第一篇:电大建筑施工管理实习报告
建筑施工与管理毕业实践报告
按邯郸广播电视大学的毕业实践安排,我在2014年3月1日到5月30日选择在***********第一工程分公司压力容器厂进行实践学习。压力容器厂是河北冶金建设集团有限公司第一工程分公司的一个分厂,主要从事压力容器与非标设备件的制作。我一直在本厂工作,所以在邯郸电大的要求下我选择了在自己的岗位上实践,把我所学到的知识应用到工作实践中来,以便使我对学到的知识有进一步的认识,再者使自己的工作能更上一层楼。
一、工程概况
公司承接了*******钢厂炼钢喷煤改造工程的压力容器设计制作的任务。现将工程概况介绍如下:*******钢铁有限公司炼铁厂新喷煤技改工程为550m3×2高炉喷煤工程的制粉喷吹车间,压力容器包括4台25m³的喷吹罐、1台40m³的空气储罐、1台40m³的氮气储罐、3台氮气包、1台压缩空气包共计10台。厂长把这项工作全权交代给我负责,虽说我一直在做压力容器,但是我以前就是一个焊工,在焊接方面是没问题的,其他方面感到很吃力,于是一有空闲时间我就请教我的指导老师,向她学习有关压力容器制作的相关工作程序与执行标准。
二、实践内容
压力容器工作程序相当繁琐,但不能混乱,质量控制严格,均要执行国家制定的相关标准。压力容器制作程序是:
(一)首先要拿到业主方的制作条件图,根据条件图进行重新设计,设计的标准是GB150-2011;
(二)图纸设计完成后由工艺员与工艺师进行图纸审核,审核的重点是看设计的压力容器外形尺寸、接管规格与管口方位、支座方位是否与条件图相符,看设计执行标准是否是新标准;
(三)图纸审核没有问题,根据图纸所给参数进行排版,工艺编制;
(四)根据工艺卡的排版尺寸订购材料,做到成本消耗最小化;
(五)材料进场,工艺员把工艺卡交由制作班组长,班组根据工艺卡的排版图与制作工艺进行下料制作,制作过程有质量检查员全程跟踪检查记录;
(六)制作完成,出厂前要经过水压试验或者是气密性实验(有特殊要求的才进行气密性实验),压力大小按图纸设计要求执行,检查人员包括质检员、质检师、工艺师、材料师、技术监督局驻场人员。检查合格需要在场所有人员签字认可,留存档案;
(七)完善资料,技术监督局报批备案。设备合格证随设备交由业主存档。这就是压力容器的制作的全过程。
这次压力容器的制做,我从到尾全程跟踪,从图纸设计到材料订购、从工艺编制到
排版下料、再到设备报验出厂,每个环节都亲身体验了一次。感觉最有收获的是编制工艺,绘制排版图。以前对CAD只是一知半解,会画简单的图形,至于放样啦、排版啦这些难一点的东西是一窍不通呀,所以一有机会我就跟着我的老师学习。其实排版编工艺是最关键的步骤,首先要根据设计图纸计算出筒体的下料尺寸,一般压力容器给出的直径是内径,下料时要用中径(也就是内径加筒体厚度)展开计算,以此算出封头和底座的下料尺寸;然后要和钢材经销商询问目前所用材质的钢板的规格尺寸,根据经销商给提供的规格尺寸进行排版,再根据图纸接管的方位图,来确定焊缝的位置,防止将来接管开孔赶到焊缝上(标准规定接管开孔不允许开在焊缝上);排版图确定了,接着根据工艺员给的板材规格尺寸定料。这次我最大的收获就是学会了使用CAD如何展开放样排版,给大家展示一张我做的排版图这是25m³喷吹罐封头与下椎体的下料排版图,这只是其中的一部分,其实做排版图的目的还是为了节约材料,控制成本。2
焊接工艺指令卡的选择在压力容器中也很重要的,以公司现用的焊接工艺评定为依据,根据容器的实际尺寸和公司的焊接设备确定选用何种焊接方法,已达到高效益高质量的完成制作任务为目的。这次的焊接方法是我选的使用埋弧自动焊,容器直径能满足这种焊接方法,埋弧自动焊焊接效率高、外观成形美观、内在质量容易保证、劳动强度小,操作技术也成熟,再说了我徒弟在当然没问题喽,所以我选择这种焊接方法,焊接参数严格按焊接工艺评定执行。实践证明我的选择是对的,最终的结果是所有的焊缝98%以上一次探伤通过。
制作过程中我还使用一种新的卷板方法,为公司提高效益,降低成本又迈出了新的一步。以前我们筒体卷制时采用下料长度加长400-500mm,卷制好时再用割枪把两头多余的料割掉,这样既浪费了主材,又不利于下一步的焊接。于是我采用了在外地学来的一种新的卷制方法,我用的是净料卷板,先将板卷成D字型筒体见下图:
里面还可以使用埋弧自动焊,这就节省了材料、人工。等埋弧自动焊焊接完成后,再进行找圆。我给筒体找的椭圆度,绝对可以达到标准误差范围的要求。比筒体卷板留直边要强得多。我这个卷圆的小窍门关键是要把握卷D字型时接口不能撅嘴,轻微向里凹点可以,卷D字型时不要出死弯,弯曲弧度越大越容易找圆。这样一节筒体就能节约155㎏的料,这个工程下来就能节约3吨多料。本次工程共买钢材65吨,照这样计算材料成本节约了4%之多。
三、实践收获与体会
这次毕业实践,我的目标是抓好管理、控制质量、节约成本,帮助厂长把这次的任
务按期交工。实际工作中我利用在电大学到的知识充实到自己的头脑中来,兢兢业业的工作,统筹安排时间,每道工序衔接良好,严格控制每个质量检查点,绝不放过任何一个有瑕疵的地方,工作做到精益求精,为公司创造更大的效益。这次所获得的实践经验将对我终身受益,在我毕业后的实际工作中将不断的得到验证,我会不断的理解和体会实习中所学到的知识,在未来的工作中我将把我所学到的理论知识和实践经验不断的应用到实际工作来,充分展示自我的个人价值和人生价值。为实现自我的理想和光明的前程努力。
