第一篇:浅谈施工缝的处理(土木工程毕业设计英文翻译)
Shallowly discusses the construction joint processing Introduction
Massive engineering structure shakes harms the example to indicate that, the portal frame construction pitch point universal destruction is heavier, often causes the structure to expire, the Chinese and foreign scholar analyzes indicated, this is the various reason, including the design fault, has not strengthened the pitch point intensity, realizes reason and so on strong pitch point strong anchor.Simultaneously constructs also has the construction quality weakness, difficulty with guarantees the design anticipated target.In construction new old concrete construction gap time, continues the surface position, continues the surface processing method, the new old coagulation locally born ripe ingredient and inspires pounds the influence pitch point caking intensity which the control quality all makes, therefore in portal frame construction project construction process, because in each pillar construction inevitably and the lower level pillar existence construction joint, how does leave alone the construction joint, how processes the construction joint, causes the project quality not to receive affects, guaranteed concrete the structure security, appears especially importantly.1.current portal frame construction pitch point job practice and the flaw.(1)the early time in the general portal frame construction, after pours a pillar, carries on a mold, after the template installment completes only then enters sewer the working procedure to pour the upper formation girder concrete, therefore acts according to constructs the time limit for a project and the person, the material, machine and so on the situation, the new old concrete continues the gap time length not one, when pouring the general pitch point pours together along with the girder concrete, and the pitch point concrete intensity rank carries on the construction according to girder
(2)along with the scientific research development and the construction level enhancement, in particular specialized level higher big general contractor starts in view of steel construction the pitch point construction quality weak characteristic to take a series of measures, when pours the upper oration steel construction carries on chiseling processing with
the drill rod front, pours carries on the watering to the old concrete to be moist, and in hands over in the composition plane with the high-grade cement mortar shop, steel construction the pitch point area concrete intensity rank generally uses the pillar(common pillar intensity and so on to rise), is pouring the pitch point zone time to strengthen inspires pounds and the strict control water-to-cement ratio.After a series of processing measure, the construction quality obtained the enhancement, but column the pitch point area concrete still was the construction weak area, is very difficult to obtain ideally continues the effect.