理中,遵循有关安全法规和规程,采取一切措施确保工地人员的健康和人身安全,直接接受业主单位安全管理机构和监理单位的领导,落实贯彻业主单位的各项安全规定,确保完成安全责任目标。

1、建立健全公司安全生产责任制

我公司内部管理制度建立“安全生产责任制”,建立层层岗位责任制,将安全工作落到实处。实行安全生产与经济效益挂钩的奖惩措施。

(1)建立健全项目经理部的安全生产责任制

认真贯彻落实我公司的安全生产责任制,严格遵守国家相关的法律法规,项目经理为本项目安全生产的第一责任人,对工程安全生产和工程质量负全面责任。项目经理部设立安保部和安全员,对安全生产进行时时检查和监督工作。安全管理包括各种标志牌的设置、各种安全保证措施的设置、公司内部自上而下的安全管理体系。

(2)一般安全措施

除以上制度外,在本工程施工中需格外强调指出的还包括: 大力做好安全教育工作,全体施工人员必须坚持“安全第一,预防为主”的方针,建立层层岗位责任制,遵守国家和企业的安全规程,在任何情况下不得违章指挥或违章操作;

注意防火防爆,气瓶搬运时不得撞击,氧气、乙炔瓶要分别放置,使用时要保持安全距离,焊割作业周围,在事前清除易燃物品。工地配备必要的消防器材。

2、消防规程和安全措施

严格遵守《中华人民共和国消防法》和招标文件及监理工程师规定的消防规程和要求,在有仓库、办公室和居住区等有潜在危险的地方放置便携式灭火器。

3、事故报告

我公司承诺,一旦发生危害工程安全、工程进度和工程质量的事故时,我们采取必要的抢救措施,并立即暂停此项目和与项目有关的项目的施工。

质量事故发生后,我们以最快的方式,将事故简要情况报监理工程师,并采取必要的抢救措施。按照事故处理“三不放过”(找不出事故原因不放过、事故责任人和广大职工受不到教育不放过和没有指定出防范措施不放过)的原则,履行监理规范中关于事故处理的流程。

七、环境保护措施及体系

在工程的实施过程中,环境保护非常重要,是否能保护工程实施现场以及附近的环境,不仅关系到周围居民的生活,还会影响到施工单位的整体形象,因此我项目经理部制定并实施减少扰民、降低环境污染和噪音的环境保护措施如下:

1、我们在工程实施中,严格遵守国家环境保护部门及本工程有关环境保护的相关要求和规定。我们理解,承包人有责任采取有效措施以预防和消除因施工造成的环境污染,并对工程范围以外的土地及植被注意保护,保证业主避免由于环境污染而承担索赔或罚款;

2、我们的生产、生活设施符合环境保护要求,并接受当地政府及有关部门的监督;施工人员接受加强环境保护意识的教育,在施工期间,尽量保持工地清洁、控制扬尘、杜绝漏撒材料;

3、在施工过程中,避免扬尘、排污、噪声、材料露失给周围居民和环境造成的伤害,承包人理解,由于上述原因造成的损失将由承包人负责;

4、施工场所环境清洁,地面干净,无烟头,杂物等。物料堆放整齐,不影响交通和设备的运行维护。环境保护机构健全,环保工具

完好,正常开展工作。汽车废气排放符合环境保护要求。总的来说,本次工程施工严格要求,积极完全成各项施工任务,在施工中积极发现问题解决问题,努力克服困难,在业主、设计和监理的大力帮助下很好地按期完成了各项任务。

八、设备采购供货情况

为确保xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx外供电工程技术的先进、设备的优质、系统运行的安全可靠,保证xxxxxxxxxxxxxxxxxxxxxxx外供电工程建设成为优质工程,我公司严格履行合同及联合设计的有关规定,明确以“当前主流产品”为前提下,严格把好供配电产品的选型及采购工作,强有力的保证了工程的质量及设备的可靠性、稳定性。

