第一篇:2012版党政机关红头文件请示格式
广州市XXXXXXXXXX文件
XXX〔2015〕X号
签发人:
广州市XXXXXXXXXXXXXXXXXX 关于XXXXXXXXXXXXXXXXXXX请示
广州市XXX局:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX按政府采购渠道进行采购,预算每台XXXXX元,合计约需XXXXXX元。XXXXXXXXXXXXXXXXXXXXXXXX。
专项请示,盼请批复。
广州市XXXXXXXXXXXXXXXXXXXXXXXXXX
201X年X月XX日
(联系人:XXXXX 联系电话:12345678、12345678901)
第二篇:党政机关红头文件
No:0000001 机密★一年 特急
□□□□□□文件 □□□〔2009〕□号
□□□□□□
□□□□□□:
□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□。
□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□。
□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□□。□□□□□□□□□□□□□□□□□□□□□□□□□ —1—
第三篇:红头文件请示
XXXXX[2013]XX号
签发人:XXXXXX
关于XXXXXXXXXX的请示
XXXX局:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
以上请示,当否,请批复。
附件:
1、XXXXX
2、XXXXX
二〇一二年三月二十六日
(联系人:XXX 联系电话:XXXXXXXX)
主题词:
XXXXXXXXXXXXXXXXXXX办公室 2013年04月14日印发
共印10份
第四篇:党政机关公文写作——请示
请示
例文:
x x省人民政府
关于增拨防汛抢险救灾用油的请示
×府〔××××〕 ××号
国务院:
今年入汛以来,我省气候异常,旱涝交错,灾害的突发性、阶段性十分明显。进入主汛期后,出现三次较大的降雨过程,使我省×××、×、××等地区的十多个县发生了洪涝灾害。特别是进入八月份以后,××江连续发生两次大洪水,更加重了灾害程度(灾情统计待汇总核实后另报)。
近三十多天,为战胜××江洪峰,确保沿江城、镇、铁路、油田和人民生命财产安全,××地区的××、××、××、××等县(市)以及××省驻军,每天出动十二万多人、三万五千多台机动车辆,日夜抢修加固堤坝,运送抢险物资。现已耗用柴油三千七百吨,汽油二千吨。
据省防汛指挥部报告,××江洪水消退到安全水位要到九月下旬。目前抗洪抢险的重点,已由加高、加实、加固堤坝,转为在二百多公里长的堤坝上防风浪、抢险段,以避免渗水滑坡。抗洪战线长,洪峰消退慢,抢险工程量大,恢复生产、重建家园和修复水毁工程的任务十分艰巨。为此,特请国家增拨抗洪抢险救灾用柴油五千吨、汽油五千吨。请予审批。
以上意见妥否,请指示。
××省人民政府(公章)××××年×月×日
第五篇:红头文件
G210 G标经部字 [2011] 7号 签发人:何义军
关于G标段项目经理部施工组织设计的报告
G210西乡至镇巴二级公路改建工程J4驻地办:
我项目经理部已完成《G210 G标实施性施工组织设计》的编写工作,现向贵办上报。
特此报告!附:《G210 G标实施性施工组织设计》
原材料试验报告
导线点、水准点复测成果
二〇一一年六月十六日
主题词:G标段 施工组织设计 报告
G210西乡至镇巴公路改建工程G标项目经理部2011年6月16日印发 共印6份