1.适用范围

2.产品特点及作用场所 3.使用条件 4.产品运输 5.产品装卸 6.检查验收 7.产品安装 8.运行前的检查 9.试运行

10.变压器的维护和保养 11.安全注意事项

Content

1.Usage scope 2.Character & Application 3.Usage requirement 4.Product Transportation 5.Product load & discharge 6.Inspection before receive 7.Product install

8.Inspection before operation 9.Test operation

10.Repair and Maintain 11.Safety Notice

1.适用范围

本说明书适用于我公司生产的SC9、SCB9、SC10、SCB10、SCR9系列额定容量为6300KVA及以下,电压等级为35KV及以下的有载和无载调压树脂绝缘干式电力变压器的装卸、运输、仓储保管、安装、使用及维护等。2.产品特点及使用场所

我公司生产的环氧树脂浇注干式变压器引进国外先进技术,我公司通过反复的生产实践及频繁的理化试验成功解决了这一尖端难题,产品技术性能指标完全符合国家标准GB1094.1~2-1996、GB6450-86,技术参数符合GB/T10228-1997标准。

该产品具有以下特点:

2.1减少了包封层树脂厚度,增强了线圈的散热能力。2.2线圈采用玻璃纤维增强网格板加强、增强了线圈的机械强度;提高了产品抗突发短路能力,线圈永不开裂;

2.3线圈采用真空浇注工艺、极大地减少了线圈局部放电量,提高了线圈电气强度;

2.4防爆过载能力高,冷热冲击稳定性好,噪声低; 2.5带温控和风冷却装置,三相温度同屏显示,自动启停风机、故障报警、超温报警、超温跳闸以及黑匝子功能,并通过RS485串行通讯接与计算机连接,运行集中监视及控制;

由于我公司树脂浇注干式变压器具有以上特点,因此该系列产品广泛应用于输变电系统,如宾馆饭店、机场,高层建筑、商业中心、住宅小区等重要场所,以及地铁、冶炼、电厂、轮船、海洋钻井平台等环境恶劣场所。3.使用条件

3.1户内式

3.2海拔不超过1000M 3.3环境温度:

最高气温:+40℃

最高日平均气温:+30℃

最高年平均气温:+20℃

最低气温:-5℃(户内)3.4电源电压的波形:

电源电压的波形近似正弦波。3.5多相电源电压的对称性:

多相变压器所连接的电源电压应近似对称。3.6绝缘耐热等级F级

3.7带外壳保护等级IP20、IP23等。4.产品运输

4.1产品可用火车、轮船、汽车和飞机等交通工具进行运输,其车箱或船仓必须保持清洁,无污染物;

4.2产品装车情况必须符合运输规程中的要求并将产品安放牢固,在运输过程中不允许有颠簸、碰撞、振动和冲击现象,并应防止日晒雨淋;

4.3无包装箱的变压器,附带的零件,出厂文件等另装成箱与变压器一起发运;

4.4产品运输过程,其倾斜度不得大于15°; 4.5产品在车站、码头中转或终点卸下后不允许堆码,同时下面要用木头等垫好垫高不小于100MM。5.产品装卸

5.1产品装卸可采用起重机,行车等起吊设备,装卸时应严格按照国家有关装卸规程: 5.2运输安装过程中,带包装箱起吊时,应起吊包装箱四下角标记处起吊。6.检查验收

用户收到变压器后应进行检查验收:

6.1检查包装及防潮设施完好,无雨水浸入痕迹; 6.2检查产品铭牌参数如产品型号、额定容量、额定电压、联接组别号、阻抗电压和外形尺寸、外形结构、重量等是否符合合同要求和有关国家标准规定;

6.3检查产品说明书,检验合格证,出厂试验报告,装箱清单等随机文件是否齐全;

6.4检查附件和备品的规格,数量与装箱清单是否相符; 6.5检查产品运输过程中有无损伤,产品的零件是否损伤、松动、断裂、绝缘是否有破损等;

6.6产品开箱检查完毕,如不立即投入运行,应妥善保存或重新包装好。7.产品安装

7.1安装前应认真阅读本说明书,产品铭牌和产品外形尺寸,了解产品重量,安装方法等内容,准备好相应的起吊设备和工具;

7.2产品安装基础设施满足载荷、防震、底部通风等要求; 7.3室内通风和消防设施符合有关规定,通风管道密封良好,通风孔洞不与其它通风系统相通;