九、主要工程变更情况 施工详图设计后,机电系统的技术文件设计已经比较完善,只是在工程量清单和图纸中,结合现场的施工实际情况,增加工程量清单中设备材料数量的变更。

1、根据现场情况,调整了xx园区门口顶管的施工距离。

2、根据现场情况,调整了开闭所旁边电缆井和排管数量。

十、运行期存在的问题及尾留工程计划

本合同段工程于xxxx年xx月xx日完工后即进入试运行期,至xxxx年xx月xx日试运行期结束。试运行期间,我合同段再次对前

阶段施工情况进行复核、检查,对存在的缺陷和不足进行整改、完善,确保合同文件和技术规范要求的功能得以实现,以满足xxxxxxxxxxxxxxxxxxxxx外供电工程运营需求。

并于xxxxx年xx月中旬,业主及监理单位对xxxxxxxxxxxxxxxxxxxxxxxx外供电工程进行了现场验收检测,对验收中存在的问题逐一进行整改完善,并进行了复检。同时,我部根据业主和监理安排,对施工内业文档进行检查、整理,为交工验收文件资料编制做好准备。

十一、施工体会

1、管理机构配置应科学合理,以保证整体凝聚力,又快又好地完成工程项目。

2、在前期准备过程中,要细调查工地实际情况,及时制定或调整措施,保证工程顺利实施。

3、合理投入资金、设备,只有这样才能取得质量、进度效益的多赢局面。

4、建设单位的支持,领导的重视是完成任务的关键。

5、以过程控制保证质量,以质量保证进度。

虽然,工程施工已经结束,并得到了业主、监理的初步认可。但是在工程施工工作中,仍然暴露出了许多在工作开始前,没有考虑到的情况发生。我们会通过此项工程及时整理施工经验,以便在今后的工作中取得更大的进步。

此工程在今后试运行期间还会逐渐出现新的问题,我们承诺将会派专人留守负责,一旦出现情况,马上进行维修。决不会出现工程验收后,施工单位不负责任的情况。工程已接近尾声,我们还是要再一次感谢各位领导、业主单位、设计单位、监理单位以及相关工作人员!

xxxxxxxxxxxx工程有限公司

xxxxxxxxxxxxxxx外供电项目经理部

二零xx年xx月xx日

第二篇:外电总结

1、我们建议今后将该货改为小包装,如半磅或一磅,以便销售。

2、这批货物我方建议改用中性包装,请告知可否接受。

3、为了适应远洋运输,这种货物包装必须改进。

4、经过核对库存,我们能设法满足要求将交货期提前到7月份。

5、谢谢你方大力合作给我们提前装运10台机械。

6、我们接到当地轮船公司通知。“长风”轮定于本月5日左右开往马赛。

7、要不是你们要求我方在6月底装船,我们早就会同你公司成交5000公吨花生。

8、使用小箱子轻且牢固,便于商品的储存和销售。

9、请按提供的图样在箱子上刷唛。

10、请在装船前10天将船名,预计受载期,装载量,合同号和运输代理人通知我们。

11、买方坚持8日交货。

12、货物每打装1纸箱,每10纸箱装1木箱,箱厚半英寸。

13、在装船时,请按发票金额开具汇票向我们收款。

14、请确保按期交货。

15、谨告知你方须负由于迟装或包装不当而产生的任何损失。

16、我们要求下一班可订到舱位的轮船装运。

17、请你方注意,除非在7月11日前交货,否则撤销订单。

18、为了顺利过关,请严格按照买方装船须知行事。

19、货物急需,请速发运。

20、请告知订单备妥待装估计所需时间。

1、We suggest that the goods should be repacked in small package.say,half a pound or one pound in order that we can push the sales of it.2、We suggest that the goods should be repacked in neutral packing.Place imform us wether it can be accepted or not.3、The packing of the goods must be improved in order to fit for seaworthy condition.4、We may see our way to advance time of shipment to July after checking the stocks.5、Your close cooperation in advancing shipment of 10 sets machines will be highly appreciated.6、We were imformed by the local shipping company that M/V “Changfeng” will be schceduled to sail for Marseilles on or about 5 this mounth.7、Ifyou had not asked us to ship by the end of June,we must have concluded the deal with you for 5000 metric tons peanuts.8、Small cases are light and compact,easy to be stored and to be saled.9、Please mark the cases as per the drawing given.10、Please inform us 10 days prior to the shipment of the name of steamer,ETA,loading capacity,contract number and forwarding agent.11、The buyer insists on delivery on 8 th.12、The goods should be packed in a cardboard carton with a dozen,10 cartons to a wooden case,half an inch thick.13、Please draw on us a draft against the invoice vale before shipping the goods.14、Please ensure the punctual shipment.15、We hereby inform you that you should be held responsible for any losses arising from late delivery and improper packing.16、We request that the goods should be shipped by the next available steamer.17、Please note that you must make delivery before July 11 th otherwise the order will be

cancelled.18、You are requested to act according to the buyer's shipping instructions in order to go through the customs smoothly.19、The goods are badly needed, Please expedite shipment.20、Please inform us the time for getting the order ready for shipment.1、只要你公司坚持所提出的价格,那我们将不能给你一个适当的报价。