(3)although continued the spot to carry on processing, but its flaw was very obvious: First uses the drill rod to carry on chiseling processing, extremely shirt and old concrete, so that the old concrete produces the initial micro crack, seriously affects the new old concrete to continue the intensity, also chiseling processing difficulty with controls the processing quality specification front, pours to continues the spot moistly to carry on the watering to be very easy to work just the opposite, thus increased has handed over the composition plane place concrete water-to-cement ratio, but in handed over in the composition plane with the high-grade cement mortar shop to be very easy because the high-grade cement mortar and the green concrete hydro mass congealed and the contraction different, thus caused to continue the surface to be easier to have the initial stress and the initial micro crack.But pitch point area concrete intensity rank difference and girder, thus caused the column girder pitch point area actually to produce four frontal zones(although girder and pitch point area whole poured, but concrete intensity rank general different, thus also has created weak contact surface), when construction was very difficult to control inspires pounds the density and the time, was very easy because inspired pounds the depth but to injury and the old concrete, or because strengthened inspires pounds causes originally water-to-cement ratio to have the partial bleeding phenomenon on the quite small concrete, thus the influence concrete intensity growth, reduced the contact surface caking intensity.2.Column pitch points areas destruction mechanism and the earthquake resistance design request by shakes harms the investigation obviously, column the pitch point area destruction, mostly is because the pitch point area does not have stirrup or are few stirrup, in cuts presses under the function the concrete to appear the slanting crack even to extrude destroys, creates
the longitudinal reinforcement buckling to become the lantern shape.Therefore, guaranteed the pitch point area not premature has the shearing failure main measure is guaranteed the pitch point area concrete the intensity and the density, is enough in the pitch point area disposition stirrup.The design column frequently uses the different rank the concrete, when the construction must pay attention to column the pitch point spot concrete rank to be supposed same or is slightly low with the column concrete rank(difference not to be able to surpass 5M pa).Thus realizes the strong pitch point strong anchor.In the vertical pressure and the girder end pillar end moment, under the shearing force function, the pitch point area has the more complex stress condition.Pitch point experiment which from unit and so on Beijing construction design institute carries on obviously, the pitch point destruction process approximately may divide into two stages: The