7.4温控、温显装置设在明显位置,以便观察; 7.5室内照明布置符合有关规定;

7.6室内采用不燃或难燃材料,门向外开,门上标有设备名称和安全警告标志,保护性网门栏杆等安全设施完善;

7.7变压器与配电装置连接安装时,配电装置的安装符合设计要求和有关标准的规定,柜、网门的开启互不影响;

7.8导体连接紧固、相色表示清晰正确;

7.9带电部分的相间和对地距离等符合有关设计标准的要求;接地部分牢固可靠;

7.10温控装置的电源引自与变压器低压侧直接的母排上;具有足够开断容量的熔断器保护,并根据应急使用的重要程度采用自动切换的双路电源系统供电。8.运行前检查

8.1测量所有分接变化,符合铭牌电压变比规律,且额定分接允许误差为±0.5%,其它分接允许误差小于1%;

8.2检测三相变压器接线组别或单相变压器的极性,与铭牌标示相符;

8.3测量绕阻绝缘电阻,其值不低于出厂试验值的70%; 8.4测量铁芯对也绝缘电阻,其值不小于5MΩ;

8.5外施工频耐压试验,试验电压为出厂试验电压的85%; 8.6对于有载调压变压器,应根据有载调压分接开关使用说明书作投入运行前的必要检查和试验。9.试运行

9.1变压器投入运行前,应根据变压器铭牌和分接指示牌将分接片调到合适的位置;9.2无载调压时,应根据电网电压把调压分接头的连接片铵铭牌和分接指示牌上的标志接到相应的位置上;9.3有载调压时,应参照有载调压分接开关使用书,在断电情况下,分接开关调试正常后方可投入运行;9.4变压器有温度控制箱和温度显示仪时,请参看温度控制箱和温度显示仪使用说明书,在温度或温显调试正常,先将变压器投入运行,后投入温控和温显;9.5变压器投入运行后,所带负荷应由轻到重,切忌盲目一次大负载投入;9.6变压器过负荷应按照GB/T17211《干式变压器负载导则》;

9.7变压器退出运行后,一般不需要采取其它措施即可重新投入运行,但是如果是高湿度下且变压器已发生凝露现象,那么必须经干燥处理后,变压器才能重新投入运行。10.变压器维护和保养

为了保证变压器正常运行,需对它定期维护保养

10.1一般地,在干燥清洁的场所,每年或长一点时间进行一次检查,在其它场合,例如可能有灰尘或化学烟雾污染的空气进入时,第三至六个月进行一次检查;

10.2检查时,如发现有过多灰尘聚集,则必须清除,以保证空气流通和防止绝缘击穿,特别要注意清洁变压器绝缘子,下垫块凸台处,并使用干燥的压缩空气(2-5个大气压)吹净通风道中灰尘;

10.3检查紧固件、联接件是否松动,导电件有无生锈、腐蚀的痕迹,还要观测绝缘表面有无爬电痕迹和碳现象,必要时应采取相应有措施进行处理;

10.4有载调压变压器应参考有载分接开关运行绝缘电阻的测试来判断变压器能否运行,一般无需进行其它测试;

10.5变压器运行若干年(建议五年)后进行绝缘电阻的测试来判断变压器能否运行,一般无需进行其它测试;

10.6干式变压器检修后的验收,应符合《电力变压器检修导则》DL/T573和电力设备预防性试验规程的有关规定。11.安全注意事项

11.1变压器安装完毕投入运行前,对于无外壳的变压器,应在变压器周围安装隔离栅栏,以避免意外事故发生;

11.2变压器投入运行以后,禁止触摸变压器主体,以防事故发生;

11.2变压器试验、安装、维护必须由够资格的生产人员承担。

1.Application scope The instruction is applicable to SC9.SCB9.SC10, SCB10, SCR 9 series in our company and rated capacity ≤6300KVA voltage ,voltage degree≤35KV, load and unload regulate voltage Epoxy resin insulation dry-type power transformer, load, transporation, stock, install, usage and repair.2. Character & Application The Epoxy resin pour dry-type power transformer take advanced technology from oversea,scientific artcraft, our company do test again and again,offen make rationalize test to solve this top degree problem,all technic character are meet National standard GB1094.1~2-1996、GB6450-86,techni specification meet to GB/T10228-1997 standard.The product have following feature:

2.1 Reduce the thickness of envelopment resin ,increase the heating ability of coil.2.2 The Coil take the grid boad which is made of Glass fiber to increase coil mechanic strength,improve to anti-shor circuit ability,coil won’t crack forever.2.3Coil take vacuum injection handcraft ,proper reduce the discharge and improve the electric strength.2.4 Higher ability of anti-explosion, stability of cool and hot strike,low noise.2.5 With temperature control and Cooling device,3 phase temperature scres show,start fan motor, auotomatic,over-temperature warning,over-temperature shut down,and black dense function, while connecting RS485 communication to computer,operation center inspection and control.Our Epoxy resin pour dry-type power transformer have above feature,so this kinds of product wifely used for ouput transformer systetm.such as Hotel, Airport,Higher architecture,business center,department bulding and others important place, also subway,smelt,power factory,steamship,sea artesian well and others bad environment place.3.Usage requirement 3.1 indoor

3.2 1000M, the altitude less than 1000M, 3.3 Environment temperature

The Max temperature:+40℃

The max day average temperature:+30℃

The max year average temperature:+20℃:

The low temperature:-5℃ 3.4the wave of power voltage:

The wave of power voltage similar with Sine wave 3.5 The Symmetry of multiphase

The connecting power voltage of multiphase similar symmetry.3.6 Insulated temperature resistance F degree.3.7 With Cover protection degree IP20,IP23 and so on.4. Product Transportation 4.1 can be transported by Train, steamship,truck,air and others transportation,the truck trunk or ship store must be clean and no dirty.4.2 When load must be fix tighten,to prevent the bump,hit,librate and impact,also the sunshine and rain.4.3 Transformer without package ,accessory,and documents and others to make package together to delivery.4.4 when transportation, the lean must be less than 15°.4.5 Don’t discharge in mass when station , dock transfer or destination,must make wood fill up, which more than 100MM.5. Product load & discharge.5.1 Product load and discharge can take by crane,travelling crane and others device,and strict meet national requirement process.5.2When transportation, if with package carton, should mark on each angle。

6. Inspection before receive when customer get the transformer, should inspecti it.6.1 Package and moistureproof well,no water invade trail.6.2 Check the product label such as the model rated capacity, rated voltage,connection no.anti-voltage,outside size,construction,weight and other whether meet contract requirement or national standard.6.3 Check the instructon, test confirm,test report,packing list and others documents

6.4 Check the accessory, back up product specification, quantity, whether same as packing list.6.5 Check whether have damage when transportation,the accessory damnify ,start,rupture,insulated whether have broken and so on.6.6 After inspection all, if not put into operation, sould package well and store.7. Product install 7.1 Should read this instruction, product label, outside size before installing, know the weight, how to install and others,ready to others device and tools.7.2 the basic instruction must be meet load, shockproof,ventilation requirement..7.3 Indoor ventilation and fire protection meet relative requirement,ventiduct airproof well,vent hole don’t connect with others air system.7.4 Temperature control,temperature show device should put obviousity place, easy to check.7.5 inddor liging disposal meet relative regulate.7.6 inddor take fire-resist material, door to ourside and label decive name, safe warning,protective net door and others safety establishment.7.7 When connect transformer to electric device, the electric device should meet design requirement and relative point.7.8 Conductor fix well and phase colour should clearly.7.9 the distance between the electric phase and against earth meet relative design requirement,connecting earth should fix well.7.10 The power of temperature device should from the femal rank side transformer,have enough capacity to fuse operation, and tale change to double power automatic according to the emergengy degree.8.Inspection before operation 8.1 Measure all tap change,meet nameplate change rule,and rated tap allow error is ±0.5%,the rest allow error is less than1%.8.2 Test the 3 phase transformer connecting or the pole of single transformer ,meet nameplate requirement.8.3 Measure the insulated resist of coil, the value more than 70% test value.8.4 Measure the iron coil insulated resist, the value more than 5MΩ.8.5 Outside press anti-voltae test, the test voltage should be 85% of test voltage.8.6 About the load regulate voltage transformer, should according to the load regulate tap switch instruction to put into test check and test.9.Test operation 9.1 Before operation, should according to the nameplate and tap direction label to make tap slice into correct position.9.2 when unload regulate voltage, should according to electric net voltage to make regulate voltage tap slice,nameplate and tap direction to make correction position.9.3 Load regulate voltage, should according to load voltage tap switch instruction, tao swutcg test wekk after shut power ,then can put into operation.9.4 the transformer have temperature control box and temperature show,please check attached instrciton,when temperature is normal, put the transformer operation at first, then put into temperature control and shower.9.5 After transformer operaion,the load shoud from light to heavy, don’t make one big load blindness.9.6 Over load should meet GB/T17211(dry type transformer load rule)9.7 After transformer stope operation, no need take others action to put into operation again, but if higher humid and transformer have cold already, so should take dry action, then transformer can operation again.10.Repair and Maintain To maintain the transformer operation well, should make repaire and maintaince.10.1 Generally, in dry place, clearn it one time every year or mor long time.If others place if have dust or chemisty air inside, should check every 3 month or 6 month.10.2 When check, if find collect dust, should clearn them to keep the air ventilation and prevent insulated attack.special clearn the insulated terminal of transformer,the mat of desk,and keep the dry compress air(2-5 dry air)to clean the dust 10.3 Check the fix firmware,join piece whether start, conductor whether have rust,corrosive trial,also check whether have climp electric and carbon trial on the insulated surface.Should take relative action to solve if need.10.4 Load regulate voltage transformer should consider the resistant of load tap switch to judge the transformer whether can operation, no need make the rest test.10.5 After several year operation(Suggest 5 years),to do the resulated resist test to judge the transformer whether can operation, no need make the rest test.10.6 After Dry-type transformer inspection, should meet the(Electric transformer repaire rule)DL/T573 and the electric device anti-test rule.11.Repair and Maintain 11.1 When transformer operantion, should make safe barrier around transformer, to prevent accident.11.2 When transformer operantion,Warning to touch the main part of transformer to prevent accident.11.2 The test of transformer,install, repaire should be done by qualification worker.