12秋建筑与施工管理专科
*****
2014-5-24
第二篇:建筑施工管理实习报告
建筑工程学院2014届顶岗实习报告
目录
一、(一)
(二)总体概述..............................2 公司简介...............................2 工程概况...............................2
二、(一)
(二)实习内容..............................2 实习岗位...............................2 岗位职责...............................2
三、实习经验与分析.........................2
测量定位...........................3
模板工程质量通病防治措施.......................3
钢筋工程质量通病防治措施.......................3 混凝土工程质量通病防治措施..........................4(一)(二)(三)(四)
四、五、工作总结..............................6 致谢...............................7
一、总体概述
(一)公司简介
××建工集团总承包公司是××建工集团旗下的一家全资子公司。其前身为××建工集团有限责任公司总承包部,是以建筑、安装为主业的国有建筑企业,具有房屋建筑工程施工总承包和市政公用工程施工总承包壹级资质,拥有地基与基础工程、土石方工程、建筑装修装饰工程、堤防工程、机电安装工程、消防设施工程专业承包贰级资质。
(二)工程概况
1.本工程为“凤江绿缘”住宅楼项目,本项目基地处在××市南郊良凤江国家森林公园附近,位于××大道延长线以南,××路以东,地上24层,地下2层,屋面高75.30米,建筑类别为丙类,防火为甲级,抗震等级为:剪力墙四级,框架四级;
2.室内±0.000为相当于绝对标高99.100m;
3.结构的设计使用年限为50年;结构的安全等级为二级;
4.抗震设防类别为丙类,抗震设防烈度为6度,地震作用和抗震措施均为6度;
5.地基基础设计等级及桩基础设计等级为乙级;建筑物的耐火等级为一级;
6.地下室防水混凝土的设计抗渗等级为P8,地下室防水等级二级;
7.砌体结构施工质量控制等级B级。
二、实习内容
(一)实习岗位
土建施工员
(二)岗位职责
8.负责施工组织和实施,保证工程进度,组织施工测量;
9.负责协调各工种之间的施工矛盾,控制施工材料及保证供应,配合项目部进行成本管理;
10.负责贯彻施工组织设计意图,按照工程质量和安全生产保证计划进行施工管理。
三、实习经验与分析
(一)测量定位
1.建筑物的轴线,高度及外墙垂直度,必须用全站仪或经纬仪严格控制,现浇楼板平整度,必须用水准仪做好水平控制点,确保工程的垂直度及楼板平整度。
2.建筑物的沉降观察及倾斜测检:按每完成两层主体结构后及主体完工后每月进行一次测检,做好有关的质量记录,如发现问题应立即通知有关部门及负责人处理。
(二)模板工程质量通病防治措施
模板安装前,先检查模板的质量,不符质量标准的不得投入使用。
1.梁模板
通病现象:梁身不平直、梁底不平及下挠、梁侧模炸模、局部模板嵌入柱梁间、拆除困难。
防治措施:支模时应遵守边模包底模的原则,梁模与柱模连接处,下料尺寸一般应略为缩短;梁侧模必须有压脚板、斜撑、拉线通直后将梁模钉固。梁底模板按规定起拱;混凝土浇筑前,模板应充分浇水湿润。
2.柱模板
通病现象:暴模、断面尺寸鼓出、漏浆、混凝土不密实,或蜂窝麻面、偏位、柱身扭曲。
防治措施:根据规定的柱箍间距要求钉牢固;成排柱模支模时,应先立两端柱模,校直与复核位置无误后,顶部拉通长线,再立中间柱模;四周斜撑要牢固。
3.板模板
通病现象:板中部下挠,板底混凝土面不平。
防治措施:楼板模板厚度要一致,櫊栅用料要有足够的强度和刚度,櫊栅面要平整;支顶要按方案执行;板模按规定起拱。
(三)钢筋工程质量通病防治措施
1.竖向钢筋偏位质量通病的防治措施
在立框架柱模板支撑系统前,宜在现浇混凝土楼面上预埋φ12的钢筋头或φ48的短钢管作为支点,间距不大于1m,并使斜支撑能与支点有牢固的连接,起到撑顶、反拉和调节垂直度的作用。
钢筋放样时注意梁、柱筋的排列,尽量减少竖向主筋因排列问题而产生的位移。
在梁柱节点钢筋密集处,在柱与梁顶交界处,扎筋时给框架柱增加一个限位箍筋,用电焊将它与梁的箍筋点焊固定,再将柱主筋逐一绑扎牢固,并沿柱高临时绑扎间距不大于@500的箍筋,确保节点处柱筋在浇捣混凝土时不会发生偏位。
加强混凝土的现场浇筑管理工作,认真进行技术交底,严禁将整车或整料斗的混凝土直接灌注到柱、墙内,不得随意冲撞构件的钢筋骨架。均匀下料,分层浇筑,分层振捣,这样既能保证混凝土的施工质量,又可防止撞偏钢筋骨架。
在进行竖向钢筋的搭接、焊接和机械连接前应先搭好脚手架,在上部通过吊线,用钢管固定住上部的托筋位置,使接长的钢筋能准确地套在箍筋范围内,这样在脚手架上安装柱的钢筋,绑扎箍筋,既安全,又能保证框架柱骨架不扭曲、不倾斜,还能提高工效。