first stage for passes the crack stage.When the function and the core shearing force achieved when 60 ~ 70%, the core area appears links up the slanting crack, the crack opening approximately is 0.1 ~ 0.2m m, the reinforcement stress is very small(does not surpass 20M pa), this stage shearing force mainly undertakes by the concrete.The second stage for bursts the stage.Gradually enlarges along with repeatedly the load, links up the crack to widen, the shearing force mainly undertakes by the concrete, stirrup achieves one after another submits, crowds garrulously in the concrete front achieves the biggest bearing capacity.When design takes the limiting condition by the second stage.3.standards leave alone and the processing request to the construction.Joint for enable the concrete structure to have a better integrity;the concrete pour should continuously carry on.If because technical or organization's reason cannot continuously carry on pours, also the middle idle time has the possibility to surpass the concrete initially to congeal, then should in front of concrete placement determine remains in the appropriate position supposes the construction joint.The construction joint was refers first irrigates the concrete to congeal the hardening, then continued the placing concrete junction plane between the new old concrete, it was the structure weak spot, thus suitably kept the structure to be smaller the shearing force also to be advantageous for the construction spot.The column should keep the water flush joint, the girder wooden fence should remain vertical joints.When starts from the construction joint place continue the concrete, after must wait the concrete compressive
strength which constructs to achieve 1.2N /m2.can carry on, moreover must make some processing to the construction joint, strengthens the new old concrete the connection, reduces the construction joint as far as possible the adverse effect which brings to the structure integrity.The treating processes are: First in hardened on the concrete surface, eliminates the cement thin film and the loose gravel as well as the weak layer of concrete, and performs fully moist, the flushing is clean, also does not have to remain has the pending;Then first spreads cement mortar in front of the concrete in the construction joint place or and in the concrete the ingredient same cement mortar;When concrete, must carefully inspire pounds densely, causes the new old concrete union to be close.4.according to the scientific research achievement union actual construction proposed the improvement construction joint processing method and the theory basis.