第一篇:建筑工程技术专业毕业论文
中国地质大学(北京)
现代远程教育
专 科 实习报 告
题
目
混凝土裂缝的预防与处理
学生姓名
赵
明
批
次
1503
专
业
建筑工程技
学
号
201502010658
学习中心 云南爱因森科技专修学院奥鹏学习中心【39】
2017年 4 月
中文摘要与关键词 ···························································································· 3
一、前言 ········································································································· 3
二、凝土工程中常见裂缝及预防 ········································································· 4 1.干缩裂缝及预防 ······································································· 4
2.塑性收缩裂缝及预防 ································································· 4 3.沉陷裂缝及预防 ······································································· 5 4.温度裂缝及预防 ······································································· 5 5.化学反应引起的裂缝及预防 ························································ 6
三、裂缝处理 ·································································································· 7
1、表面修补法 ············································································ 7
2、灌浆、嵌逢封堵法 ··································································· 7
3、结构加固法 ············································································ 7
4、混凝土置换法 ········································································· 7
5、电化学防护法 ········································································· 7
6、仿生自愈合法 ········································································· 8
四、结 论 ········································································································ 8 参考文献 ···················································································· 8
混凝土裂缝的预防与处理
摘要 混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。
关键词 混凝土
一、前言 裂缝 预防 处理
混凝土是一种由砂石骨料、水泥、水及其他外加材料混合而形成的非均质脆性材料。由于混凝土施工和本身变形、约束等一系列问题,硬化成型的混凝土中存在着众多的微孔隙、气穴和微裂缝,正是由于这些初始缺陷的存在才使混凝土呈现出一些非均质的特性。微裂缝通常是一种无害裂缝,对混凝土的承重、防渗及其他一些使用功能不产生危害。但是在混凝土受到荷载、温差等作用之后,微裂缝就会不断的扩展和连通,最终形成我们肉眼可见的宏观裂缝,也就是混凝土工程中常说的裂缝。
混凝土建筑和构件通常都是带缝工作的,由于裂缝的存在和发展通常会使内部的钢筋等材料产生腐蚀,降低钢筋混凝土材料的承载能力、耐久性及抗渗能力,影响建筑物的外观、使用寿命,严重者将会威胁到人们的生命和财产安全。很多工程的失事都是由于裂缝的不稳定发展所致。近代科学研究和大量的混凝土工程实践证明,在混凝土工程中裂缝问题是不可避免的,在一定的范围内也是可以接受的,只是要采取有效的措施将其危害程度控制在一定的范围之内。钢筋混凝土规范也明确规定[1]:有些结构在所处的不同条件下,允许存在一定宽度的裂缝。但在施工中应尽量采取有效措施控制裂缝产生,使结构尽可能不出现裂缝或尽量减少裂缝的数量和宽度,尤其要尽量避免有害裂缝的出现,从而确保工程质量。
混凝土裂缝产生的原因很多,有变形引起的裂缝:如温度变化、收缩、膨胀、不均匀沉陷等原因引起的裂缝;有外载作用引起的裂缝;有养护环境不当和化学作用引起的裂缝等等。在实际工程中要区别对待,根据实际情况解决问题。
二、凝土工程中常见裂缝及预防
1.干缩裂缝及预防