第二篇:BWDK干式变压器温度控制器使用说明书(塑壳)

BWDK干式变压器温度控制器使用说明书(塑壳)

一、产品概述

BWDK系列电脑温控器是我公司为风冷干式电力变压器可靠运行而设计的新一代多功能型电脑温度控制器。利用预埋在干式电力变压器三相绕组线包中的三只Pt100铂热电阻来检测干式电力变压器线包的温升,并根据温升自动控制冷却风机的启停、超温报警直至超高温跳闸以保证干式电力变压器的安全运行。由于采用目前先进的RISC单片计算机并结合先进的I2C存储与调整技术,根据JB/T7631标准设计而成,使得温控器具有结构简单,运行可靠,抗干扰能力极强的特点。同时温控器还具有“黑匣子”功能,可记录停电前三个绕组包的温度及本机的工作状态。

二、技术参数 1.使用条件

环境温度-10℃~+55℃ 相对温度 5-95% 大气压 60-160KPa 工作电压 AC170-AC250V(48-60Hz)2.测量范围-40.0-200℃ 3.分辩率 0.1℃ 4.测量精度±1℃ 5.控制精度±1℃ 6.功耗<8VA 7.重量<1Kg 8.传感器参数 Pt100 9.抗干扰性能符合JB/T7631标准 10.触点容量

风机:AC125/10A或AC220/7A 三组或单相有源风机AC220/21A 一组超温报警:AC125/10A或AC220/7A 一组

超温跳闸:AC125/10A或AC220/7A 一组 11.仪表外型尺寸 80×160×134mm 嵌装开孔尺寸 154×77mm

三、产品功能介绍 1.检测并巡回展示三相线包绕组温度或只显示三相线包绕组中温度最高的一相绕组温度。巡回显示时每相显示约8秒。

2.故障声光报警:传感器故障时相应的A、B、C相指示灯亮,机器内发出嘀嘀声并接通报警触点。显示器显示X—50.0,X表示出现故障相位。3.风机启动和关闭功能:当三相线包绕组中有一相温度达到设定的风机启动温度值时风机自动启动,风机启动时风机指示灯亮。当三相线包绕组中没有一相温度大于设定的风机关闭度值时风机自动关闭。

4.超温报警功能:当三相线包绕组中有一相温度达到设定的超温报警温度时温控器发出声、

第三篇:干式变压器执行标准

、干式变压器产品结构及优点:

铁心:铁芯选用进口优质冷轧硅钢片,全料接缝结构,芯柱采用F级无维粘绑扎,铁芯表面采用绝缘树脂漆密封防潮防锈,降低了空载损耗,空载电流和铁芯噪声,夹件和紧固件经特殊表面处理,使产品外观质量有了进一步提高执行标准。