(1)First massively test indicated continues the surface to carry on the rough treatment to be allowed obviously to enhance continues the surface caking intensity, but roughness enhances after the certain degree, continues the surface caking intensity the enhancement no longer to be obvious.With ordinary chiseling method existence obvious flaw, but uses the high-pressured water spray treatment to be allowed to obtain a better rough contact surface, and does not injury and the old concrete, but high-pressured water equipment construction cost expensive, technical content high, looked in the present stage from our country actual construction technology and the construction level, the application high pressure water treatment less quantities construction joint not too is actual.Therefore myself proposed in the pouring note under story post period of time from 11 p.m.to 1 a.m, after waits at the beginning of the concrete to congeal causes on the pillar with the artificial method the surface to present the zigzag, according to the concrete thick aggregate particle size(generally is 2 ~ 4cm), the dentil depth for sticks the surface old concrete maximum aggregate particle size 1/4 ~ 1/2;grooving the mean breadth for sticks the surface old concrete maximum aggregate particle size 1 ~ 1.5 times.This law biggest merit is advantageous for the control construction quality, causes to stick in the surface roughness to have the good uniformity.Like these both has avoided chiseling, avoids the wound and the old concrete structure, and realized has
continued the surface roughness, also was easy to control the quality specification, when continuing only used to strip the loose thick aggregate.(2)in order to reduce the pitch point area weak contact surface quantity, myself thought should separate in the pitch point area two sides girder pours(even if does not separate, because pitch point concrete intensity rank is different with the girder concrete, also can produce contact surface weak level), but the pitch point pours together with the upper formation pillar, like this enabled the pitch point area to have three to continue the surface, the pillar only has to continue the surface(to be short to continue surface), was advantageous to enhances the pillar concrete anti-to cut the ability, delayed the pillar slanting crack the appearance.Simultaneously also conforms to the earthquake resistance request strong column weak girder principle, delays time which the pillar submits.Thus causes the pitch point area same the level pillar constitution whole.(3)when leaves alone the girder construction joint should retain the diagonal 45° angle(girder under construction joint nearby pillar), like this processes the result on the one hand causes the pitch point area girder end shear not with the construction joint superposition, is advantageous to anti-cuts anti-pulls, delays the time which the concrete crack appears.On the other hand acts according to had the experimental study result to indicate that, on slanting makes up compared to declines makes up sticks the surface intensity high, the same principle on slanting makes up should make up the intensity the tradition job practice in side to be higher than.Finally, because the construction joint assumes 45° the angle, thus expanded the pitch point whole to pour the region, was advantageous to realizes the strong pitch point request.