干缩裂缝多出现在混凝土养护结束后的一段时间或是混凝土浇筑完毕后的一周左右。水泥浆中水分的蒸发会产生干缩,且这种收缩是不可逆的。干缩裂缝的产生主要是由于混凝土内外水分蒸发程度不同而导致变形不同的结果:混凝土受外部条件的影响,表面水分损失过快,变形较大,内部湿度变化较小变形较小,较大的表面干缩变形受到混凝土内部约束,产生较大拉应力而产生裂缝。相对湿度越低,水泥浆体干缩越大,干缩裂缝越易产生。干缩裂缝多为表面性的平行线状或网状浅细裂缝,宽度多在0.05~0.2mm之间,大体积混凝土中平面部位多见,较薄的梁板中多沿其短向分布。干缩裂缝通常会影响混凝土的抗渗性,引起钢筋的锈蚀影响混凝土的耐久性,在水压力的作用下会产生水力劈裂影响混凝土的承载力等等。混凝土干缩主要和混凝土的水灰比、水泥的成分、水泥的用量、集料的性质和用量、外加剂的用量等有关。
主要预防措施:一是选用收缩量较小的水泥,一般采用中低热水泥和粉煤灰水泥,降低水泥的用量。二是混凝土的干缩受水灰比的影响较大,水灰比越大,干缩越大,因此在混凝土配合比设计中应尽量控制好水灰比的选用,同时掺加合适的减水剂。三是严格控制混凝土搅拌和施工中的配合比,混凝土的用水量绝对不能大于配合比设计所给定的用水量。四是加强混凝土的早期养护,并适当延长混凝土的养护时间。冬季施工时要适当延长混凝土保温覆盖时间,并涂刷养护剂养护。五是在混凝土结构中设置合适的收缩缝。
2.塑性收缩裂缝及预防
塑性收缩是指混凝土在凝结之前,表面因失水较快而产生的收缩。塑性收缩裂缝一般在干热或大风天气出现,裂缝多呈中间宽、两端细且长短不一,互不连贯状态。较短的裂缝一般长20~30cm,较长的裂缝可达2~3m,宽1~5mm。其产生的主要原因为:混凝土在终凝前几乎没有强度或强度很小,或者混凝土刚刚终凝而强度很小时,受高温或较大风力的影响,混凝土表面失水过快,造成毛细管中产生较大的负压而使混凝土体积急剧收缩,而此时混凝土的强度又无法抵抗其本身收缩,因此产生龟裂。影响混凝土塑性收缩开裂的主要因素有水灰比、混凝土的凝结时间、环境温度、风速、相对湿度等等。
主要预防措施:一是选用干缩值较小早期强度较高的硅酸盐或普通硅酸盐水泥。二是严格控制水灰比,掺加高效减水剂来增加混凝土的坍落度和和易性,减少水泥及水的用量。三是浇筑混凝土之前,将基层和模板浇水均匀湿透。四是及时覆盖塑料薄膜或者潮湿的
草垫、麻片等,保持混凝土终凝前表面湿润,或者在混凝土表面喷洒养护剂等进行养护。五是在高温和大风天气要设置遮阳和挡风设施,及时养护。
3.沉陷裂缝及预防
沉陷裂缝的产生是由于结构地基土质不匀、松软,或回填土不实或浸水而造成不均匀沉降所致;或者因为模板刚度不足,模板支撑间距过大或支撑底部松动等导致,特别是在冬季,模板支撑在冻土上,冻土化冻后产生不均匀沉降,致使混凝土结构产生裂缝。此类裂缝多为深进或贯穿性裂缝,其走向与沉陷情况有关,一般沿与地面垂直或呈30°~45°角方向发展,较大的沉陷裂缝,往往有一定的错位,裂缝宽度往往与沉降量成正比关系。裂缝宽度受温度变化的影响较小。地基变形稳定之后,沉陷裂缝也基本趋于稳定。
主要预防措施:一是对松软土、填土地基在上部结构施工前应进行必要的夯实和加固。二是保证模板有足够的强度和刚度,且支撑牢固,并使地基受力均匀。三是防止混凝土浇灌过程中地基被水浸泡。四是模板拆除的时间不能太早,且要注意拆模的先后次序。五是在冻土上搭设模板时要注意采取一定的预防措施。
4.温度裂缝及预防
温度裂缝多发生在大体积混凝土表面或温差变化较大地区的混凝土结构中。混凝土浇筑后,在硬化过程中,水泥水化产生大量的水化热,(当水泥用量在350~550 kg/m3,每立方米混凝土将释放出17500~27500kJ的热量,从而使混凝土内部温度升达70℃左右甚至更高)。由于混凝土的体积较大,大量的水化热聚积在混凝土内部而不易散发,导致内部温度急剧上升,而混凝土表面散热较快,这样就形成内外的较大温差,较大的温差造成内部与外部热胀冷缩的程度不同,使混凝土表面产生一定的拉应力(实践证明当混凝土本身温差达到25℃~26℃时,混凝土内便会产生大致在10MPa左右的拉应力)。当拉应力超过混凝土的抗拉强度极限时,混凝土表面就会产生裂缝,这种裂缝多发生在混凝土施工中后期。在混凝土的施工中当温差变化较大,或者是混凝土受到寒潮的袭击等,会导致混凝土表面温度急剧下降,而产生收缩,表面收缩的混凝土受内部混凝土的约束,将产生很大的拉应力而产生裂缝,这种裂缝通常只在混凝土表面较浅的范围内产生。
温度裂缝的走向通常无一定规律,大面积结构裂缝常纵横交错;梁板类长度尺寸较大的结构,裂缝多平行于短边;深入和贯穿性的温度裂缝一般与短边方向平行或接近平行,裂缝沿着长边分段出现,中间较密。裂缝宽度大小不一,受温度变化影响较为明显,冬季较宽,夏季较窄。高温膨胀引起的混凝土温度裂缝是通常中间粗两端细,而冷缩裂缝的粗细变化不太明显。此种裂缝的出现会引起钢筋的锈蚀,混凝土的碳化,降低混凝土的抗冻融、抗
疲劳及抗渗能力等。
主要预防措施:一是尽量选用低热或中热水泥,如矿渣水泥、粉煤灰水泥等。二是减少水泥用量,将水泥用量尽量控制在450kg/m3以下。三是降低水灰比,一般混凝土的水灰比控制在0.6以下。四是改善骨料级配,掺加粉煤灰或高效减水剂等来减少水泥用量,降低水化热。五是改善混凝土的搅拌加工工艺,在传统的三冷技术的基础上采用二次风冷新工艺,降低混凝土的浇筑温度。六是在混凝土中掺加一定量的具有减水、增塑、缓凝等作用的外加剂,改善混凝土拌合物的流动性、保水性,降低水化热,推迟热峰的出现时间。七是高温季节浇筑时可以采用搭设遮阳板等辅助措施控制混凝土的温升,降低浇筑混凝土的温度。八是大体积混凝土的温度应力与结构尺寸相关,混凝土结构尺寸越大,温度应力越大,因此要合理安排施工工序,分层、分块浇筑,以利于散热,减小约束。九是在大体积混凝土内部设置冷却管道,通冷水或者冷气冷却,减小混凝土的内外温差。十是加强混凝土温度的监控,及时采取冷却、保护措施。十一是预留温度收缩缝。十二是减小约束,浇筑混凝土前宜在基岩和老混凝土上铺设5mm左右的砂垫层或使用沥青等材料涂刷。十三是加强混凝土养护,混凝土浇筑后,及时用湿润的草帘、麻片等覆盖,并注意洒水养护,适当延长养护时间,保证混凝土表面缓慢冷却。在寒冷季节,混凝土表面应设置保温措施,以防止寒潮袭击。十四是混凝土中配置少量的钢筋或者掺入纤维材料将混凝土的温度裂缝控制在一定的范围之内。