2、我们以较低的价格提供较佳的产品。

3、我们不能配合你公司的使用特别的包装。无论如何你公司要我们特别注意的是:我公司

应注意防止产品包装的损坏。

4、如果你公司将 9月3日的报价单的价格降低3%,则我公司将乐意接受你们的报价。

5、你公司报价货物之包装不符标准,你公司能否使用可防止破损的包装.6、由于我公司仓储能力的限制,货物需分三次分运。不知在这种条件下你公司的报价是否

有效.7、你公司21日寄来的价目表很完整,但所列的付款条件不符合我们的贸易习惯。

8、我公司对于你公司30日寄来的报价单中的保险事项不甚满意,你公司能否对其重新考

虑。

9、我们觉得,对于你公司的易腐货物,只适合于用冷藏卡车运输,请立刻告知我公司此法

是否可行。

10、由于考虑到我公司报你之价格为最低价格,故无法满足你公司的特殊要求。

11、很遗憾,我们无法履行你公司对我们30日所寄报价单中有关包装事项的特殊要求。

12、由于考虑到阁下将开出大量订货的订单,对于我们最近的报价单,将允许一定的折扣。

13、我公司的装运部门准备依从贵公司对运输路线的特殊要求,特此通知。

14、非常抱歉,我们无法依从你对有关包装的特殊要求,但愿意提供如下的特价报价。

15、尽管我公司无法满足你的特殊要求,但我们仍寄送另一份报价单给你。

1、Ifyou insist on your price,we can not make you a suitable offer.2、We can supply superior qulity goods at a lower price.3、We can not use the special package in compliance with your request.In any case you call our attention to the fact that we should take measures to prevent the damage to the package.4、If you reduce the price of quotation sheet dated Spet.3 by 3%,we are desirous of accepting your offer.5、The package of your offer is not up to the standard whether you can use the package preventing from damage.6、Owing to the limit of our storage,the goods should be shipped in three lots.We wonder if your offer is vaild under the circumstances.7、The price list you sent on 21 st is found in order but the listed terms of payment don't conform to our trade practice.8、We are not satisfied with the items of insurance listed in your quotation of 30 th.Whether you can take it into consideration again.9、We think that your perishable goods is suitable for cold storage trunk.Please let us immediately whether this method is workable or not.10、Because we consider that the price we offered you is the lowest price,we are not in a position to meet your sepical requirement.11、We very much regret that we are unable to satisfy your special requirements for the items of packing in our quotation sheet dated 30.12、In consideration of your large orders we will allow discount to certain extent on the recent quotations.13、We hereby inform you that the forwarding department will comply with your special request for transport route.14、Much to our regret that we can not comply with your special request for packing but we are willing to make an exceptional offer as follows:

15、Although we are not in a position to satisfy your special requirements,we still send you another copy of our price list.1、本报盘5日内有效。

2、以上报盘月底前有效。

3、本报盘以收到你方订单时,货未售出为有效。

4、此报价对我方无约束力。

5、我方报价如有变更不另通知。

6、如果你方认为这一报盘可以接受,请即来电,以便我方确认。

7、按照你们的要求,我们报50公吨大豆的实盘如下,以自本日起一周之内你方复到为准。

8、兹报实盘,以我方时间10月5日星期四上午10时以前答复为有效。

9、我们确认卖给你方50公吨苦杏仁。

10、你方所买的一批样货,按照商定办法,我们将开出即期汇票向你索款。

11、我们可以从现货中供应你3000打“天坛”牌男衬衫。

12、我们相信我们所报的价格会得到你方认可。

13、我们愿提请你们注意此事。

14、此系特惠报盘,我方通常折扣不适用此盘。

15、为了开展双方间具体的业务,我们很高兴向你方报特盘,以我方最后确认为有效。

1、This offer is firm for 5 days.2、The above offer is vaild by the end of this mouth.3、This offer is subject to the goods being unsold upon receipt of your order.4、This offer is without engagement for us.5、Our offer is subject to change without notice.6、If you think this offer is acceptable,please cable us in order that we can confirm.7、At the request of you,we offer you firm,subject to your reply reaching here within one week ,50 metric tons soybeans as follows:

8、We make a firm offer subject to your reply reaching us by 10 a.m.our time,Thursday,Oct.5 th.9、We confirm that we have sold you 50 metric tons Bitter Apricot Kernels.10、As agreed,we will draw on you at sight against your purchase of a sample lot.11、We can supply you with 3000 dozen “Tiantan” brand Men's Shirts from stock.12、We feel confident that the price we quoted will meet with your approval.13、We would like to bring the matter to your attention.14、This is the special offer to which the usual discount doesn't apply.15、In order to start concrete business between us,we are glad to make you a sepical offer,subject to our final confirmation.1、由于资金被许多业务占用,他们不得不要求放宽付款条件。

2、我方抱歉不能接受货到目的港后凭单付款的支付方式。

3、如果你方能同意按即期信用证方式付款,我们即能达成交易。

4、鉴于双方长期友好关系,此次我们例外接受D/P 60天付款。

5、中间商决不会自负盈亏采购货物。

6、瑞典一进口商要求我们按承兑交单方式运去一批试销商品。

7、为确保早日交货,我们附寄银行汇票一纸,计3000美元。

8、我们今日已通知我方银行电汇给你方全部金额,收到请回信。

9、请在扣除你方应收手续费后,将货款贷记我方1008号账户。

10、你3月12日汇票已承兑,到期应照付。

1、The request for easier payment terms is compelled by their funds being tied up in numerous commitments.2、We regret that we can not accept D/P after the goods arrive at the port of destination.3、If you agree to pay by sight L/C,we might come to terms.4、In view of the long standing friendly relations we exceptionally accept D/P at 60 days sight.5、In no case will the midlleman purchase the goods on his own account.6、An importer from Swenden requests us to ship a parcel of shipment for trial on D/A terms.7、In order to ensure immediate shipment we enclose herewith a bank draft for the amount of $3000.8、Today we have informed our bank to send you all the amount by T/T,upon receipt of which please reply.9、Please credit the amount to our Account No.1008 after deducting the commissions payable to you.10、Your draft of March 12 has been accepted and will be honoured at maturity.商业书信结构:信头,封内地址,称呼,事由,开头语,信的正文,结尾语,结束语,签名,附件,再启。

信头的内容:发信人的姓名,地址,电子信箱,电传挂号,电报挂号,电话号码,经营项目,注册商标,公司董事、副经理等姓名,发信的日期。(发信人的地址和发信的日期)商业书信的格式:缩行式,平头式,改良平头式,混合式。

其他商业书信的必须部分:信头,封内地址,称呼,信的正文,结束礼词,签名。

询价函的写作原则:

1、告知对方你从什么渠道得到该公司的名址和产品。

2、阐述具体的要求但不承诺购买意图。

3、强调你需要的信息的重要性,尽量取悦读者以便取得更多的信息。

4、如有疑问,请对方明确回复。

5、如面向的是不熟悉的读者,尽量把信写成朋友间的叙谈。

6、使用礼貌、谦和的字眼。

付款条款信函的写作原则:

1、明确说明当前的状况和问题。

2、提出具体的要求。

3、做出明确的答复。如果拒绝付款的某些要求,最好用友善的口气讲明具体原因。

催款信的写作原则:

1、有礼貌、不要恐吓你的顾客。

2、意思表达清晰明了。直接写出对方所欠的金额和你期望他们付款的日期。

3、定期发送催款信。

4、为了避免伤害到你的客户,最好在催款信中加上:“如钱(货款)已汇出,请不要在意这封信。”