(4)has when the condition may(for instance reduce medicinal preparation using the patching contact surface medicinal preparation, had experiment and theoretical analysis indicated reduces medicinal preparation to be better than plumping agent), as a result of the economy and other reasons, in the actual project construction very little uses the contact surface medicinal preparation in the small area construction joint, present constructs from the majority looked, should consider the improvement and the control interface mortar application.According to had the experimental conclusion and the theoretical analysis, myself
suggested applies makes the contact surface medicinal preparation with the pillar water-to-cement ratio same element cement mortar.(5)acts according to myself many years construction experience, because the pitch point spot girder steel bar intersects through and stirrup the encryption, factor and so on anchor causes the pitch point spot steel bar densely, constructs with difficulty, therefore the suggestion use minor diameter vibrates the stick(for instance 50sticks)to inspire pounds the pitch point spot, like this not the easy wound and the old concrete structure, also are easy to control inspires pounds the quality, reduces as far as possible secretes the water volume, the improvement junction plane tiny view structure, is advantageous to enhancing the construction joint the caking intensity.5.conclusions and forecast
This article according to tested and the theory scientific research achievement union portal frame construction concrete girder pitch point spot construction weak area carries on the discussion, key actually embarks from the present project and the full consideration is economical and the realistic factor, proposed the pitch point spot construction joint continues processing the new method to discuss its theory basis, and already carried on the Practice in the partial projects, obtained good has continued the effect.But waits for to the massive projects practice proved its validity, simultaneously is worth further carrying on the theory and the experiment analyzes.The current related scientific research mainly from macroscopic embarks to tiny view, has initially promulgated the new old concrete caking mechanism through the experiment and the theoretical analysis, myself think not only must study the new old concrete from the theory to continue the intensity, must study from the current our country construction enterprise actual level face the project application job practice, thus applies as soon as possible the theory achievement to the practice, enhances our country to construct enterprise's overall quality, guaranteed the construction quality, better satisfies the design anticipated target.浅谈施工缝的处理
引言