2.钢筋绑扎与安装
钢筋骨架外形尺寸不准:绑扎时宜将多根钢筋端部对齐,防止绑扎时,钢筋偏离规定位置及骨架扭曲变形。
保护层砂浆垫块应准确,垫块步距取800×800,否则导致平板悬臂板面出现裂缝,梁底柱侧露筋。
钢筋骨架绑扎完成后,会出现斜向一方,绑扎时铁线应绑成八字形。左右口绑扎发现箍筋遗漏、间距不对要及时调整好。
柱子箍筋接头没错开放置,绑扎前要先检查:绑扎完成后再检查,若有错误应即纠正。浇筑混凝土时,受到侧压钢筋位置出现位移时,就及时调整。
(四)混凝土工程质量通病防治措施
1.蜂窝
产生原因:振捣不密实或漏振;模板缝隙过大导致水泥浆流失,钢筋较密或石子相应过大。
预防措施:按规定使用和移动振动器。中途停歇后再浇捣时,新旧接缝范围要小心振捣。模板安装前应清理模板表面及模板拼缝处的黏浆,才能使接缝严密。若接缝宽度超过2.5mm,应予以填封,梁筋过密时应选择相应的石子粒径。
2.露筋
产生原因:主筋保护层垫块不足,导致钢筋紧贴模板;振捣不实。
预防措施:钢筋垫块厚要符合设计规定的保护层厚度;垫块放置间距适当,钢筋直
径较小时垫块部距宜密些,使钢筋自重挠度减少;使用振动器必须待混凝土中气泡完全排除后才能移动。
3.麻面
产生原因:模板表面不光滑;模板湿润不够。
预防措施:模板应平整光滑,安装前要把粘浆清除干净,浇捣前对模板要浇水湿润。
4.孔洞
产生原因:在钢筋较密的部位,混凝土被卡住或漏振。
预防措施:对钢筋较密的部位(如梁柱接头)应分次下料,缩小分层振捣的厚度;按照规程使用振动器。
5.缝隙及夹渣
产生原因:施工缝没有按规定进行清理和浇浆,特别是柱头和楼梯施工缝。
预防措施:浇注前对柱头、施工缝、楼梯施工缝等部位重新检查,清理杂物、泥沙、木屑。
6.墙柱底部缺陷(烂根)
产生原因:模板下口缝隙不严密,导致漏水泥浆;或浇筑前没有先浇灌足够50mm厚以上水泥砂浆。
预防措施:模板缝隙宽度超过2.5mm应予以填塞严密,特别防止侧板吊脚;浇注混凝土前先浇50-100m厚的水泥砂浆。
7.梁柱结点处(接头)断面尺寸偏差过大
产生原因:柱头模板刚度差,或把安装柱头模板放在楼层模板安装的最后阶段,缺乏质量控制和监督。
预防措施:安装梁板模板前,先安装梁柱接头模板,并检查其断面尺寸、垂直度、刚度符合要求才允许接驳梁模板。
8.楼板表面平整度差
产生原因:振捣后没有用托板、刮尺抹平;梯级和斜水部位没有符合尺寸的模具定位;混凝土未达终凝就在上面行人和操作。
预防措施:浇捣楼面应使用托板或刮尺抹平,梯级要使用平直、厚度符合要求的模具定位;混凝土达到1.2Mpa后才允许在混凝土面上操作。
9.混凝土表面不规则裂缝
产生原因:一般是淋水保养不及时,湿润不足,水分蒸发过快或厚大构件温差收缩。预防措施:混凝土终凝后立即进行淋水保养;高温或干燥天气要加麻袋等覆盖,保持构件有较久的湿润时间。大体积混凝土施工方案专项方案执行。
10.缺棱掉角
产生的原因:投料不准确,搅拌不均匀,出现局部强度低;或拆模板过早,拆模板方法不当。
预防产生的措施:指定专人监控投料,投料计量准确;搅拌时间要足够;拆模应在混凝土强度能保证其表面及棱角在拆除模板不受损坏时方能拆除。拆除时对构件棱角应予以保护。
11.钢筋保护层垫块脆裂
产生的原因:垫块强度过低;沉置钢筋笼时冲力过大。
预防产生的措施:垫块的强度保证达要求,并能抵御钢筋放置时的冲击力;当承托较大的梁钢筋时,垫块中应加钢筋或铁丝增强。
四、工作总结
通过半年的顶岗实习,不仅磨练了吃苦耐劳的意志,也看开阔了视野,扩大了知识面。使我了解建筑施工的全过程并初步掌握了建筑施工管理的主要内容、程序和方法,增强了实践能力同时也加深了对理论知识的理解。
实习期间,我还深深体会到为人处事的原则:待人真诚友好,不要浮华虚伪,跟社会上每个人打交道都要有一颗热忱的心;虚心学习,积极主动,不要自以为是、自高自大;说话注意分寸与技巧,要大方得体,轻重适宜、恰当合理、兼顾多方;细致深入.无论做什么事情都不要浮于表面,只知其
一、不知其二,明其事更应该明其理.不要半懂不懂,一定要深入的了解。
实习期间,我也发现自己存在的不足,主要有以下几点:
(一)、专业知识掌握的不够全面。当前所掌握的知识面不够广,对最新的施工规范没有熟练掌握,致使不能很快地判断出施工的对错。因此要在在实践中不断地学习,才会掌握更多专业知识和技能。
(二)、专业实践阅历远不够丰富。由于专业实习时间较少,因此很难将所学知识运用与实践中去,通过实践所获取的阅历更是很短缺。所以,今后我们在工作岗位上,一
定要抓住机会,多向从事建筑工程的前辈学习,同时要转换学习方法和态度,改变以往过于依赖老师的被动吸收学习方式,应主动积极向他人学习和请教,同时加强自学能力和驾驭解决难题的本领。
(三)、专业知识在工程中运用不够灵活。这主要是对所学的知识没有形成一套完整的体系,这些零散的知识点运用起来很困难,因此,今后在学习和实践中应该重视积累和运用,使所学的知识由量变到质变,发挥更大的指导作用。
五、致谢
首先感谢广西建工集团建筑工程总承包有限公司为我提供这次宝贵的实习机会,同时感谢同事们的悉心指导。最后我非常感谢学院的老师,一直以来老师们给了我很多帮助和支持。在此,谨向老师们致以诚挚的谢意和崇高的敬意!