5.化学反应引起的裂缝及预防
碱骨料反应裂缝和钢筋锈蚀引起的裂缝是钢筋混凝土结构中最常见的由于化学反应而引起的裂缝。
混凝土拌和后会产生一些碱性离子,这些离子与某些活性骨料产生化学反应并吸收周围环境中的水而体积增大,造成混凝土酥松、膨胀开裂。这种裂缝一般出现中混凝土结构使用期间,一旦出现很难补救,因此应在施工中采取有效措施进行预防。主要的预防措施:一是选用碱活性小的砂石骨料。二是选用低碱水泥和低碱或无碱的外加剂。三是选用合适的掺和料抑制碱骨料反应。
由于混凝土浇筑、振捣不良或者是钢筋保护层较薄,有害物质进入混凝土使钢筋产生锈蚀,锈蚀的钢筋体积膨胀,导致混凝土胀裂,此种类型的裂缝多为纵向裂缝,沿钢筋的位置出现。通常的预防措施有:一是保证钢筋保护层的厚度。二是混凝土级配要良好。三是混凝土浇注要振捣密实。四是钢筋表层涂刷防腐涂料。
三、裂缝处理
裂缝的出现不但会影响结构的整体性和刚度,还会引起钢筋的锈蚀、加速混凝土的碳化、降低混凝土的耐久性和抗疲劳、抗渗能力。因此根据裂缝的性质和具体情况我们要区别对待、及时处理,以保证建筑物的安全使用。
混凝土裂缝的修补措施主要有以下一些方法:表面修补法,灌浆、嵌逢封堵法,结构加固法,混凝土置换法,电化学防护法以及仿生自愈合法。
1、表面修补法
表面修补法是一种简单、常见的修补方法,它主要适用于稳定和对结构承载能力没有影响的表面裂缝以及深进裂缝的处理。通常的处理措施是在裂缝的表面涂抹水泥浆、环氧胶泥或在混凝土表面涂刷油漆、沥青等防腐材料,在防护的同时为了防止混凝土受各种作用的影响继续开裂,通常可以采用在裂缝的表面粘贴玻璃纤维布等措施。
2、灌浆、嵌逢封堵法
灌浆法主要适用于对结构整体性有影响或有防渗要求的混凝土裂缝的修补,它是利用压力设备将胶结材料压入混凝土的裂缝中,胶结材料硬化后与混凝土形成一个整体,从而起到封堵加固的目的。常用的胶结材料有水泥浆、环氧树脂、甲基丙烯酸酯、聚氨酯等化学材料。
嵌缝法是裂缝封堵中最常用的一种方法,它通常是沿裂缝凿槽,在槽中嵌填塑性或刚性止水材料,以达到封闭裂缝的目的。常用的塑性材料有聚氯乙烯胶泥、塑料油膏、丁基橡胶等等;常用的刚性止水材料为聚合物水泥砂浆。
3、结构加固法
当裂缝影响到混凝土结构的性能时,就要考虑采取加固法对混凝土结构进行处理。结构加固中常用的主要有以下几种方法:加大混凝土结构的截面面积,在构件的角部外包型钢、采用预应力法加固、粘贴钢板加固、增设支点加固以及喷射混凝土补强加固。
4、混凝土置换法
混凝土置换法是处理严重损坏混凝土的一种有效方法,此方法是先将损坏的混凝土剔除,然后再置换入新的混凝土或其他材料。常用的置换材料有:普通混凝土或水泥砂浆、聚合物或改性聚合物混凝土或砂浆。
5、电化学防护法
电化学防腐是利用施加电场在介质中的电化学作用,改变混凝土或钢筋混凝土所
处的环境状态,钝化钢筋,以达到防腐的目的。阴极防护法、氯盐提取法、碱性复原法是化学防护法中常用而有效的三种方法。这种方法的优点是防护方法受环境因素的影响较小,适用钢筋、混凝土的长期防腐,既可用于已裂结构也可用于新建结构。
6、仿生自愈合法
仿生自愈合法是一种新的裂缝处理方法,它模仿生物组织对受创伤部位自动分泌某种物质,而使创伤部位得到愈合的机能,在混凝土的传统组分中加入某些特殊组分(如含粘结剂的液芯纤维或胶囊),在混凝土内部形成智能型仿生自愈合神经网络系统,当混凝土出现裂缝时分泌出部分液芯纤维可使裂缝重新愈合
四、结 论
裂缝是混凝土结构中普遍存在的一种现象,它的出现不仅会降低建筑物的抗渗能力,影响建筑物的使用功能,而且会引起钢筋的锈蚀,混凝土的碳化,降低材料的耐久性,影响建筑物的承载能力,因此要对混凝土裂缝进行认真研究、区别对待,采用合理的方法进行处理,并在施工中采取各种有效的预防措施来预防裂缝的出现和发展,保证建筑物和构件安全、稳定地工作。
参考文献
1、王铁梦
工程结构裂缝控制的综合方法.施工技术.2000(5).5-9
2、赵志缙
高层建筑结构工程施工
中国建筑工业出版社2005
3、何星华
建筑工程裂缝预防指南
中国建筑工业出版社2005
4、《混凝土结构工程施工质量验收规范》GB50204-2002(2011版)
5、《混凝土结构工程施工质量验收规程》DBJ01-82-2005 6《预防混凝土结构工程碱集料反应规程》DBJ01-95-2005
第二篇:建筑工程技术专业毕业论文题目
建筑工程技术专业 毕业实习报告参考题目
一、论文参考题目
1、软土地基上基础的处理措施
2、拟建建筑物地质差异较大时的地基处理措施
3、结构设计中梁柱的交接处理方法
4、结构设计中基础梁的设计处理方法
5、砌体结构房屋产生裂缝的处理措施
6、重力式挡土墙安全问题的研究
7、防止高层建筑基础不均匀沉降的措施
8、工程项目施工的组织研究
9、软弱地基的处理方法
10、地形地貌对建筑体型和层高的影响研究
11、建筑物三缝合一的处理方法研究
12、解决屋面渗漏问题的方法
13、论建筑与人文化的协调统一
14、论建筑设计与结构设计的协调统一
15、底层商场的设计处理方法
16、电梯轿箱基础与框架独立柱基的设计处理方法研究
17、深基础支护结构的设计与施工方法
18、框架结构中楼梯与框架梁柱的连接方法研究
19、提高普通建筑物的保温隔热措施
20、保证工程预算准确性的措施
21、保证建筑设计中的防火与疏散要求的方法与措施