通过大量工程结构震害实例, 框架结构节点普遍破坏较重,往往导致结构失效, 中外学者分析表明, 这是多方面的原因, 包括设计失误, 没有加强节点强度, 实现强节点强锚固等原因。同时施工中也存在施工质量弱点, 难于保证设计预期目标。施工中新老混凝土施工间隔期, 接续面方位, 接续面处理方法, 新老混凝土生熟配料及振捣控制质量都密切的影响着节点粘结强度, 因此在框架结构工程施工过程中,由于每一层柱子施工中必然与下层柱子存在施工缝,怎样留置施工缝, 怎样处理施工缝, 使工程质量不受影响,保证砼结构的安全性,更显得尤为重要。
1、当前框架结构梁柱节点施工方法及缺陷
(1)早期在一般的框架结构施工中, 浇注完一层柱子后, 进行支模, 模板安装完成后才进入下道工序浇注上层梁混凝土, 因此根据施工工期及人、材、机等情况, 新老混凝土接续间隔期长短不一, 在浇注时一般节点(梁柱交界处)随梁混凝土一起浇注, 并且节点混凝土强度等级按梁进行施工。
(2)随着科研的发展及施工水平的提高, 尤其是专业化水平较高的大建筑公司开始针对梁柱节点施工质量薄弱的特点采取一系列措施, 在浇注上层梁柱时用钢钎进行凿毛处理, 浇注前对老混凝土进行浇水湿润, 并用高标号水泥砂浆铺在交接面上, 梁柱节点区混凝土强度等级一般采用柱子(一般柱子强度等级高),在浇注节点区时加强振捣并严格控制水灰比。经过一系列处理措施后, 施工质量得到了提高, 但梁柱节点区混凝土仍旧是施工薄弱区, 很难取得理想的接续效果。
(3)虽然接续部位进行了处理, 但其缺陷是很明显的: 首先用钢钎进行凿毛处理, 极易伤及老混凝土, 以致老混凝土产生初始微裂缝, 严重影响新老混凝土的接续强度, 且凿毛处理难于控制处理质量标准, 浇注前对接续部位进行浇水湿润很容易适得其反, 从而增大了交接面处混凝土的水灰比, 而用高标号水泥砂浆铺在交接面上很容易由于
高标号水泥砂浆与新混凝土浆体凝结及收缩不同, 从而使接续面更容易产生初应力和初始微裂缝。而节点区混凝土强度等级区别与梁, 从而使柱梁节点区实际产生了四个界面区(虽然梁与节点区整体浇注, 但混凝土强度等级一般不同, 因而也造成了薄弱界面), 在施工时很难控制振捣密度与时间, 很容易由于振捣过深而伤及老混凝土, 或者由于加强振捣而使本来水灰比就比较小的混凝土产生局部泌水现象, 从而影响混凝土强度的增长, 降低界面粘结强度。
2、梁柱节点区破坏机理及抗震设计要求
由震害调查可见, 梁柱节点区的破坏, 大都是由于节点区无箍筋或少箍筋, 在剪压作用下混凝土出现斜裂缝甚至挤压破坏,造成纵向钢筋压屈成灯笼状。因此, 保证节点区不过早发生剪切破坏的主要措施是保证节点区混凝土的强度及密实性, 在节点区配置足够的箍筋。设计梁柱常常采用不同等级的混凝土, 施工时必须注意梁柱节点部位混凝土等级应该和柱混凝土的等级相同或略低(相差不能超过5M pa)。从而实现强节点强锚固。在竖向压力及梁端柱端弯矩, 剪力作用下, 节点区存在较复杂的应力状态。
从北京市建筑设计院等单位进行的节点实验可见, 节点的破坏过程大致可分为二个阶段: 第一阶段为通裂阶段。当作用与核心的剪力达到60~70% 时, 核心区出现贯通斜裂缝, 裂缝宽度约为0.1~0.2m m ,钢筋应力很小(不超过20M pa),这个阶段剪力主要由混凝土承担。第二阶段为破裂阶段。随着反复荷载逐渐加大, 贯通裂缝加宽, 剪力主要由混凝土承担, 箍筋陆续达到屈服,在混凝土挤碎前达到最大承载能力。设计时以第二阶段作为极限状态。
3、规范对施工缝留置及处理要求
为使混凝土结构具有较好的整体性, 混凝土的浇注应连续进行。若因技术或组织的原因不能连续进行浇注, 且中间的停歇时间有可能超过混凝土的初凝, 则应在混凝土浇注前确定在适当位置留设施工缝。施工缝就是指先浇混凝土已凝结硬化, 再继续浇注混凝土的新旧混凝土间的结合面, 它是结构的薄弱部位, 因而宜留在结构受剪力较小且便于施工的部位。柱应留水平缝, 梁板墙应留垂直缝。
当从施工缝处开始继续浇筑混凝土时, 须待已浇筑的混凝土抗压强度达到1.2N /m m ⒉后才能进行, 而且需对施工缝作一些处理, 以增强新旧混凝土的连接, 尽量降低施工缝对结构整体性带来的不利影响。处理过程是: 先在已硬化的混凝土表面上, 清除水泥薄膜和松动石子以及软弱混凝土层, 并加以充分湿润, 冲洗干净, 且不得留有积水;然后在浇筑混凝土前先在施工缝处铺一层水泥浆或与混凝土内成分相同的水泥砂浆;浇筑混凝土时, 需仔细振捣密实, 使新旧混凝土结合紧密。
4、根据科研成果结合实际施工提出改进施工缝处理方法及理论依据
(1)首先大量实验表明接续面进行粗糙处理可以明显提高接续面粘结强度, 但粗糙度提高到一定程度后, 接续面粘结强度的提高不再明显。用普通凿毛方法存在明显缺陷, 而采用高压水喷射处理可以得到较好的粗糙界面, 并且不伤及老混凝土, 但高压水设备造价昂贵, 技术含量高, 在现阶段从我国实际施工技术及施工水平来看, 应用高压水处理较少数量的施工缝不太实际。
因此本人提出在浇注下层柱子时, 待混凝土初凝后用人工方法使柱子上表面呈现锯齿状, 根据混凝土粗骨料粒径大小(一般为2~4cm), 锯齿深度为粘结面老混凝土最大骨料粒径的1/4~1/2;切槽的平均宽度为粘结面老混凝土最大骨料粒径的1~1.5 倍。此法的最大优点是便于控制施工质量,使粘结面上的粗糙度具有良好的均匀性。这样既避开了凿毛, 避免伤及老混凝土结构, 又实现了接续面的粗糙, 且容易控制质量标准, 在接续时只用剥离松动的粗骨料。
(2)为了减少节点区薄弱界面数量, 本人认为应在节点区二侧把梁断开浇注(即使不断开, 由于节点混凝土强度等级不同与梁混凝土, 也会产生界面薄弱层), 而节点连同上层柱子一起浇注, 这样使得节点区存在三个接续面, 柱子只有一个接续面(少了一个接续面), 有利于提高柱子混凝土的抗剪能力, 延缓柱子斜裂缝的出现。同时也符合抗震要求的强柱弱梁原则, 延缓柱子屈服的时间。因而使节点区同上层柱子构成整体。
(3)在留置梁施工缝时应留成斜向45°角(梁底施工缝在柱子边), 这样处理的结果一方面使节点区梁端剪力不与施工缝重合, 有利于抗剪抗拉, 延缓混凝土裂缝出
现的时间。另一方面根据已有实验研究结果表明, 斜上补比斜下补粘结面强度高, 同理斜上补应比传体浇注区域, 有利于实现强节点的要求。
(4)有条件时可以应用修补界面剂(比如减缩剂, 已有实验及理论分析表明减缩剂比膨胀剂好), 由于经济及其他原因, 实际工程施工中在小面积施工缝中很少使用界面剂, 从大多数现行施工来看, 应考虑改进并控制界面砂浆的应用。根据已有实验结论及理论分析, 本人建议应用同柱子水灰比一样的素水泥浆做界面剂。
(5)根据本人多年的施工经验, 由于节点部位梁柱钢筋交叉通过及箍筋加密, 锚固等因素使得节点部位钢筋稠密, 难以施工,因此建议使用小直径震动棒(比如50 棒)振捣节点部位, 这样不容易伤及老混凝土结构, 且容易控制振捣质量, 尽量减少泌水量,改善结合面的微细观结构, 有利于提高施工缝的粘结强度。统施工方法中的侧补强度高。最后, 由于施工缝呈45°角, 从而扩大了节点。