接到你公司9月5日印花细布订单,非常高兴,并欢迎你公司成为我公司的客户之一。

现确认按你方来信列明价格供应印花细布,并已安排下周由“公主号”轮装出。深信你公司收到货物后,定会感到完全满意。

你公司也许不甚知道我公司的经营范围,现附上目录一份。希望这首批订单将导致彼此更多的业务往来,展开愉快的工作关系。

We have pleasure in receiving your indent of Sept.5 for printed shirting and you are welcome to be one of our clients.We confirm having supplied you the above--metioned goods at the price listed in your letter and have effected shipment by s.s “Princess” next week.We firmly believe you wil be utterly

satisfied when you received them.You may don't know the scope of our business activities.Now we send you,under cover,a copy of catalogue.We hope that this initial order will result in more business connections and pleasant working relations.Re:L/C 1234 issued by Districk Bank

We acknowledge receipt of the captioned Letter of Credit for the amount of £2500 covering your order No.215 for 8 metric tons Walnutmeat.It appears that the amount in your L/C is insufficient as the correct total CIF value of your order comes to £2960 instead of £2500 the difference being £460.In view of the above,please increase the amount of your L/C by £460.On receipt of your amendment we shall arrange shipment without fail.关于底特律银行开出的1234号信用证

我们收到根据你第215号订单购买8公吨核桃所开的金额为2500英镑的标题信用证。看来你们开来的信用证金额不足,因为订单上的正确的到岸价总额为2960英镑而不是2500英镑,这中间的差额是460英镑。

鉴于上述的情况,请把信用证的金额增加460英镑。一旦收到你们的改证,我们定会安排装船。

第三篇:高压注浆防水施工

2.9、高压注浆防水施工 2.9.1、高压注浆技术特点

1)高压灌浆防水堵漏新技术简述

高压灌浆堵漏就是利用机械的高压动力,将水溶性聚氨酯化学灌浆材料注入混凝土裂缝中,当浆液遇到混凝土裂缝中的水分会迅速分散、乳化、膨胀、固结,这样固结的弹性体填充混凝土所有裂缝,将水流完全地堵塞在混凝土结构体之外,以达到止水堵漏的目的。高压灌浆堵漏技术是具有国际先进水平的高压无气灌注防水新技术,是发达国家水溶性灌浆材料使用的新型工艺。

2、高压灌浆堵漏原理:

水溶性聚氨酯化学灌浆材料是由过量的多元异氰酸酯和多羟基化合物预先制成含有游离异氰酸基团的低聚的氨基甲酸预聚体。常用的多异氰酸酯有TDI、MDI、PAPI等3种。多羟基化合物采用聚醚,它的官能团和分子量可以有好几种。浆液灌入混凝土裂缝后,与渗漏水相遇发生化学反应,放出二氧化碳,并形成脲的衍生物。从而达到防渗堵漏的目的。

水溶性聚氨酯化学灌浆材料是一种底黏度,单组份合成高分子聚氨酯材料,形态为浆体,它有遇水产生交联反应,发泡生成多元网状封闭弹性体的特征。当它被高压注入到混凝土裂缝结构延展直至将所有缝隙(包括肉眼难以觉察的)填满,遇水后(注水)伴随交联反应,释放大量二氧化碳气体,产生二次渗压,高压推力与二次渗压将弹性体压入并充满所有缝隙,达到止漏目的.可见水溶性聚氨酯化学灌浆材料是堵漏材料中性能最好的一种,用一般材料不能根治渗漏,使用高压灌浆堵漏技术后一次堵漏成功。

3、高压灌浆堵漏作用机理 ①对裂缝形成化学链结。②对表面的孔隙形成高强度锚栓。③高压力的推挤下填充所有裂缝。

4、高压灌浆堵漏技术运用特点 ①高度成品化; ②操作简捷; ③可四季施工; ④无毒无污染; ⑤费用合理。

2.9.2、施工主要应用材料: 2.1、材料简介

该产品外观为浅黄色至琥珀色透明液体,它是由聚氨酯预聚物与多种助剂配合而成的单组。分堵漏化灌材料,一种快速高效既能堵漏防渗又能固结补强的高分子弹性材料。可应用于各种工程中起堵水防渗加固作用。2.2、材料特点

①该材料具有良好的亲水性,能与水反应,同时生成CO2气体,并逆水而上沿来水通道渗透扩散,与周围的混凝土、砂、土等固结,快速硬化形成不透水的固结层,已广泛应用于封堵大压力的涌水和阻止地基中的流水及水的渗透。