第三篇:建筑工程技术毕业论文
第一章 1.1 前言 实习概况
三年的大学时光转瞬即逝,一年的实习期感触颇深。实习的过程中是需要与理论知识相结合的,特别是对建筑这种实践性特别强的一门学科更要注重实践与理论并重的培养。在这次实习中,能够真正的将所学知识与工地中的实际操作相融合,并且虚心学习新的知识,这对我以后参加工作打好了基础,并且也使自己的技能有了一个很好的提升。1.2实习单位介绍
单位名称:曲阜恒顺房地产开发有限公司
实习岗位:施工员
项目部组成:项目经理、项目副经理、项目技术负责人、预算员,施工员,材料员,安全员,质检员,资料员。1.3岗位介绍
1.施工员是在技术主管的领导下开展各项技术工作。
2.配合主管工程师编写每月施工进度质量安全的月报表,向主管工程师审报所管领域的资金预算和具体支付,参与开工前的有关工程与政府部门、设计单位与施工单位的联系、协调。
3.负责初审施工单位报来的施工组织设计,施工过程中配合监理全面负责有关工程的施工检查验收,直到竣工验收合格交付使用。
4.掌握熟悉施工图纸、施工规范和质量检查验收评定标准,负责工程进度,安全消防等文明施工的检查监督。
5.负责现场协调,设计、土建、安装在进度与质量关系上的矛盾。6.参加所管理工程范围内的工程、材料、设备的招投标及合同的准备工作,及时对进场材料、设备的供货质量进行监督、检查、认可。
7.核签有关工程进度、质量、工程量的资料,并报总工程师及部门经理,审核整理工程竣工资料,并报资料员存档备案。
8.及时与现场监理发现不按图纸施工、不按规范施工的行为,若现场纠正无效,配合监理发停工整顿单,并报总工程师。
9.对现场安全保障设施、措施及施工中人员、机械设备的安全状况予以监督,并及时提出整改。
1.4 实习时间
2015年8月1日——2016年4月
第二章 实习过程及内容 2.1 图纸
施工图纸是表示工程项目总体布局,建筑物的外部形状、内部布置、结构构造、内外装修、材料作法以及设备、施工等要求的图样。一套完整的施工图一般包括建筑施工图、结构施工图、给排水、采暖通风施工图及电气施工图等专业图纸。施工人员通过熟悉图纸,理解设计意图,并按图施工。2.2 施工放线
在工程开工前以及工程在施工过程中,都要确定建筑物和墙柱梁的精确位置。位置的确定需要用到水准仪和全站仪等仪器的辅助。2.2.1 施工放线技术及工具
1、施工放线技术
施工放线的第一步是复核规划定点位置。一般施工总平面图上绘出的坐标,由技术人员到现场定位。但是规划定位是根据理论值进行的。这与现场建筑物的实际位置可能会有差别。如果存在这样的差别时,一定要复核、纠正。
第二步是测定建筑物轴线、标高。常规做法是打龙门桩、钉铁钉、标记红三角标高。挖土方洒灰线,捣制垫层后弹墨线。
基础工程完成后,就可以向上引线。以后再接各分层工序,依次往上弹线。每层标高都设置一个。
在施工放线过程中,需要涉及到各种线。有总控制线、墙边线,20公分控制线、五零线和一米线等。总控制线也叫辅助线,是墙边线和20公分控制线的测量依据。墙边线是控制墙的厚度和平整度的线。20公分控制线是离墙边线20公分处的线,它的用途也很多,例如:木工制模、浇筑导墙、砌砖墙等都根据此控制线。五零线是建筑物标高控制基点,也是建筑楼地面工程标高控制线。一米线是室内装修,室外安装的重要标准线。
2、所需工具 1.水准仪
水准仪是水准测量所使用的仪器,它主要由望远镜、水准器及基座三部分组成。望远镜是用来精确瞄准远处目标并对水准尺进行读数的。
2.光学经纬仪
经纬仪是用于测量水平角的仪器,必须具备一个能置于水平位置的刻度盘,且水平度盘的中心位于水平角顶点的铅垂线上。为了能瞄准高低远近不同的目标,仪器上的望远镜不仅可以在水平位置上转动,而且还可以在竖直面内转动。3.激光垂直仪
激光垂直仪是用于垂直测量的仪器。4.红外线水准仪
红外线水准仪主要是用于水平面测量的仪器。5.墨斗
在弹线的时候需要用到,是测量最常见的器具之一。6.5米卷尺、10米卷尺、30米三角卷尺
测量建筑物长度的工具,根据长度用不同的尺。7.线锤
在弹线的过程中遇到不在同一直线的线或遇到障碍物时需要吊线锤。8.石笔、红铅笔、标记笔
在测量时经常用到的做标记用的笔,石笔是在二次结构放线的时候用的,例如:导墙、砌砖、门窗等测量。红铅笔用处挺多,一般用于五零线标记,和红油漆配合使用。
2.2.2 施工放线工作要求
现场测量是一项专业性很强的工作,它要求实施操作的人员能够熟练的现场测绘技术。
在工作开始之前,需做好以下准备:认真阅读图纸,熟悉和掌握建筑物的基础层高,标高,柱、梁、板的标高,轴线定位等方面的尺寸。做好所用仪器的校准等准备工作以及相关人员的组织协调。在测量放线中,应做到:测量放线必须正确,不允许因测量问题造成的质量事故。在标高、放线定位的测量中,要多重复多记,避免误差和错误。配合施工员做好对垂直的建筑物的垂直度测量以及水平建筑物体的水平垂直的测量,复检复测的工作。对使用的测量仪器,要经常检查,以保证其使用精确度。2.3 钢筋工程
钢筋工程作为房屋建筑混凝土结构工程中的重要工程之一,得到了越来越广泛的运用。由于钢筋工程的完成效果是由设计、选材、施工直至验收使用等诸多环节的因素综合决定的,工程本身又具有隐蔽性。因此,在工程建设的始终都必须给予特殊的重视。同时钢筋在工程预算中也占着很大的比重,而且钢筋能够很好的增强建筑物的强度,所以在板墙柱梁梯等部位都要用到钢筋。2.3.1 施工工艺
1、钢筋制作 钢筋加工制作时,要将钢筋加工表与设计图复核,检查下料表是否有错误和遗漏,对每种钢筋要按下料表检查是否达到要求,经过这两道检查后,再按下料表放出实样,试制合格后方可成批制作,加工好的钢筋要挂牌堆放整齐有序。施工中如需要钢筋代换时,必须充分了解设计意图和代换材料性能,严格遵守现行钢筋砼设计规范的各种规定,并不得以等面积的高强度钢筋代换低强度的钢筋。凡重要部位的钢筋代换,须征得甲方、设计单位同意,并有书面通知时方可代换。