第三篇:建筑施工管理测量实习报告
山东广播电视大学社会实践考核表
实 践 课 题 测量实训报告
建筑施工管理测量实习报告
中央广播电视大学专科10春建筑施工管理侯成龙
这次实习的内容是对工程测量知识的实践化,实习的要求是让每个同学都对工程测量的实际操作能够达到基本掌握的程度。这次实习与以前的课堂实习相比,时间更加集中、内容更加广泛、程序更加系统,完全从控制测量生产实际出发,加深对书本知识的进一步理解、掌握与综合应用,是培养我们理论联系实际、独立工作能力、综合分析问题和解决问题的能力、组织管理能力等方面素质。也是一次具体的、生动的、全面的技术实践活动。
在实习的第一天,由老师给我们做了实习的动员。在动员会上,常老师强调了本次实习的重要性,并分析了建筑地理条件较复杂及建筑物密集等因素给本次实习带来的困难。并鼓励同学们努力克服困难,努力完成本次实习。还讲解了仪器操作、搬迁中的注意事项,并要求在实习期间自行保管实习备品。本次实习中需要用到的仪器主要有水准仪、水准尺、脚架、经纬仪。当天我们就正式开始了室外的测量工作。
(二)实习目的1.通过学习建筑施工测量基本知识,了解建筑施工测量的任务和特点,掌握建筑物放样以及变形观测的基本方法。
2.通过测量实训巩固和加深所学知识,进一步掌握测量仪器的基本操作技能、控制测量方法、地形图的应用和施工测量的基本方法。
(四)实习心得
为期两个星期的工程测量学习已经结束了,通过这次实习,让我深刻明白了理论联系实际的重要性。测区是我辽宁工程技术学院校区,虽然测区比较大,基本上是整个学校,测绘图也是我们整个学校的平面图,为了能尽快地完成任务,我们小组星期
六、星期天加班进行测量,我们在测量的过程中也并不感到累,也没有感到辛苦,反而还能自得其乐。
测量学首先是一项精确的工作,通过在学校期间在课堂上对测量学的学习,使我在脑海中形成了一个基本的、理论的测量学轮廓,而实习的目的,就是要将这些理论与实际工程联系起来。测量学是研究地球的形状和大小以及地面点位的科学,从本质上讲,测量学主要完成的任务就是确定地面目标在三维空间的位置以及随时间的变化。在信息社会里,测量学的作用日益重要,测量成果做为地球信息系统的基础,提供了最基本的空间位置信息。构建信息高速公路、基础地理信息系统及各种专题的和专业的地理信息系统,均迫切要求建立具有统一标准,可共享的测量数据库和测量成果信息系统。因此测量成为获取和更新基础地理信息最可靠,最准确的手段。测量学的分类有很多种,如普通测量学、大地测量学、摄影测量学、工程测量学。作为建筑施工管理系的学生,我们要学习测量的各个
方面。测绘学基础就是这些专业知识的基础。
通过这次实习,学到了测量的实际能力,更有面对困难的忍耐力;也学到了小组之间的团结、默契,更锻炼了自己很多测绘的能力。首先,是熟悉了水准仪、经纬仪的用途,熟练了水准仪、经纬仪的各种使用方法,掌握了仪器的检验和校正方法。其次,在对数据的检查和矫正的过程中,明白了各种测量误差的来源,其主要有三个方面:仪器误差(仪器本身所决定,属客观误差来源)、观测误差(由于人员的技术水平而造成,属于主观误差来源)、外界影响误差(受到如温度、大气折射等外界因素的影响而这些因素又时时处于变动中而难以控制,属于可变动误差来源)。了解了如何避免测量结果错误,最大限度的减少测量误差的方法,即要作到:(1)在仪器选择上要选择精度较高的合适仪器。(2)提高自身的测量水平,降低误差水平。(3)通过各种处理数据的数学方法如:距离测量中的温度改正、尺长改正,多次测量取平均值等来减少误差。第三,除了熟悉了仪器的使用和明白了误差的来源和减少措施,还应掌握一套科学的测量方法,在测量中要遵循一定的测量原则,如:“从整体到局部”、“先控制后碎部”、“由高级到低级”的工作原则,并做到“步步有检核”。这样做不但可以防止误差的积累,及时发现错误,更可以提高测量的效率。通过实践,真正学到了很多实实在在的东西,比如对测量仪器的操作、整平更加熟练,学会了数字化地形图的绘制和碎部的测量等课堂上无法做到的东西,很大程度上提高了动手和动脑的能力。
我们在这次的实习中,也了解到了要想很好地进行测量,首先必须要掌握过硬的基本理论知识,要有实干精神,每个组员都必须亲自实践,而且要分工明确,工作也可以交换来做,还需要知道失败乃成功之母,在实习测量的过程中,不可能完全的没有错误,我们应该不气馁,继续一次又一次的重测,重计算,一次次地练习,一次次得提高测量水平,我们不断在经验中获得教训。而且也多亏了老师的指导,我们实习之初,遇到了各种各样的困难,多亏的老师的耐心讲解,才使我们解决了不少测量中的难题。
我们在实习过程中,不可避免的遇到了一些困难,在我们实现之初,我还有点担心自己不会测,测不好,担心只有两个星期的测量时间,自己不能按时的完成任务,但是,经过我们小组的反复测量,我们的团结、默契,克服了测量中的种
种问题,终于按时完成了任务。在测量实习的过程中,我们也遇到了各种各样的困难。比如:
(1)立标尺时,标尺除立直外,还要选在重要的地方。因此,选点就非常重要,点一定要选在有代表性的地方,同时要注意并非点越多越好,相反选取的无用点过多不但会增加测量,计算和绘图的劳动量和多费时间,而且会因点多而杂乱产生较大的误差。
(2)在用水准仪和经纬仪测量的过程当中,有的过程出现了大的误差,经过我们的重新测量计算,误差范围也减小到了可以允许的范围里。
(3)还有就是计算问题,计算必须由两个人完成,一个初步的计算,一个检验,不过,在此过程当中,也还是出现了计算错误的问题,我们在不断的重复检验之中算出了正确的数值,尽量让误差减少到了最少。