②该材料与混凝土及土粒粘结力大,可制得高强度的弹性固结体,因此能充分适应地基或其他基层的变形,使其不易发现龟裂、崩塌而得到加固初强;

③在含水的结构中浆液不会被冲散,在其反应过程中,由于气体的扩散使有效固结区迅速增大,可得到比其他类型化学浆液大的多的固结体;

④根据工程不同的需要,可调节化灌液体的粘度,对于混凝土工程,如遂道、大坝等细小裂缝注浆后浆液能很快渗透进去,形成粘结牢固,抗渗性好、强度大的固结体;

⑤浆液的固化速度可根据施工需要调节;

⑥施工时采用单组分灌浆设备,易清洗,工艺简单易行,综合费用较低;

⑦固结体在水中浸泡对人体无害、无毒,无污染。

第四篇:高压供电施工合同

高压供电施工合同

授权方(甲方):郏县房产管理局

施工方(乙方):平顶山中天电气有限公司

用 电地址:郏县民心家园小区(郏县廉租住房项目)

为明确授权用电方(以下简称甲方)、施工供电方(以下简称乙方)双方在电力安装中的权利和义务,确保安全、经济、合理施工,根据《中华人民共和国合同法》、《电力供应与使用条例》等有关法律、法规的规定,经双方协商一致,特签订本合同。共同信守,严格履行。

一、施工项目

1、乙方承接(甲方)安装10KV线路及630KVA相变一台,工程总造价(人

民币)贰拾柒万肆仟贰佰贰拾贰圆整,小写¥274222元整。

2、本工程预计工期10天。

3、付款方式:工程开工前一次付清。

二、施工验收

1、乙方所承接甲方所有线路设备安装,由乙方负责审查验收。

三、约定事项

本合同履行中如发生争议,由双方协商解决处理。本合同未尽事宜,按照《中华人民共和国合同法》、《电力供应与使用条例》等有关法律、法规的规定执行。

本合同一式两份,甲乙双方各执一份,具有同等法律效力。

甲方(签章):郏县房产管理局乙方(签章):平顶山中天电气有限公司

签 约 时 间:2011年9月23日签 约 时 间:2011年9月23日

第五篇:高压线下施工专项方案

澄湖农贸市场

高 压

线 下 安 全 施 工 专 项

编制人:上海普研建筑安装工程有限公司 编制日期:二0一七年八月

方 案

高压线下施工安全专项施工方案

一、编制依据

(1)澄湖农贸市场施工图及相关设计文件;(2)《中华人民共和国电力法》;(3)《建设工程安全生产管理条例》;(4)《电力设施保护条列》;(5)其他有关安全管理办法。(6)现场施工环境实地调查情况。

二、编制原则

在确保工程质量和施工安全的前提下,力求施工方案的适用性、先进性相结合的原则。

三、适用范围

适用于甫澄中路澄湖农贸市场段高压线附近及下方的施工作业面。

四、工程概况(1)工程概况

工程名称:澄湖农贸市场,工程结构类型:地基为条形基础、上部为钢结构,建筑面积:923.17㎡。抗震设计:震烈度设防为7度。

五、安全方针、目标

以“安全第一、预防为主”为指导方针,以“从严治本、基础取胜”为指导思想,以创建安全标准工地为载体,落实安全生产逐级负责制,强基达标,强化管理,以控制惯性事故的发生为重点,杜绝施工重大责 任事故的发生,以坚持规范管理和日常安全检查为手段,积极开展事故预想、预防,认真落实施工安全措施,使安全生产始终处于有序可控状态。

安全目标:杜绝一切职工触电伤亡事故;消灭一切高压线短路事故。

六、危险源辨识及安全控制措施

高压线下及高压线外6m施工被我处列为重要危险源之一进行监控。安全控制措施

1、组织措施

项目部成立以项目经理为组长的高压线下施工安全领导小组,做到分工明确、责任到人,组织有力,行动迅速。

组 长: 陆为根 副组长:陆金明 组 员:张繁华

2、管理措施

制定高压线附近施工安全专项方案,对项目所有施工及技术人员实行安全风险抵押金制度,做到对高压线下施工安全的全员管理;涉及高压线下施工的必须由专职的安全员和技术人员实行安全值班制度。