1)钢筋接头及搭接长度。受力钢筋的接头宜设置在受力较小处,在同一根钢筋上
宜少设接头;搭接接头末端至钢筋弯起点的距离不应小于钢筋直径的10倍。对于梁、板类构件钢筋的接头,上铁应在跨中1/3范围内,下铁应在支座1/3范围内。钢筋绑扎搭接接头连接区段的长度为1.3倍搭接长度;位于同一连接区段内的受拉钢筋搭接接头的百分率:对梁、板类及墙类构件,不宜大于25%;对于柱类构件,不宜大于50%;当工程中确有必要增大受拉钢筋搭接接头面积百分率时,对梁类构件,不应大于50%。钢筋机械连接接头的连接区段为35d(d 为纵向受力钢筋较大直径),在此区段内,纵向钢筋的接头面积百分率不宜大于50%。所有后浇带钢筋直接通过,不断开。
2)钢筋放置顺序 单向板下网钢筋一般短向受力筋在最下层,上网钢筋负弯矩筋在最上部。主、次梁钢筋交叉处,次梁钢筋搁置在主梁钢筋的上部。独立基础底板钢筋一般长向受力筋下网在下部,上网在上部;短向受力筋下网在上部,上网在下部。
2、钢筋绑扎
钢筋绑扎前先认真熟悉图纸,检查配料表与图纸、设计是否有出入,仔细检查成品尺寸、心头是否与下料表相符。核对无误后方可进行绑扎。1)墙
①墙的钢筋网绑扎同基础。钢筋有90°弯钩时,弯钩应朝向混凝土内。②采用双层钢筋网时,在两层钢筋之间,应设置撑铁(钩)以固定钢筋的间距。
③墙筋绑扎时应吊线控制垂直度,并严格控制主筋间距。剪力墙上下两边三道水平处应满扎,其余可梅花点绑扎。
④为了保证钢筋位置的正确,竖向受力筋外绑一道水平筋或箍筋,并将其与竖筋点焊,以固定墙、柱筋的位置,在点焊固定时要用线锤校正。⑤外墙浇筑后严禁开洞,所有洞口预埋件及埋管均应预留,洞边加筋详见施工图。墙、柱内预留钢筋做防雷接地引线,应焊成通路。其位置、数量及做法详见安装施工图,焊接工作应选派合格的焊工进行,不得损伤结构钢筋,水电安装的预埋,土建必须配合,不能错埋和漏埋。
2)梁与板
①纵向受力钢筋出现双层或多层排列时,两排钢筋之间应垫以直径15mm的短钢筋,如纵向钢筋直径大于25mm时,短钢筋直径规格与纵向钢筋相同规格。
②箍筋的接头应交错设置,并与两根架立筋绑扎,悬臂挑梁则箍筋接头在下,其余做法与柱相同。梁主筋外角处与箍筋应满扎,其余可梅花点绑扎。③板的钢筋网绑扎与基础相同,双向板钢筋交叉点应满绑。应注意板上部的负钢筋(面加筋)要防止被踩下;特别是雨蓬、挑檐、阳台等悬臂板,要严格控制负筋位置及高度。
④板、次梁与主梁交叉处,板的钢筋在上,次梁的钢筋在中层,主梁的钢筋在下,当有圈梁或垫梁时,主梁钢筋在上。
⑤楼板钢筋的弯起点,如加工厂(场)在加工没有起弯时,设计图纸又无特殊注明 的,可按以下规定弯起钢筋,板的边跨支座按跨度1/10L为弯起点。板的中跨及连续多跨可按支座中线1/6L为弯起点。(L—板的中一中跨度)。
⑥框架梁节点处钢筋穿插十分稠密时,应注意梁顶面主筋间的净间距要有留有30mm,以利灌筑混凝土之需要。2.3.2 质量标准
1、保证项目
1)钢筋的材质、规格及焊条类型应符合钢筋工程的设计施工规范,有材质及产品合格证书和物理性能检验,对于进口钢材需增加化学性能检定,检验合格后方能使用。
2)钢筋的规格、形状、尺寸、数量、间距、锚固长度、接头位置、保护层厚度必须符合设计要求和施工规范的规定。
3)焊工必须持相应等级焊工证才允许上岗操作。
4)在焊接前应预先用相同的材料、焊接条件及参数,制作二个抗拉试件,其试验结果大于该类别钢筋的抗拉强度时,才允许正式施焊,此时不可再从成品抽样取试件。
2、基本项目
1)钢筋、骨架绑扎,缺扣、松扣不超过应绑扎数据的10%,且不应集中。2)钢筋弯钩的朝向正确,绑扎接头符合施工规范的规定,搭接长度不小于规定值。3)所有焊接接头必须进行外观检验,其要求是:焊缝表面平顺,没有较明显的咬边、凹陷、焊瘤、夹渣及气孔,严禁有裂纹出现。2.3.3 成品保护 1.成型钢筋、钢筋网片应按指定地点分类堆放,用垫木垫放整齐,防止压弯变形。2.运输过程注意轻装轻卸,不得随意抛掷。
3.柱钢筋必须在操作平台上绑扎操作,专用通道上下,严禁脚踩钢筋和施工。4.柱封模时,严禁施工人员撬、踩、松绑等方式破坏钢筋。
5.板、梁钢筋施工时,必须设置专用通道,严禁任何人直接在钢筋上随意行走,重点保护负筋部位。
6.钢筋工序完毕后,办理工序间的交接清单,做到责任明确。
7.钢筋在完全隐蔽以前,钢筋工实行全天值班,随时调整和处理现场所出现的问题。
2.3.4 安全措施 1.搬运钢筋时,要注意前后方向有无碰撞危险或被钩挂料物,特别是避免碰挂周围和上下方向的电线,人工搬运钢筋,上肩卸料要小心,注意安全。
2.起吊和安装钢筋时,应和附近高压线路或电源保持一定安全距离,雷雨等恶劣天气严禁施工。
3.运输钢筋的工具是吊索必须在使用前检查安全、可靠性。起吊时,捆绑牢固,专
人指挥,工作本院内不得有人走动,吊装到位时,扶钢筋人员注意钢筋摆动惯性。4.高空安装钢筋应选好位置站稳,系好安全带。
5.工作平台满足施工所需的工作面,并有护栏等安全设施。
6.施工人员精神集中,班前进行安全讲话,检查每一施工人员,对不符合安全上岗操作人员严禁上岗施工。7.作好每天的安全记录。2.3.5 施工注意事项
1.绑扎时宜将多根钢筋端部对齐,防止绑扎时钢筋偏离规定位置及骨架扭曲变形。
2.保护层砂浆垫块厚度应准确,垫块间距应适宜,否则导致板面出现裂缝,梁底,柱侧露筋。
3.钢筋骨架吊装入模时,应先根据骨架外形确定好吊点的数量及位置。并合理地选用吊索的形式,以确保吊装时平稳。骨架各钢筋交叉点要绑扎牢固,必要时采取焊接。
4.钢筋骨架绑扎完毕后,会出现斜向一方,绑扎时铁丝应绑成八字形,且依据所绑钢筋的规格合理地选择绑丝的长度,左右绑扎。发现箍筋遗漏间距不对要及时调整好。