绕组:有以下几种:(1)缠绕式

(2)环氧树脂加石英砂填充浇注

(3)玻璃纤维增强环氧树脂浇注(即薄绝缘结构)

(4)多股玻璃丝浸渍环氧树脂缠绕式(一般多采用3,因为它能有效的防止浇注的树脂开裂,提高了设备的可靠性)

高压绕组:一般采用多层圆筒式或多层分段式结构

低压绕组:一般采用层式或箔式结构

二、干式变压器执行标准:

1)、IEC60076-11:2004干式电力变压器

2)、GB1094.1-1996电力变压器

3)、GB1094.11-2007干式电力变压器

4)、GB/T10228-2008干式电力变压器技术参数和要求

5)、JB/T10088-2004

6KV-500KV级电力变压器声级

三、干式变压器型号说明:

SC(B)

□—M—□/□

S:表示

三相变压器

C:表示

树脂浇注式

B:表示

箔绕线圈

□:表示

性能水平代号

□/□:表示

额定容量KVA/电压等级

四、干式变压器使用条件:

海拔不超过1000m;

环境温度:最高气温+40℃;最高日平均气温+30℃;最高年平均气温+20℃;户外最低气温-30℃;户内最低气温-5℃

五、干式变压器防护方式:

根据使用环境特征及防护要求,干式变压器可选择不同的外壳。通常选用IP23防护外壳,可防止直径大于12mm的固体异物及鼠、蛇、猫、雀等小动物进入,造成短路停电等恶性故障,为带电部分提供安全屏障。若须将变压器安装在户外,则可选用IP23防护外壳,除上述IP20防护功能外,更可防止与垂直线成60°角以内的水滴入。但IP23外壳会使变压器冷却能力下降,选用时要注意其运行容量的降低。

第四篇:干式变压器绝缘材料选择参考

乾式變壓器絕緣材料選擇參考

杜邦可直接授权电机客户使用达致国内客户成本效益之素求,主要材料均已国产制造协助客户申请电机UL认证(通过杜邦指定的合作伙伴)远较客户自己申请电机UL认证,费用更省,需时更少众所周知,如果电机厂想要出口其产品到美国,那么他的电机必须先获得美国UL认证。而获得电机UL认证的最便捷的办法就是通过UL认可的绝缘系统来申请电机的认证:根据我们的经验,通过我们的绝缘系统来申请电机UL认证比起完全靠客户自己申请,费用要节省70%-80%,时间要节省50%以上。尽管如此,电机厂在申请的过程中还是会碰到许多些问题,以下是一些最典型的问题

1.1.绝缘系统上的所选用的都是进口材料,既增加了生产成本,同时采购也极不方便,怎么办? 2.有些绝缘系统尽管有国产材料,但是往往只有一家,没有其它选择,怎么办? 3.我们虽然需要 UL 认证,但不懂如何申请,怎么办?

为解决这些问题,杜邦中国集团有限公司先进纤维部推出了 600 伏特 F 级的电机绝缘系统20-D。这是一套以杜邦公司NOMEX®产品为基础的 UL 绝缘系统。与其它绝大多数绝缘系统(包括杜邦公司以往推出的系统)所不同的是: 20-D 系统的所有材料均已国产化,每种材料都有数家供货商可供选择,并且所选用的国产材料本身大多数都已获得美国 UL 认证。因此,电机客户可以非常便利地在国内采购符合 UL 规定的材料—既节省了费用,又节省了精力。

另外,本系统与其它系统相比最大优势的还在于:我们不但向客户推荐和免费授权系统,并且我们还通过推荐杜邦的合作伙伴—杭州泰达公司来帮助电机用户申请电机的 UL 认证。客户只需支付少量的费用,泰达公司就可以提供一整套的专业服务来帮助电机厂申认证(包括联系美国 UL 公司,帮助客户理解 UL 1004 文件,指导客户按 UL 的相关规定生产电机样品,安排电机送样,联系 UL 获得试验结果以及与之相关的英文文件的翻译工作)。这样,电机厂可以节省大量的时间和精力,同时也可以少走弯路,大大提高一次通过的成功率。