每个工点开工前,工区组织相关技术和安全人员对施工作业人员进行安全教育培训,提高现场施工人员高压线下作业的安全意识;技术人员要对高压线距施工现场的垂直及水平距离进行测量,保证安全距离:6米。并对现场施工员进行安全交底,保证施工安全。

大型机械不得进入保护区内作业,大型机械施工必须有专人监护。

3、现场控制措施

在施工现场必须有安全警示标志,并在高压线下采用红色标杆标示出安全施工净空高度;重视个人自我防护,进入工地按规定佩戴安全帽,进入高压线下施工现场的,必须戴好安全帽、穿戴绝缘手套、穿防护鞋、绝缘衣服才能进行施工;严禁穿拖鞋进入施工现场。在高压线下立警戒杆,标杆顶以下为安全作业空间。高压线下安全作业空间内进行挖装作业时,必须有专人进行指挥,施工高度不得高于安全作业空间,防止施工机械碰触高压线。

针对不同区段高压线离地距离,采取不同的安全防护措施,必要时通知电力部门派专人,进行现场管控,起重机械吊装作业时,必须采取绝缘防护措施并设专业人员负责指挥,同时应有施工负责人,安全人员盯场。起重设备操作人员、指挥人员及其他各种工作人员必须是取得操作合格证。起重设备顶部必须安装绝缘套,起重机的吊装小钩必须加设小钩反弹装置,以防止吊物突然下落时起重小钩反弹而触碰高压线,起重机作业半径与架空线路边线的最小安全距离不小于6m,起重设备操作人员、电工在施工期间必须配备绝缘手套、绝缘鞋及高压绝缘垫,并按安全防护用品使用规定穿戴,严禁无防护设施进行施工。

阴雨及大风、大雾、大雪等恶劣性天气停止高压线下及附近施工,防止感应电伤人,禁止高压线疲劳作业。电表及电敏感性仪器在高压线下施工时尽量远离高压线,必须放置在高压线下时,必须加设防护罩,以免仪器损坏。施工现场在明显处设立警示牌,写明高压线电压、安全操作距离,防护措施及注意事项。施工期间发现异常或者检测出机械感

应电集中现象,应立即停止作业,不得自行处理,必须立即上报,由项目部专业人员进行解决。

4、技术措施

根据高压线下施工安全防护要求,最小安全距离为6m。我标段施工前,都需先用全站仪准确测出施工区域内最低点高压线的高度,然后再确定施工机械起升垂直高度固定并设置标杆,在施工过程中派专职安全员24小时监管;特种作业人员必须执证上岗。施工前并对操作人员进行安全交底,对每个墩位位置距高压线的距离和安全操作距离进行技术交底。

(1)机械管理

现场施工机械有吊车、为了确保不发生高压触电事故,工程处制定了高压线下施工机械管理制度。施工过程中必须由工程处安全员、施工员在场监督、指挥的情况下,方可进行施工,违者项目部进行严惩。并由物资部不定期的对机械性能进行检查,严禁机械带病作业。该类型施工机械严禁夜间在高压线附近作业。

(2)安全培训

由安质部、工程部加强对作业现场施工人员、机械操作人员进行安全培训,对高压线下施工注意事项进行讲解,提高人员的安全防范意识。同时对触电事故的急救措施进行讲解,并进行演练。

(3)应急响应

①当现场发生触电事故时应立即起动应急预案。现场管理人员根据出现的险情或有可能出现的险情,迅速逐级上报,次序为现场、办公室、抢险领导小组、上级主管部门。由综合部收集、记录、整理紧急情况信息并向小组及时传递,由小组组长或副组长主持紧急情况处理会议,协调、派遣和统一指挥所有车辆、设备、人员、物资等实施紧急抢救和向上级汇报。事故处理根据事故大小情况来确定,如果事故特别小,根据上级指示可由施工单位自行直接进行处理。如果事故较大或施工单位处理不了,则由施工单位向总包部进行请示,请示启动上一级救援预案。

②紧急情况发生后,现场要做好警戒和疏散工作,保护现场,及时抢救伤员和财产,并由在现场的负责人指挥,在1分钟内电话通报到应急值班室,主要说明紧急情况性质、地点、发生时间、有无伤亡、是否需要派救护车、消防车或警力支援到现场实施抢救,如需可直接拨打120、110等求救电话。