通过实际的测量实习,让我学到了很多实实在在的东西,比如对仪器的操作更加熟练,学会了地形图的绘制和碎部的测量等课堂上无法做到的东西,很大程度上提高了动手和动脑的能力,同时也拓展了与同学的交际、合作的能力。一次测量实习要完整的做完,单单靠一个人的力量和构思是远远不够的,只有小组的合作和团结才能让实习快速而高效的完成。
第四篇:新疆电大建筑施工与管理专业毕业实习报告(范文)
新疆广播电视大学
“人才培养模式改革和开放教育试点”
建筑施工与管理专业(专科)
实习报告
学 号: 姓 名: 指导教师: 教 学 班: 分校工作站:
***33 付 华 真 魏
海
林 2012秋建筑施工与管理 省 直 电 大
时间:年 月 日
目录
一、实习目的 ··································································································· 1
1、实习的意义 ····································································································································· 1
2、实习要求 ········································································································································· 1
二、实习内容 ··································································································· 2
1、工程概况 ········································································································································· 2
2、实习过程 ········································································································································· 2
3、实习收获 ········································································································································· 4 3.1图纸会审 ······························································································································· 4 3.2施工准备 ······························································································································· 4 3.3施工协调管理 ······················································································································· 6 3.4抹灰工程: ··························································································································· 7 3.5 混凝土的浇注 ······················································································································ 8
三、实习感悟: ······························································································· 9
四、参考文献: ····························································································· 11
3)对组织的专业参观、专业报告都要详细记录并加以整理。
二、实习内容
1、工程概况
工程名称:常州河苑花园小区 建筑面积:21万㎡
结构层数:地上6层(局部7层)设计单位:常州规划设计研究院
项目总承包单位:常州华丰建设开发有限公司 施工总承包单位:上海华宏建筑发展有限公司 开工竣工日期:2010年3月9日----2010年11月30日
2、实习过程
我们进入工地的日期是2010年7月13日,此时部分工程结构基本框架部分已经完成,个别结构主体已经完工,要开始安装装饰工程的施工了。但仍有部分主体没有完成,这就给了我们学习到更多东西的机会。