总之,通过杜邦的NOMEX®中国化绝缘系统 20-D 来申请电机 UL 系统,省时,省力,省费用。即使您对 UL 认证过程并不了解,您也可以轻松获取认证,为您的电机产品出口美国市场取得“通行证” 以杜邦™ NOMEX®为基础—通过 UL 认证的 600 伏电压以下 F 级(155 ℃)电机绝缘系统 20-D UL File No.E 57692 电磁线

MM-5 ; MW-35C ; MW-30.用最小厚度为 2mil 的NOMEX®纸绝缘,且 ? 包率至少为 50% 的导体

对地绝缘和相绝缘 杜邦™ NOMEX® Paper * Type 410 4mils Type 411 10mils Type 414

Type 418

4mils 5mils

* 最小厚度

复合材料含至少含 4mil Type416 或 Type464 : 瑞安绝缘材料有限公司 产品名称: NMN X-X-X 杭州泰达实业有限公司 产品名称: NMN X-X-X

辅助片状绝缘

如上所列对地绝缘材料,其含NOMEX®纸的最小厚度同上所列: 瑞安绝缘材料有限公司 产品名称: NMN X-X-X 杭州泰达实业有限公司 产品名称: NMN X-X-X 绝缘漆

杜邦™ Herberts® 高性能涂料 产品名称: E8565 * 限制用于 MW35,MW30, MW73, MW74, MW76 漆包线

John C Dolph 公司

产品名称: CC-1105,CC-1105HTC

* 限制用于MW35,MW73,MW74漆包线 吴江市太湖绝缘材料厂

产品名称:ET-90(UL File No.E228349)

* 限制用于MW35,MW73,MW74漆包线

嘉兴市荣泰绝缘材料有限公司(嘉兴Rota-Ropa绝缘材料公司)产品名称: R-1140-M(UL File No.E227128)* 限制用于 MW30, MW35 漆包线 嘉兴清河绝缘材料有限公司

产品名称: 0840 聚酯无溶剂树脂(UL File No.E225309)* MW5,MW30,MW35 漆包线均可使用

绝缘粘带

3M 公司

产品名称: 92聚?亚胺薄膜粘带(用杜邦™ Kapton® 薄膜)杭州泰达实业有限公司

产品名称: AI-S10, AI-S20聚?亚胺薄膜压敏胶带

AE-S10, AE-S20聚酯薄膜压敏胶带

上海合成树脂研究所

产品名称: YmM聚?亚胺薄膜压敏胶带 上海金张绝缘材料公司

产品名称: 6251聚?亚胺薄膜压敏胶带

6240聚酯薄膜压敏胶带 上海前峰绝缘材料厂

产品名称: 6256 聚 ? 亚胺薄膜压敏胶带 引出线

江阳华明特种电缆股份有限公司

AWM 3321 XLPE绝缘电缆(UL File No.186948)

AWM 3530 硅橡胶绝缘电缆

无锡爱邦高聚物有限公司

产品名称: UL3289 辐照交联聚乙烯绝缘电机线圈引接线(UL File No.E186848)槽楔

上海绝缘材料厂

产品名称: 3240环氧酚醛玻璃布层压板(UL File No.E139310s)四川东方绝缘材料有限公司

产品名称: 3240 环氧酚醛玻璃布层压板 西安绝缘材料厂

产品名称: 346环氧酚醛玻璃纤准层压板 沈阳华美绝缘材料厂

产品名称: SH 3940 F级聚酯亚胺引拔材料

上海元龙玻璃钢有限公司

产品名称: 用于电机的玻璃纤维增强引拔槽楔

A型:FB-O邻苯不饱和聚酯树脂-无?无捻玻璃纤维增强引拔槽楔

B型:FB-I 间苯不饱和聚酯树脂-无?无捻玻璃纤维增强引拔槽楔

C型:FB-V 乙烯基树脂-无?无捻玻璃纤维增强引拔槽楔 套管

上海嘉昌电气绝缘品有限公司

产品名称: 玻璃纤维有机硅自熄套管No.SSG1,2,3.(UL File No.E204027)上海神电工贸有限公司

产品名称: SRG-514 玻璃纤维有机硅自熄套管(UL File No.E220807)AG-602F 级丙烯酸酯玻璃纤维漆管

绑扎带

上海耀华复合材料有限公司

产品名称: ET 71025 无玻璃纤维带 PT 72025 电气聚酯纤维编织带

上海海鹰绝缘玻璃纤维有限公司 产品名称: ET100 无玻璃纤维带

PGT 71220 无玻璃纤维和聚酯纤维交织带

出线板

美国英代而热固性复合材料深圳有限公司

产品名称: BMC-48-50 模压复合材料(UL File No.E3587R)