5.柱子箍筋接头无错开放置,绑扎前、后需检查,若有错误及时纠正。6.钢筋未完全隐蔽前,对已绑扎完毕的钢架,必须有专人或专组进行值班检查,对钢筋位置发生偏离、钢筋形状被破坏等都要及时调整。
7.对于钢筋接头在绑扎之前检查接头数量是否超过规定,如有,则应作调整后才可绑扎成型。
2.3.6 质量预防控制措施
1.防止墙体保护层偏差,钢筋移位等,加绑竖向梯子筋,间距1.5~3m米。墙体水平方向上加水平固定筋,暗柱上加用箍筋套子。2.梁、柱加放定型卡具,垫块。
3.底板钢筋应弹间距线,纵横钢筋应平直,间距应均匀,马凳高度尺寸应准确,码放合理,间距不大于1米。
4.钢筋应在浇筑混凝土前,派专人负责修理钢筋,并在顶板上铺设脚手板,以防止踩踏钢筋。
5.标高垂直偏差控制:向工人进行技术交底,并做现场指导,对十字节点,转角处,丁字节点重点检查,用线调整钢筋的垂直度。对外墙,内墙窗口尺寸,洞口尺寸,统一用线拉直验收,并做固定标高杆,专业工长应跟踪检查。
6.后浇带部位防污染、腐蚀:底板后浇带部位的钢筋,在砼浇筑完毕后,在钢筋表面涂刷一层素水泥浆予以保护,然后覆盖一层竹胶板防止杂物落入后浇带内难以清理。同时,为防止后浇带处积水,配置一台潜水泵随时抽水。2.4 模板工程
2.4.1 模板制作设计原则 1.要保证构件的形状尺寸及相互位置的正确
2.要使模板具有足够的强度、刚度和稳定性,能够承受新浇砼的重量和侧压力以及各种施工荷载
3.力求结构简单,装拆方便,不妨碍钢筋绑扎,保证砼浇注时不漏浆 4.支撑系统应配置水平支撑和剪刀撑,以保证稳定性 2.4.2施工准备
1.组合钢模板安装前应向施工班组进行技术交底。有关施工及操作人员应熟悉施工图及模板工程的施工设计。
2.施工现场应有可靠的能满足模板安装和检查需用的测量控制点。
3.现场使用的模板及配件应按规格和数量逐项清点和检查,未经修复的部件不得使用。
4.采用预组装模板施工时,模板的预组装应在组装平台或经平整处理过的场地上进行。组装完毕后应予编号,并应按组装质量标准逐块检验后进行试吊,试吊完毕后应进行复查,并再检查配件的数量、位置和紧固情况。5.经检查合格的组装模板,应按照安装程序进行堆放或装车。平行叠放时应稳当,避免碰撞,每层之间应加垫木,模板与垫木均应上下对齐,底层模板应垫离地面不小于10cm。立放时,必须采取措施,防止倾倒并保证稳定,平装运输时,应捆紧,防止摇晃摩擦。
6.钢模板安装前,应涂刷脱模剂,表面需作处理的工程,严禁在模板上涂刷废机油。
2.4.3 模板的拆除
1.模板拆除前必须申请办理拆模手续,待混凝土强度报告出来后,混凝土达到拆模强度时模板方可拆除。
2.模板拆除前要向操作班组进行安全技术交底,在作业范围设安全警戒线关县挂警示牌,拆除时派专人看守。
3.侧模应以能保证混凝土表面及棱角不受损坏时方可拆除,底模应按《混凝土结构工程施工及验收规范》的有关规定执行。
4.模板拆除的顺序和方法,遵循先支后拆,后支先拆;先拆非承重部位,后拆承重部位;自上而下的顺序。拆模时,严禁用大锤和撬棍硬砸硬撬。模板要随拆随运,严禁随意抛掷。不得留有未拆除的悬空模板。
5.拆模时,操作人员应站在安全处,以免发生事故,等该片模板全部拆除后,再将
模板、配件、支架等运出。6.拆下的模板、配件等严禁抛扔,要有人接应传递,也可用带钩的绳子往下吊运,以防止模板变形和损坏。
7.模板拆除扣,要运至指定地点,并做到及时清理、维修和涂刷好隔离剂,修整后的模板要按编码放整齐,以备待用。模板堆放高度不得超过1.50m。
8.拆除模板作业比较危险,防止落物伤人,应设置警戒线,有时显标志,并设专门监护人员。2.5 混凝土工程
2.5.1 混凝土浇筑注意事项
1.浇灌砼前必须先检查模板支撑的稳定情况,特别要注意检查用斜撑支撑的悬臂构件的模板的稳定情况。浇注砼过程中,要注意观察模板、支撑情况,发现异常,及时报告。2.水平运输通道旁预留洞口,电梯井口必须检查完善盖板、围护栏杆。高处临空搭设车道必须稳固,两侧设围护栏杆,推车或机动翻斗车倒砼时,应有档车措施,不得过猛或撒把。.塔吊料斗浇捣砼时,指挥、扶斗人员与塔吊司机应密切配合,放下料斗时,作业人员应避让、站立稳当,严禁空中手斜拉吊物和吊钩。.振捣器电源线必须完好无损,供电电缆不得有接头,砼振捣器作业转移时,电动机的导线应保持有足够的长度和松度。严禁有电源线拖拉振捣器。作业人员必须穿绝缘胶鞋,戴绝缘手套。.浇筑砼所使用的桶、槽必须固定牢固,使用串筒节间应连接牢靠,操作部位设防护栏杆,严禁站在桶槽帮上操作。
6.用泵输送砼时,输送管道接头必须紧密可靠不漏浆、安全阀完好,管道架子牢固,输送前,先试送,检修时必须卸压。.浇灌框架、梁、柱砼时,必须设操作平台,严禁站在模板或支撑上操作。8.浇筑圈梁、雨篷、阳台砼必须搭设脚手架,严禁站在墙体或模板帮上操作。9.浇筑拱形结构,应自两边拱脚对称地相向进行。浇筑储仓,下口应先行封闭,并搭设脚手架,以防人员坠落。
10.夜间浇筑时,必须有足够的照明设备。2.5.2 混凝土养护 1.一般规定
1)除非采用加速养护或另有规定外,混凝土的养护时间应视水泥的水化作用及达成适当强度之需求尽可能延长,且不得少于7天。
2)养护期间应保持模板潮湿。若于养护期间拆除模板,则拆模后应符合下列条件继续养护:养护期间其周围温度应维持13℃以上;混凝土暴露面周围应尽量避免空气之流动。
3)采用液膜养护时,所使用材料应与预备施作于混凝土表面之防水材料或其它材料兼容。2.水及覆盖物
除使用液膜养护剂外,可使用下列养护方法:
1)水平之混凝土表面应采用滞水法,使其在规定之养护期间内保持浸于水中。2)养护期间之最初24小时内,使用喷雾器于混凝土表面连续喷雾,应使水呈雾状,不可形成水流,亦不得直接以水雾加压于混凝土面。混凝土面不得形成水流或冲刷现象,以免造成剥损。
3)混凝土表面以覆盖材料如麻布、席、布、PVC布及细砂等完全覆盖。覆盖材料应直接铺盖于混凝土表面上,并随时保持湿润。