进入工地的前几天我们重点熟悉施工图纸和参观工地。在之前的学习过程中,对施工图纸以及用处,有的只是理论层面的认识,读的施工图也都是比较典型常见的图,但看到这样真正用于施工的成体系、成整体的图纸还是第一次,包括了建筑施工图、结构施工图、安装施工图、装饰施工图以及玻璃幕墙安装施工图等几个部分,每个部分都是一本图纸。这让我深刻的体会到土木工程建设是一个庞大的工程,需要各部门的通力合作。而且这些图纸表面磨损很严重,我想大概是经常需要在施工过程中临时参考图纸,针对不同的问题由施工方和设计人员结合图纸提出不同的解决方案。
在阅读图纸的过程中,发现了图纸中的一些问题,为此我请教了一些技术人员,技术人员告诉我,这些问题他们已经发现,并且准备进行会审,为此他给我讲解了一些关于图纸会审的知识,之后我查阅了相关资料,收获颇丰。
在参观了工地之后,我不由得对如此复杂的工程产生了强烈的好奇之心,“万丈高楼平地起”,那么这样的一栋建筑又是如何开始的呢?遗憾的是我没有从工程开始的第一天就来到这里,不过幸好我们的技术人员非常热情的对我讲解了工程开始之前的一些准备工作和管理工作的一些协调工作,使我感慨良多。
在实习期间,我与技术人员、工人师傅建立了良好的师生关系。互相经常交流思想,尊重实习指导人的指导和安排。一进入实习工地,首先对整个工程及工
一方面在校期间要学好专业课,使自己具有较高的专业水平。
3、实习收获
在实习过程中,有一些主体工程没有完成,我们也有幸有这个机会学习主体构造的建造方法,在这里,我将实习过程中学习到的知识和注意事项做一个总结: 3.1图纸会审
图纸会审,施工单位、监理等单位及其他各个专业的工程技术人员针对图纸肯定或可能存在的影响工程质量的问题,对图纸的优化建议以文字性汇报材料分发会审人员讨论达到合理效果。
图纸会审可采用全部图纸集中会审、分部图纸会审、分阶段图纸会审及分专业图纸会审等,具体会审形式由监理确定。各个参建单位对施工图、工程联系单、及图纸会审记录做好备挡工作。作废的图纸设计以书面形式通知,各个施工单位自行处理,不得影响施工建设。
图纸会审应严格坚持先大后小、先重点后一般的基本原则进行。即始终围绕着减少施工难度、提高我方经济效益、降低生产成本、提高生产效率、有利于工程质量、确保施工安全,加快施工进度的各项目标而展开,最后进行图纸纠错并进行图纸的最后确定及相关的辅助措施的确定。
参加图纸会审人员一般包括:
建设方:现场负责人员及其他技术人员;
设计方:设计院总工程师、项目负责人及各个专业设计负责人; 监理方:项目总监、副总监及各个专业监理工程师;
施工单位:项目经理、项目副经理、项目总工程师及各专业相关技术负责人; 其他相关单位:技术负责人以及现场负责人。3.2施工准备
施工准备工作一般包括施工物资准备工作和技术准备工作。3.2.1物资准备
工程开工前应落实好材料货源,并要对准备进场的材料进行严格的预测试,测试合格再获得监理工程师同意,方可采用购到工地,并按照进度计划,与供货单位订好正式供给合同,确保施工中不发生停工等料的误工情况。准备足够机械设备,以满足突击施工的需要,并准备充分的备用机械。对各种设备及机械进行预检修,达到性能良好和安全可靠的标准后,方可进场使用。并备足常用配件,确保施工中不发生大的损失和修理,从而不影响施工质量和进度。
边,纵向到底的逐层管理,做到责任落实到人,从保护自己亦保护他人。财务科负责对施工队进行工程拔款控制,并进行工程成本考核与分析,随时提供这方面的报告,供项目经理进行决策。
机材科统一控制全合同段内各种大宗材料的购置和保管,做到有计划、高质量、低价格、监控好各施工队自购材料的质量和价格,最大限度地降低工程材料的成本,堵塞漏洞。
综合办公室负责项目部内日常生活、生产后勤事务,以及对外协调、处理与当地政府、村镇百姓的关系,创造一个良好的周边环境,以利于工程施工。3.3施工协调管理 3.3.1内部施工队的协调
在施工过程中,项目部对各个施工队的设备、人员、资金以及施工场地等进行合理安排和调控,以达到最佳的施工效率和效益。3.3.2监理工程师的协调
在施工全过程中,严格按照业主和监理工程师批准的施工规范、施工组织设计进行对各作业队的质量管理,在作业队自检、项目部专检的基础上,接受监理工程师的验收和检查,并按照监理要求,予以整改确保工程的无误进行。
贯彻业主和监理工程师制定的质量控制、检查、管理制度,并据此对各施工队予以控制,确保工程达到检验合格,坚决杜绝现场施工队和包工队不服从监理工程师的不正常现象发生,使监理工程师的一切指令得到全面执行与贯彻。
所有进入现场使用的成品、半成品材料,设备、器具、均主动向监理工程师提交产品合格证或质保书,应按规定使用前需进行物理化学试验检测的材料,主动递交检测结果报告,使所使用的材料、设备不给工程造成浪费。
按部位或分项工序检验质量的工程,严格执行“上道工序不合格,下道工序不施工”的原则,使监理工程师能顺利开展工作。对可能出现的工作意见不一的情况遵循“先执行监理的指导,后予以磋商统一”的原则,在现场质量管理中,维护好监理的权威性。
3.3.3与设计单位间的工作协调
如果中标,我单位立即同设计代表取得联系,进一步了解本工程的设计意图及工程要求,听取设计代表对我单位的施工实施方案提出建议。
积极参与设计深化工作,主持施工图审查,完善设计内容。对实际施工中发现的设计不妥之处,以及不适应实际地形、地质的细部设计,或由于地质、地形
③弹出准线和墙裙、踢脚板线:装饰工程进行前,一般要用水准仪在墙上放出一根50基准线(距楼面标高50cm),用该线上翻或下翻来控制顶棚、地面标高和墙裙、踢脚板上口水平线。
3.4.2抹灰施工顺序和基本要求
①抹灰施工顺序:一般先外墙后内墙、先顶棚、墙面后地面。外墙由屋檐开始自上而下,先抹阳角线、台口线,后抹窗和墙面,再抹勒脚、散水和明沟;内墙和顶棚应在屋面防水完工后进行,一般先房间后走廊,再楼梯和门厅。