③遇到紧急情况,全体职工应特事特办、急事急办,主动积极地投身到紧急情况的处理中去。各种设备、车辆、器材、物资等应统一调遣,各类人员必须坚决无条件服从组长或副组长的命令和安排,不得拖延、推诿、阻碍紧急情况的处理。

a、高压线短路事故

施工过程中如操作不当造成高压线短路事故,施工人员应立即撤离事故现场并设置警戒线,由现场负责人立即通知吴江供电公司和供电公司电力抢修部门,由电力抢修部门组织抢修,把损失降低到最小。

b、触电事故

现场施工发生触电安全事故以后,工程处必须立即报告到业主或公司安监部,安监部在了解事故准确位置、事故性质、死伤人数及其它有

关情况后,立即报告公司分管领导、主管领导和集团公司有关部门,全过程时间不得超过6小时。

应急准备和响应工作程序图

(5)触电事故的指挥控制

发生触电事故后,立即启动应急预案,工区副经理为现场总指挥,发现事故发生的人员首先用扩音器或喇叭呼喊,并通知现场安全员,由安全员打事故抢救电话“120”,向上级有关部门或医院打电话抢救,同时通知组织应急领导小组进行现场抢救。各负其责,重伤人员由水、电工协助送外抢救工作门卫在大门口迎接米救护的车辆,有程序的处理事故、事件,最大限度的减少,人员和财产损失。紧急救援的一般原则:

以确保人员的安全为第一,其次是控制材料的损失。紧急救援关键是速度。此外要培养施工人员正确的处险意识,凡发现险情要立刻使用事故报警系统进行通报,紧急救援响应者必须是紧急工作组成员,其他人员应该撤离至安全区域,并服从紧急工作组成员的指挥。

下载高压外供电施工总结word格式文档
下载高压外供电施工总结.doc
将本文档下载到自己电脑,方便修改和收藏,请勿使用迅雷等下载。
点此处下载文档

文档为doc格式


声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:645879355@qq.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。

相关范文推荐

    高压防护棚施工方案

    中奥嘉园经济适用房工程A10#楼市政电网 高压线防护方案 一、 工程概况 工程名称:中奥嘉园A4#楼经济适用房及居住公共服务设施等8项工程A10#楼建筑面积14957.97㎡,建筑高度43.7......

    高压注浆堵漏施工方案[范文大全]

    高压注浆堵漏施工方案 一、注浆方式 1、对于混凝土出现的点渗漏,应采用埋没止水针头方式予以注浆堵漏。 2、对混凝土出现的断裂缝,施工缝后浇带形成的渗漏可分别采用埋设注浆......

    外电防护措施

    外电防护措施 高压送电是目前较为普遍的输电方式,同时也对安全用电提出了更高的要求。随着建筑业的迅猛发展,施工现场面临的高压线防护问题也越来越突出。 人们往往存在这样......

    高压电线迁改施工合同

    郭元省际间公路动物卫生监督检查站项目工程内35KV高压电线杆搬迁施工合同 甲方: 九寨沟县畜牧兽医局 乙方: 甲方委托乙方负责九寨沟县郭元省际间公路动物卫生监督检查站项目......

    高压线下施工触电应急预案

    高压线下施工触电应急预案 一、目的 为贯彻落实国家安全生产的法律法规及《建筑法》第四十四条和五十一条关于安全生产的有关规定,执行安全生产责任制度,采取有效措施,防止高压......

    高压旋喷锚索施工方案

    高压旋喷锚索施工方案 原基坑北侧1-1剖面设计为5排锚杆,因相邻基坑施工影响,基坑北侧1-1剖面变更为1'-1'剖面,锚杆设计为5排变更为4排锚杆。(详见绿地高铁站前广场项目D2地块基......

    高压灌注防水堵漏施工方案

    高压灌注防水堵漏施工方案一、工程现状 电厂循环水池出现大面积渗水,现我方技术人员经过现场勘察,特制定出一套切实可行的施工方案。 二、渗水原因 电厂循环水池上方大面......

    高压变频器检修总结

    高压变频器检修总结 从2010年使用智光电气高压变频器至今,在使用过程中变频器故障较多,故障现象基本是以后台所报故障为参考。 经统计变频器自身出现的故障跳车情况,后台所报信......