4)依上述规定,混凝土表面经喷洒水雾达18小时以上之后,应以完好无破损之覆盖材料完全盖住混凝土表面,并予以固定妥当。
5)养护期间不得损害覆盖材料、防水养护布或混凝土表面。3.液膜养护剂
1)液膜养护剂应在不影响混凝土表面外观及不适用湿治法之情况下经许可后方得使用。
2)混凝土表面若须接合新浇置之混凝土或涂装其它面层,如油漆、瓷砖、防潮层、不透水层或屋顶隔热层者,不得使用蜡、脂类或其它有害混凝土表面及强度之养护剂。预定使用化学封面剂之地板,不得使用养护剂。施工缝处亦不得使用养护剂。3)必要时养护剂可依制造厂商之建议加热使用。
4)如在养护期结束前养护膜发生破损,应立即以养护剂修补。5)涂敷厚度应依照制造厂商之产品说明书规定施作。
6)养护剂使用前应彻底搅拌,并于混合后1小时内涂敷使用。7)使用养护剂前混凝土表面应先修饰。
8)养护剂应涂敷两层。模板拆除及混凝土修饰工作经认可时立即涂敷第一层。9)若混凝土面干燥,应先以水予以全面湿润,并于水渍刚消失时立即涂敷养护剂。第一层养护剂凝固后即涂敷第二层。
10)养护剂涂敷完成后,应保护其不致受损至少10天。若有受损则应补行涂敷养护剂。11)若因使用养护剂而造成混凝土表面斑纹或斑点之现象,即应停止使用并改采其它养护方法,直到造成瑕疵之原因消失为止。4.加速养护
1)由承包商提出经工程司核可后可使用高压蒸气、常压蒸气、加热与湿治及其它加速达到至强度之养护方法。
2)若采用连续或分段加热法进行养护,应俟混凝土浇置完成初凝后方得开始加热。采用连续加热法时,温度升高速率不得超过20℃/h,采用分段加热法时,连续两段间之温度差不得超过20℃且每段之加热时间不得少于一小时,且最高温度不得大于70℃。加热养护完成后混凝土之冷却速率不得超过其加热速率。2.5.3 混凝土工程质量问题
1.蜂窝。产生原因:振捣不实、漏振、漏浆。
预防措施:按规定使用和移动振动器。中途停歇后再浇捣时,新旧接缝范围要小心振捣。模板安装前应清理模板表面及模板拼缝处的砂浆,才能使接缝严密,防止侧板吊脚。
露筋。产生原因:主筋保护层垫块不足或垫块脱落。
预防措施:在施工缝处继续浇筑混凝土前,混凝土施工缝表面应凿毛,清除水泥薄膜和松动石子,并用水冲洗干净。
3.麻面。产生原因:模板表面不光滑;模板湿润不够;漏涂隔离剂。预防措施:模板应平整光滑,安装前要把粘浆清除干净。并满涂隔离剂,浇捣前对模板要浇水润湿。
4.孔洞。产生原因:在钢筋较密的部位,混凝土被卡住或漏振。预防措施:对钢筋较密的部位(如粱柱接头)应分次下下料,缩小分层振捣的厚度;按照规程使用振动器。
5.缝隙及夹渣。产生原因:施工缝未按规定进行清理和浇浆,特别是柱头和梯板脚。
预防措施:浇注前对柱头,施工缝,梯板脚等部位重新检查,清理杂物,泥砂,木屑。
6.钢筋混凝土柱底部缺陷(烂脚)。产生原因:模板下。缝隙不严密,导致漏水泥浆;或建筑前没有先浇灌足够50mm厚以上水泥浆。
预防措施:模板缝隙宽度超过2.5mm应予以填塞严密。特别防止侧板吊脚。7.粱柱结点处(接头)断面尺寸偏差过大。产生原因:柱头模板刚度差,或把安装柱头模板放在楼层模板安装的最后阶段,缺乏质量控制和监督。
预防措施:安装粱板模板前,先安装柔柱接头模板,并检查其断面尺寸。垂直度。刚度,符合要求才允许接驳粱模板。8.混凝土表面不规则裂缝。产生原因:一般是淋水保养不及时湿润不足,水分蒸发过快或厚大构件温差收缩。
9.缺棱掉角。产生的原因:投料不准确,搅拌不均匀,出现局部强度低;或拆模板方法不当。
预防措施:指定专人监控投料,投料计准确;搅拌时间要足够;拆模板应在混凝土
强度能保证其表面及棱角不应在拆除模板而受损坏时方能拆除。拆除时对构件棱角应予以保护。
10.钢筋保护层垫块脆裂。产生的原因:垫块强度低于构件强度;沉置钢筋笼时冲力过大。
预防措施:垫块不得低于构件强度,并能抵御钢筋放置时的冲击力;当承托较大的粱钢筋时,垫块中应加钢筋或铁丝增强;垫块制作完毕应浇水养护。
第三章 实习总结及体会
这次实习丰富了我在这方面的知识,使我向更深的层次迈进,对我在今后的社会当中立足有一定的促进作用,但我也认识到,要想做好这方面的工作单靠这短短几天的实习是不行的,还需要我在平时的学习和工作中一点一滴的积累,不断丰富自己的经验才行。我面前的路还是很漫长的,需要不断的努力和奋斗才能真正地走好。
这次实习的真正目的就是在学到一些新知识时,也巩固了所学到的理论知识。以前对一些施工技术要点,只是粗略地知道其施工要点,而其具体的施工环节,具体的施工步骤如何,却了解的很少,但现在实习结束了,对我这段时间所看到的那些施工技术,它们的具体环节及详细步骤,我应该可以掌握了,这样就提高了自己的理论水平,也增强了自己的实际操作能力。通过实习,增强了自己对专业的热情,让自己更有兴趣将来能在建筑行业开创天地。但是通过这次实习,才觉得原来建筑行业是一个非常具有挑战性的职业,如果将来能在这个行业工作,对自己来说将是很大的挑战。为了以后能够胜任这项工作,现在就必须踏踏实实的学好每一门功课。因此给了自己压力,让自己不再觉得无事可作,让自己安心去学习,为将来工作打下坚实的基础。增强了自己的交际能力。建筑行业是一个涉及非常多的行业,你将会接触到各种各样的人。面对一个这样复杂的交际圈,你可以从他们身上学习到很多优秀的东西,去除自身的一些不好行为,同时也可以通过不同的接触对象,增强自己的交际能力,让自己在以后的生活中更加自信,更加坚强。实习结束了,我相信在以后的生活中我将体会到更多的东西,也相信自己在以后的工作中将会更好。我坚信通过这一段时间的实习,所获得的实践经验对我终身受益,在我毕业后的实际工作中将不断的得到验证,我会不断的理解和体会实习中所学到的知识,在未来的工作中我将把我所学到的理论知识和实践经验不断的应用到实际工作来,充分展示自我的个人价值和人生价值,同时为自己的理想和明天奋斗!