②分层抹灰:底层抹灰厚度一般5~9mm,作用是使抹灰层与基层牢固结合,并对基层初步找平,底层涂抹后应间隔一定时间,让其干燥和水分蒸发后再涂抹中间层和罩面层;中间层起找平作用,可一次或分次涂抹,厚度约5~12mm,在灰浆凝固前应交叉刻痕,以增强与面层的粘结;面层厚度一般为2~5mm,应确保表面平整、光滑、无裂纹。
③抹灰层厚度:抹灰层厚度一般为15~20mm,最厚不超过25mm。室内墙裙和踢脚板一般要比罩面层凸出3~5mm。在加气砼基层上抹灰时,其底灰和中间层的灰浆强度宜与加气砼强度相近,底灰宜用中砂,中层和罩面层宜用中砂。水泥砂浆不得抹在石灰砂浆层上。
④细部构造:外墙窗台、窗楣、雨篷、阳台、压顶和突出墙面腰线等,上面应做流水坡度(一般10%),下面应做滴水线或滴水槽,其深度和宽度均不小于10mm。
3.5 混凝土的浇注 3.5.1原材料试验
混凝土面层水泥采用硅酸盐水泥。水泥进场时应有产品合格证及化验单,并对水泥的品种、标号、包装、数量、出厂日期进行检查验收。不同标号、厂牌、品种、出厂日期的水泥,不得混合堆放,严禁混合使用。出厂期超过2个月或受潮的水泥,坚决弃之不用。已经结块变质的水泥不得使用。砂采用洁净、坚硬,符合规定级配,细度模数在2.5以上的粗、中砂。砂的技术要求要符合规范的规定。石子要求质地坚硬、耐久、洁净、有良好的级配。颗粒应接近立方体,最大粒径不超过40mm。混凝土掺用的外加剂,经配合比试验符合要求方可使用。外加剂应符合《混凝土外加剂》(GB/T2847)的规定。3.5.2 配合比设计和控制
采用干硬性混凝土,配合比设计时坍落度为0~2cm。混凝土配合比要保证混
由于施工方的水平有限,也难免会出现各种大小问题,师傅就会找项目经理或施工员谈话,要求认真对待,我也从中学到了一些质量控制的知识。
这次施工实习虽然时间很短,但是我不但学到了很多施工技术,管理方面的基本知识,还学到了监理专业的一些常识,并且经常深入工地,在第一线进行学习,理论与实践相结合,在短短几天内,个人能力得到了一定的提升,并且在工作中得到了师傅们和总监的认可,总监也对我的工作给与了比较高的评价。我在工作中,学会了融入团队中来,依靠团队的力量,解决困难的问题。热情对待工作,对待周围的人。
在实习的过程中,我越来越觉得人际交往的重要性。而人际交往最重要的是首先要尊重人,无论是一线工人还是项目经理,都要谦逊对待,其次是自己要主动交流自己的想法,这样能第一时间纠正自己错误的理解,第一时间接触最新的情况,更扎实的打好专业基础。
0
第五篇:建筑施工实习报告
建筑施工实习报告
经过学校的安排我于2012年12月10日~2012年12月14日进行了一个星期的建筑施工实习,这次实习是书本和实践相互结合很好机会,经过这次实习让我受益匪浅。
一 工程简介
(1)建业桂园:本工程为平顶山建业桂园二期工程,位于平顶山新城区龙翔大道与育英路交叉口西北角。本期工程建筑面积189284.03m²,其中地下建筑面积33230.44m²,地上建筑面积156053.59m²。住宅地上33层(共6栋),30层(1栋),公寓为6层,沿街商业及幼儿园2层;结构安全等级为二级,结构抗震等级住宅楼地下室1层及以上三级,地下室2层四级,幼儿园,公寓两层商业为四级。
(2)德馨苑公共租赁住宅小区:该小区的建筑面积为37222.74平方米,在2012年11月2日开工,计划竣工日期为2014年3月11日。该建筑抗震等级为4级,抗震设防烈度为6度,使用年限为50年。
(3)荣邦大厦:该大厦规划面积5138.4平方米,设计为地上17层地下1层的办公楼,总面积22017.65平方米。这栋建筑是框剪结构。二 实习内容
1)钢筋的种类及外形特征; 2)钢筋的焊接办法及品质规定; 3)钢筋的绑扎的办法及品质规定; 4)钢筋绑扎的搭接长度规定;
5)了解土方工程的特点及回填土的质量的要求,了解屋面防水及地下防水的施工方法; 6)了解混凝土浇筑前应对对模板及其支架以及钢筋工程的检查工程;
7)了解砖墙的砌筑方法,了解墙体的构造要求;了解墙面,地面的施工要求; 8)通过查阅资料懂得施工组织和概预算的编制方法。
三 心得体会
一、基坑支护:包括基坑支护方案、土方开挖方案、支护变形监测、沉降观测、基坑支护验收。
基坑开挖之前,要按照土质情况、基坑深度以及周边环境确定支护方案,其内容应包括:放坡要求、支护结构设计,机构选择,开挖时间、开挖顺序、分层开挖深度、坡道位置、车辆进出道路、降水措施及监测要求等,针对施工工艺结合作业条件,对施工过程中可能造成坍塌的因素和作业人员的安全以及防止周边建筑、道路等产生不均匀沉降,制定具体可行的施工方案。
深基坑施工时,土侧压力加大加上地下水的出现,必须做专项支护设计以确保施工安全。基坑(槽)开挖时,会发生一些不可预见的因素,都会引起坍塌事故的发生,所以,应有土方开挖方案,必须有人负责支护变形监测,特别是雨后和解冻期,如果发现边坡或坡顶处有裂缝,疏松,或支撑有折断,走动等危险迹象时,应立即采取加固措施。
深基坑施工时,边坡或支撑的松动,降排地下水,局部流砂现象等,都可能引起附近土层的变动,因此应对毗邻建筑物和重要管线和道路进行沉降或位移观测,以便及时采取措施,阻止沉降或位移的发展。
基坑支护验收是在基坑支护完成后,对基坑支护情况进行验收。
二、模板工程:包括模板施工方案、模板工程验收、拆模申请、支、拆模安全交底。施工前,应对边坡侧立面挡土墙模板进行施工设计。模板及其支架的强度、刚度和稳定性应满足各施工阶段荷载的要求,能承受浇筑混凝土的冲击力、混凝上的侧压力和施工中产生的各项荷载。