如有任何问题,欢迎致电:

杜邦中国集团有限公司 电话:(8621)6386 6366 转先进纤维部 传真:(8621)6385 3780 杭州泰达实业有限公司 电话:(86571)8813 9777 传真:(86571)8813 9407

第五篇:呼吸机说明书的中英文对照表

呼吸机说明书的中英文对照表 Volume Control 容量控制,简称VC基础通气模式之一,预设潮气量,呼吸频率,通气效率保证,气道压力可变IPPV Intermittent Positive Pressure Ventilation 间歇气道正压通气Drager产的呼吸机上的叫法,其实就是容量控制通气Pressure Control 压力控制,简称PC基础通气模式之一,预设吸气压力,呼吸频率,气道压力固定,潮气量可变A/C Assist/ Control 辅助/控制通气基础通气模式之一,允许患者自主触发辅助通气,目前的呼吸机上的容量控制和压力控制通气都有A/C的含义SIMV Synchronized Intermittent Mandatory Ventilation 同步间歇指令通气混合模式,同步给予强制或辅助通气,间歇期允许患者自主呼吸或触发支持通气PSV Pressure Support Ventilation 压力支持通气支持模式,所有呼吸均由患者触发,呼吸机给予正压支持ASB Assisted Spontaneous Breathing 辅助自主呼吸Drager呼吸机上的叫法,其实就是PSVBIPAP Biphasic Positive Airway Pressure 双水平气道正压Drager呼吸机首创模式,两个气道正压周期性转换,产生潮气量,同时允许患者在两个压力水平上自主呼吸BiPAP Bilevel Positive Airway Pressure 双相气道正压伟康无创呼吸机专有模式,吸气相和呼气相交替切换两个压力水平,无创通气模式注:目前对于BIPAP和BiPAP的中文译名存在一定混乱,这里采用Drager呼吸机说明书上的说法,可能有的文献命名方法完全相反,个人感觉搞清楚两者的区别比纠缠名字更有意义APRV Airway Pressure Release Ventilation 气道压力释放通气BIPAP的一种形式,低压相时间特别短,欧洲也把APRV与BIPAP通用CPAP Continuous Positive Airway Pressure 持续气道正压自主呼吸模式,呼吸机只给予一个持续的正压,患者自主完成呼吸过程PRVC Pressure Regulated Volume Control 压力调节容量控制双重控制模式,MAQUET Servo呼吸机首创,预设潮气量,呼吸机自动调节吸气压力,保证以最低的压力输送预设潮气量APV Adaptive Pressure Ventilation 适应性压力通气Hamilton呼吸机上的叫法,与PRVC相似VTPC Volume Target Pressure Control 容量目标压力通气Newport呼吸机上的叫法,与PRVC相似VAPS Volume Assured Pressure Support 容量保障压力支持鸟牌呼吸机上的双控模式,在一次呼吸内,如果指定时间内未输送完预设潮气量,即转为压力支持直至潮气量完成Paug 压力扩增熊牌呼吸机上的双控模式,与VAPS相似VSV Volume Support Ventilation 容量支持通气双重控制模式,与PRVC不同处在于所有的呼吸必须由患者自己触发MMV Minute Mandatory Ventilation 分钟指令通气预设目标分钟通气量,当实际通气量不足时呼吸机给予指令通气,保证达到预设通气量目标ASV Adaptive Support Ventilation 适应性支持通气闭合环通气模式,呼吸机自动调节支持水平,使得患者处在预设的“理想通气范围”内PAV Proportional Assist Ventilation 成比例辅助通气PB以及Stephanie呼吸机上的一种模式,呼吸机监测气道阻力和顺应性变化,间接判断患者吸气努力大小,并成比例的给予通气辅助PPS Proportional Pressure Support 成比例压力支持Drager呼吸机上的特有模式,与PAV相似