总之,经过这次实习之后,我从专业技能到为人处事,都真真切切的在现实之中得到了提高。为我今后的工作打下了坚实的基础。
第四篇:建筑工程技术专业
建筑工程技术专业
培养目标
本专业培养拥护党的基本路线,适应社会主义现代化建设需要,德、智、体、美等方面全面发展,掌握建筑工程技术专业必备基础理论知识,具有建筑工程技术专业相关领域工作岗位能力和专业能力,适应工程施工生产一线的技术,管理等职业岗位要求的高科技人才。
主要课程
建筑力学、建筑材料、建筑工程事故分析与处理、建设法规、施工资料管理、房屋建筑学、建筑工程质量验收、工程项目管理、建筑工程制图、建筑工程测量、建设工程监理概论等。
就业方向
毕业生主要在建筑行业就业,具备建筑装饰工程项目管理、建筑装饰工程概预算、建筑公共环境装饰设计、建筑装饰平面设计的能力,可在建筑行业从事装饰项目工程管理、装饰工程设计、装饰工程概预算等工作
第五篇:建筑工程技术专业
建筑工程技术专业
培养目标:培养掌握本专业必备的基础理论,具有本专业相关领域工作的岗位能力和专业技能,适应建筑施工一线的技术、管理等职业岗位要求的高技能人才,并具有满足个性发展的基本素质。
专业特色:该专业办学历史悠久,有大量毕业生在建设行业从事领导和技术工作。该专业的课程始终紧贴着行业各工作岗位的要求设置,毕业生的适应性广,就业面宽,从事该专业课程教学的教师,除具备扎实的专业理论知识外,绝大多数为活跃在建设行业生产一线的“双师型”教师,他们把实际工程经验融入课堂教学中,把建设行业的新技术、新工艺在第一时间传授给学生,为该专业学生毕业后零距离上岗打下了坚实的基础。
主干课程:建筑识图与房屋构造、建筑力学、建筑材料、建筑结构、建筑施工技术、建筑工程测量、地基与基础、高层建筑结构施工、施工组织与进度管理、工程质量测评与资料管理、建筑设备知识、施工项目成本管理、建筑工程定额与预算、工程质量与安全管理、施工项目管理概论等。
实践课程:住宅或商住楼设计、钢筋混凝土整体楼盖设计、网络图综合练习、建筑施工图识读、钢筋砼工程模板设计、工程预算综合练习、测量实习、工程工种操作实训、计算机操作(预算软件应用)、带型基础设计、计算机辅助设计、中级钢筋工和中级测量工职业技能训练、毕业实习等。
就业方向:毕业生面向建筑、市政、房地产开发、基建部门及其
他企事业单位,可从事项目施工、管理、工程预决算以及在监理单位从事监理等方面的工作。
工程监理专业
培养目标:培养具备工程监理基础理论和专业知识、具有建筑工程施工技术管理和工程项目监理能力,适应生产、建设、管理、服务第一线需要的高技能人才。
专业特色:工程监理专业师资力量雄厚,教师队伍中“双师型”、高学历教师比例高,教学团队成员有丰富的课堂教学经验和丰富的本专业实践经验;专业教学条件优越,面向社会办学、行业赞誉度高,就业面广。
主干课程:建筑力学、建材使用与保管、工程制图与房屋构造、建筑结构、地基与基础、建筑施工技术、建筑工程施工组织、建筑工程定额与预算、工程质量测评与资料管理、工程项目监理概论、工程项目质量与安全管理等。
实践课程:钢筋砼整体楼盖设计、网络图综合练习、钢筋砼工程施工设计、建筑工程造价管理综合练习、测量实习、工程工种操作实训、计算机辅助设计、中级钢筋工和中级测量工职业技能训练、毕业实习等。
就业方向:毕业生面向工程建设监理公司、房地产开发公司、建筑施工单位,可从事土建工程的监理、施工、概预算、招投标及其他行业相关的基建行政管理工作。
工程测量技术专业
培养目标:培养具有扎实的工程测量技术知识和技能,在测量技术领域具有较强的实践能力的高技能应用型人才。
专业特色:工程测量技术专业的特色一是实践环多,通过各种实习,培养学生熟练的实际操作能力;二是与计算机技术结合多,实行计算机教学不断线,使学生具备较高的应用计算机解决测绘问题的能力;三是与测量工种技能资格证书教育相结合,学生在第三学年可报考测绘行业通用的“中级测量员”和建设行业通用的“中级测量放线工”;四是加强土木工程方面的课程,使学生具备一定的土建理论、知识和技能,力争成为在测量技术上有专长,在施工技术上有一定基础的复合型人才。
主干课程:控制测量、土地资源学、地籍测量、土地规划与开发利用、地籍管理、土地法规概论、土地经济学、建筑力学、土木工程概论、计算机地图绘制等。
实践课程:测量实习、中级测量工职业技能训练、计算机操作、生产实习、毕业实习、毕业设计等。
就业方向:毕业生面向国土测绘、房地产、城镇规划、林业、交通、建筑施工等企事业单位,可从事控制测量、数字绘图、工程测量、地籍测量、房地产评估及管理工作。
基础工程技术专业
培养目标:本专业培养具备基础工程技术必需的文化基础知识和专业理论知识,掌握本专业所需要的岗位能力和专业技能,适应基础工程技术、管理等职业岗位要求的高等技术应用型专门人才。
专业特色:本专业教学注重理论和实际相结合,在要求掌握基本理论、基本专业知识的基础上,侧重学生动手能力的培养。学校专业实验室设备齐全,除校内有实习基地外,校外设有多个实习基地,实验、实训开出率100%。专业师资力量雄厚,专业教师定期不定期地外出为施工企业和监理企业提供技术服务。有8人获得国家注册监理工程师证、注册造价工程师证等执业资格证。
主干课程:建筑识图与构造、建筑工程测量、岩土力学、工程地质、建筑结构、施工组织与进度管理、地下工程施工技术、地基与基础、建筑工程定额与预算等。
实践课程:工程地质实习、结构设计原理课程设计、地下结构施工模拟实训、岩土工程勘察实习、计算机辅助设计、毕业实习等。就业方向:毕业生主要在建筑工程施工企业从事基础工程施工与岩土工程监测工作,也可以从事地基与基础工程项目施工组织、质量控制、材料监测、安全监督等方面的工作。