模板施工发生问题的主要原因有:模板拆除后,混凝土未达到设计强度,在楼板上堆物过 1 多,使楼板超过允许荷载;现浇混凝土模板支撑,没有经过设计计算,支撑系统强度不足,在浇注混凝土过程中,造成整体失稳坍塌等。模板安装完毕,必须由该现场技术负责人组织,按照设计要求检查验收后,才能浇筑混凝土。模板支撑的拆除,必须确诊混凝土强度达到设计要求时经申报批准后才能进行。支、拆模前,由负责该项施工的工长对作业班组进行书面安全技术交底规定搭拆的操作顺序,模板结构和安全操作规程。
三、防水:是非常重要的工程,影响建筑物的寿命和功能发挥。常做部位:地下,屋面,墙面,楼地面。地下防水的施工为了消除所有孔洞造成的渗漏,使接缝严实,形成封闭的整体。防水层的施工工艺顺序:基面处理→涂布基层处理剂→细部增强→铺第一(二)层卷材→接缝处理→保护层。该建筑的防水卷材采用的是外贴法:墙体结构→防水→保护(先底后立面)。这种方法结构及防水层质量易检查,但槽宽大,工期长。搭接长度≮100;上下层错缝1/3~1/2幅宽。不同的材料不同的防水等级,层数、厚度不同。
四、钢筋:钢筋是指钢筋混凝土用和预应力钢筋混凝土用钢材,其横截面为圆形,有时为带有圆角的方形。包括光圆钢筋、带肋:热轧钢筋、余热处理钢筋、冷拉钢筋、冷拔钢筋、冷轧钢筋等。HPB235热轧光圆一级钢筋、HRB335热轧带肋二级钢筋、HRB400热轧带肋三级钢筋、RRB400余热处理三级钢筋。
1)钢筋的混凝土保护层是指主筋外皮主筋外皮主筋外皮主筋外皮与混凝土面之间的距离。2)钢筋的锚固长度是指钢筋伸入支座内的长度。
3)1.直钢筋的下料长度=构件长度-混凝土保护层厚度+弯钩增加长度 2.弯起钢筋下料长度=直段长度+斜段长度-弯钩调整值+弯钩增加长度
3.箍筋下料长度=外皮周长-弯曲调整值+弯钩增加长度(箍筋下料长度=外皮周长+箍筋调整)
4)钢筋的搭接:绑扎搭接,焊接(闪光对焊,电渣压力焊)和机械连接。其中绑扎搭接是指两根钢筋相互有一定的重叠长度,用铁丝绑扎的连接方法,适用于较小直径的钢筋连接。一般用于混凝土内的加强筋网,经纬均匀排列,不用焊接,只须铁丝固定。闪光对焊:原理是利用对焊机使两端金属接触,通过低电压的强电流,待金属被加热到一定温度变软后,进行轴向加压顶锻,形成对焊接头。钢筋闪光对焊是将两根钢筋安装放成对接形式,利用焊接电流通过两根钢筋接触点产生的电阻热,使接触点金属熔化,产生强烈飞溅,形成闪光,迅速施加顶锻力完成的一种压焊方法。机械连接:通过钢筋与连接件的机械咬合作用或钢筋端面的承压作用将一根钢筋的力传递至另一根钢筋的连接方法。钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋徽粗直螺纹套筒连接和钢筋滚压直螺纹套筒连接。结构构件中纵向受力钢筋的接头宜相互错开,钢筋机械连接的连接区段长度应按35 d 计算(d 为被连接钢筋中的较大直径)。
五、自动消防系统:一般由火灾探测器、区域报警器和集中报警器组成;也可以根据工程的要求同各种灭火设施和通讯装置联动,以形成中心控制系统,即由自动报警、自动灭火、安全疏散等组成一个完整的消防控制系统。火灾探测器是探测火灾的仪器,由于在火灾发生的阶段,将伴随产生烟雾、高温和火光。这些烟、热和光可以通过探测器转变为电信号报警或使自动灭火系统启动,及时扑灭火灾。自动控制消防喷淋系统是一种在发生火灾时,能自动打开喷头喷水灭火并同时发出火灾报警信号的消防灭火设施。自动喷淋灭火系统具有自动喷水、自动报警和初期火灾降温等优点,并且可以和其他消防设施同步联动工作,因此能有效控制、扑灭初期火灾。现已广泛应用于建筑消防中。自动消防喷淋系统分为感烟式和感温式两种。
六、通风系统:自然通风和机械通风。一般商场办公区建筑采用机械通风。机械通风机作用使空气流动,造成房间通风换气的方法。该通风系统是由室外新鲜空气在送风机的作用下经过空气处理设备、送风管道和送风口送入室内,污染后的室内空气在排风机的作用 2 下直接送出室外或送入空气净化处理设备。该系统是由空气过滤器、空气加热器、风机、电动机、风管、送风口、轴流风机构成。
七、价格分析 主要对建材市场的建筑材料墙纸,整体橱柜,灯具进行价格分析。
墙纸分类:pvc,织物壁纸,纸基壁纸,木纤维壁纸。Pvc墙纸价格比较低廉,但是不环保,不健康。织物壁纸:这种壁纸无毒无塑料味、耐磨,不产生静电,也不褪色,吸音效果好。室内采用这种壁纸显得高雅、柔和、舒适,但价格相对较贵。相对来说这种壁纸不便清洁。装饰效果好,由于壁纸拥有数百种颜色、花纹和图案,只要按照设计者的意图施工,就可以达到各种各样的装饰效果。纸基壁纸:具有较好的装饰效果外,还具有吸音、隔热、防霉、防菌、耐水等多功能。纸基涂塑壁纸具有较好的耐摩擦性和防污染性,便于保持墙面干净,施工方便。木纤维壁纸:此种壁纸由木浆聚酯合成,采用亚光型光泽,柔和自然,易与家具搭配,花色品种繁多;对人体没有任何化学侵害,透气性能良好,墙面的湿气、潮气都可透过壁纸;长期使用,不会有憋气的感觉,也就是我们常说的“会呼吸的壁纸”,是健康家居的首选。它经久耐用,可用水擦洗,更可以用刷子清洗。经过比较觉得木纤维壁纸较适合家庭装修。
橱柜:整体橱柜的价格和要选择的面板,柜体版,面板材质有很大关系。面板种类有人造板,石英石,大理石,不锈钢等材质。石英石面板其色调美观、华贵、硬度高、集天然和人造石之优点于一身,具有刮不花、烫不坏、污不染、用不旧、无毒、无辐射等特点,比其它装修面材应用在厨房更好。经过比较得出石英石的面板较适合家庭装修使用。
灯具:价格幅度很大,可根据装修喜好选择,但是应选LED灯,节能环保。
经过一周短暂的实习,虽然时间很短,但是获得了很多知识。我近距离的观察了整个房屋的建造过程,学到了不少很适用的具体的施工知识,这些知识往往是我在学校很少接触,很少注意的,但又是十分重要基础的知识。实践是课本上知识的运用,我们要学以致用,理论联合实际。