accumulator贮气箱(装置)adap ter接合器,接口adjusting tap 调节柄air inlet filter空气输入滤过器airway p ressure呼吸道压alarm indicator报警显示alveolar p ressure肺泡内压amp lifier增幅唇apnea呼吸暂停apnea indicator呼吸暂停显示装置assembly装置、组合assist/controlmode,A /C辅助/控制通气back-up ventilation备用通气bacterial filter细菌滤过器bag囊ballon valve球囊式活瓣bellows风箱bleed regulator排气调节器blower鼓风机calibration校准、定标chamber腔check valve单向阀compensator代偿装置comp ressor压缩器、压缩装置continuous positive airway pressure(CPAP)持续呼吸道正压continuous flow持续气流control knob调节炳cooling fan冷却扇corrugated hose螺纹管、呼吸管道crossover soleniod交通电磁阀delay dial廷迟设定demand flow按需气流demand valve按需供气阀diaphragm 隔膜digital amp lifer数字型增幅器drive system驱动系统electrical switch电子开关electrodynamic valve电动阀exhaled gas呼出气exhalation time呼出时间exhalation valve呼出阀exhaust valve气体排出活瓣(阀)exp ired minute volume呼气分钟通气量feed back servocontrol反馈伺服控制filling solenoid充气电磁阀(气流开关)filter滤过器flap valve平行阀flow control valve流量控制(调节)阀flowrate流速flow transducer流量传感器flow trigger流量触发(器)flush knob冲洗按键gas outlet气体出口gas samp ing pump 气体采样泵gas supp ly气体供应generated p ressure驱动压

SPONT = CPAPPSV = CPAP + 吸气压力支持(举例来说,CPAP=5cm H2O,那么患者在吸气和呼气的时候,气道内的压力都是5cm H2O;PSV模式下,如果PS=5,PEEP=5cm H2O,那么在呼气相的时候气道内的压力为5cm H2O,吸气相的时候气道内的压力为10cm H2O,也就是患者在吸气的时候得到了5cm H2O的压力支持。所以在PSV模式下,如果把PS设置为零,那也就成了CPAP或者SPONT。)

下载干式变压器中英文说明书word格式文档
下载干式变压器中英文说明书.doc
将本文档下载到自己电脑,方便修改和收藏,请勿使用迅雷等下载。
点此处下载文档

文档为doc格式


声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:645879355@qq.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。

相关范文推荐

    美国L1签证说明书(中英文对照)(五篇范文)

    L1签证说明书 美国L1签证概念特点及申请条件 美国L1签证概念: L1签证,跨国经理人或者跨国公司调派人员(Intracompany transferee Visas) 签证,顾名思义,谈到跨国经理或者跨国职员,......

    10KV干式变压器采购招标公告

    10KV干式变压器采购招标公告 加入收藏 (时间:2010-3-23 15:50:01) 安徽 http://www.xiexiebang.com/ 分享到: 合肥南区集中供热热源二期工程输煤系统变配电室10KV干式变压器采......

    干式变压器优化设计论文[五篇材料]

    所谓的电力变压器,指的是通过将交流电源输入后,依据一定技术,将其数值变高或变低,在任何电能整合配送的场合,变压器显然都有着重大的应用。截止21世纪初,我国的发电量就已跃居世界......

    电液动三通分料器中英文说明书

    电液动三通分料器 Electric hydraulic three TongFen feeder使 用 说 明 书 OperationManual一、 设备简介 Ⅰ、Brief Introduction 该系列三通溜于(又名分料器)广泛适用于......

    干式变压器装配、浇注作业安全操作规程

    干式变压器浇注、装配作业安全操作规程 1. 严格按照设备操作规程和相关工艺要求进行线圈浇注作业,禁止用鼻子闻化学原辅材料等有毒有害物品。严禁将易燃品放在炉旁,工作完要洗......

    新庄洗煤厂干式变压器技术要求_20110720

    新庄选煤厂电缆桥架安装技术要求新庄选煤厂SCB10-1250/6/0.4干式变压器技术要求二〇一一年七月二十日据新庄洗煤厂生产需求,需购置SCB10-1250/6/0.4型干式变压器一台,为满足现......

    6KV配电室干式变压器事故应急演练总结

    6KV配电室干式变压器火灾事故 应急演练总结根据我厂反事故应急演练要求,调度室于2014年1月11日上午按照预案要求进行了一次干式变压器火灾事故应急救援演练。为了巩固演练工......

    干式变压器和油浸式变压器的优缺点

    干式变压器和油浸式变压器的优缺点 价格上干变比油变贵。 容量上,大容量的油变比干变多。 在综合建筑内(地下室、楼层中、楼顶等)和人员密集场所需使用干变。油变采用在独立的......