5、结论与展望
本文根据实验及理论科研成果结合框架结构混凝土梁柱节点部位施工薄弱区进行探讨, 重点从现行工程实际出发并充分考虑经济及现实因素, 提出了节点部位施工缝接续处理的新方法讨论其理论依据, 并且已经在部分工程中进行实践, 取得了良好的接续效果。但有待于大量工程实践证明其有效性, 同时值得进一步进行理论及实验分析。
当前有关科研主要从宏观到微细观出发, 通过实验及理论分析初步揭示了新老混凝土的粘结机理, 本人认为不仅要从理论上去研究新老混凝土的接续强度, 更要从当前我国的施工企业实际水平去研究面向工程应用的施工方法, 从而尽快把理论成果应用于实践, 提高我国施工企业的整体素质, 保证施工质量, 更好的满足设计预期目标。
第二篇:混凝土施工缝的处理
混凝土施工缝的处理
水工建筑物混凝土浇筑时,为了保证其整体性良好,每个结构构件最好一次浇筑完毕,中间不停歇。如果因构件混凝土量大,中间需要停歇,则停歇的时间应尽量缩短,应在前层混凝土凝结前将次层混凝土浇捣完毕。规范规定一般停歇时间不得超过2小时,否则,应当待混凝土抗压强度不低12千克每平方厘米时,才能继续浇捣。因为混凝土拌和物中的水和水泥经拌和后2小时开始初凝,但还不具备强度,如继续浇捣会使已浇捣好的混凝土因受震动而破坏凝结作用,所以必须待混凝土能够抵抗外来震动时,允许继续浇捣,这时两层混凝土之间就产生了施工缝。
水工建筑物的构件混凝土工作量都比较大,一次浇筑的机会不多,特别是基础与上部结构一般都分两次浇筑,即先浇筑基础混凝土,然后在基础上支模再浇筑上部结构混凝土。因模板工作量大,支模时间较长,有的长达2天。这样两次浇筑的混凝土之间就产生了施工缝,如不加处理,势必影响基础与上部结构的整体性和防渗性。因此,施工规范规定:对施工缝应认真处理。
过去对施工缝的处理,都采取人工凿毛、刷毛、冲毛、高压水枪冲刷等办法。这些办法都行之有效,但是冲毛的时间随气温而异,春秋季节,在浇筑完毕后10~16小时开始;夏季掌握在6~10小时;冬季则在18~24小时后进行。如果时间掌握得不好,过早会使混凝土表面松散或冲击表层混凝土;过迟则混凝土已硬化,不仅增加工作难度,而且不能保证质量,也加大了凿毛、排清和清洗的工作量,影响施工进度。
在多年的施工实践中,工程技术人员总结出用“栽石法”处理施工缝。具体做法是:当基础混凝土浇捣完之后,应立即在基础与上部墙接触面的部位,将事先洗好浇筑混凝土用的碎石子栽到已浇捣好的混凝土里面,石子栽深为碎石子直径的2/3左右,栽石面积约占接触面的2/3以上。等待混凝土终凝后(夏季一般在14~20小时),用铁钩钩去栽石缝之间混凝土表面的乳皮,使其露出沙粒。在支模板之前,将其冲洗干净,在浇筑上层混凝土时,先铺一层2~3厘米与混凝土同号的水泥砂浆,以利于上下层新老混凝土之间黏结,保证构件的整体性和防渗性。
用“栽石法”处理施工缝,一个人只用10多分钟就能栽完10多平方米的面积。在几个施工工地推广,很受施工单位的欢迎。
“栽石法”处理混凝土施工缝,简单易行,既省工、省料,又不破坏混凝土结构,又有利于新老混凝土的胶结质量,是保证构造物整体性良好的有效措施。
第三篇:地下室分期施工缝处理方案
盐城市盐都新城商务中心(地下人防)车库工程
一期区域的划分以及分期部位处理方案
一、工程概况
盐都新城商务中心工程位于盐城市盐都区南纬路以北,文明路以东,建设单位:江苏月恒置业有限公司;设计单位:江苏铭城建筑设计院有限公司;勘察单位:江苏省鸿洋岩土勘察设计有限公司;监理单位:盐城市亨达建设监理咨询有限责任公司;施工单位:深圳市建设(集团)有限公司。
本工程功能:平时为地下汽车停车库,战时为甲类核(常)6级二等人员掩蔽所,基础类型:预应力混凝土抗拔空心方桩,承台筏板基础。
一期区域的确定:
1、F轴以北,依17轴~18轴南北向后浇带为界限,其中考虑到2#楼西侧门厅雨棚施工,V~Y—4/15~17不按施工后浇带划分,西侧施工至16轴西3.0米,北侧施工至Y—3北3.0米;
2、F轴以南,依18轴~19轴南北向后浇带为界限;
二、封堵原因及范围
由于盐都新城商务中心工程二期工程开工时间未定,为防止雨水、粘土等从分期区域缺口进入或渗入地下室,造成地下室机房、电房以及重大设备等受到损害,为确保一期地下室工程竣工验收后满足使用功能,所以必须在一期分期范围处采取临时封堵措施,封堵长度约为154米,具体封堵位置见附图。
三、编制依据
1、地下室施工图
2、砌体结构工程施工质量验收规范
3、混凝土结构工程施工质量验收规范
4、地下室工程防水技术规范
四、封堵工艺流程
清理基层——放线——构造柱腰梁植筋——浇筑素混凝土反梁——构造柱钢筋绑扎——腰梁下砌体砌筑——腰梁钢筋、模板、混凝土施工——腰梁上砌体砌筑——砌体顶部顶砖砌筑——砌体内外侧抹灰(外侧抹灰为防水砂浆)——砌体外侧4mm厚改性沥青防水卷材粘贴——108胶水加水泥、砂甩浆拉毛——固定纤维网——1:3水泥砂浆防水保护层
五、分期及封堵施工
(一)、主体结构施工:
1、一期西侧开挖及护坡施工方案参见基坑支护方案图纸2—2做法;
2、将该区域东西方向框梁、板、墙钢筋预留伸至二期的规范搭接区,具体要求参见11G101—1及11G101—3,(以便二期施工钢筋连接符合规范要求);
3、该区域所有施工缝处均采用止水钢板止水措施,并焊接钢板网隔断新旧混凝土施工,后浇带做法参见图纸会审记录第四条;
4、所有施工必须符合相关的规范要求。
底板防水施工均跨过后浇带1米(方便二期施工搭接处理),封堵隔墙外侧防水按车库外墙正常做法施工。
(二)、封堵墙体施工(采用M10水泥砂浆,砌块强度等级为MU10,墙厚370【-6.200~-4.200】及240【-4.200~-2.500】,墙皮西口与顶板框架梁西口重合,在每跨堵墙内构造柱两侧中间位置各设置一道八字墙支撑,见附图):
1、施工前将基础结构面清刷干净,依据封堵砌体位置放出砌体的轴线,边线及控制线;
2、按照墙体砌筑线植筋,每500mm间距设置一道拉接筋,370墙每道3根6,240墙每道2高混凝土反梁;
3、按照墙体轴线及边线排砖,采用三一法砌砖法砌筑;
4、砌体水平及垂直灰缝均为10mm,不应小于8 mm,不得大于12 mm;
5、砌砖上下错缝搭砌,搭砌长度为60 mm,如遇搭砌错缝长度无法满足规定的搭接要求,根据砌体构造设计规定采取压砌钢筋网片的措施;
6、墙体长度超过5米时,在中间位置均设置构造柱(墙厚×240,6
12,6,长度1米,植筋采用环氧树脂,安装模板浇筑2006@200)墙高度超过4米时,要设置圈梁(墙厚×240,412,6@200),采用C25混凝土浇筑,所有主筋都要植入梁或柱内,植筋施工要符合《混凝土结构加固技术规范》《混凝土结构后锚固技术规程》的要求,构造柱处砌体应留置马牙槎,留置原则应先退后进(退、进尺寸为60mm);
7、根据皮数杆拉线控制砌体标高,并在砌筑过程中随时检查墙面平整度,垂直度,砌筑一皮,校正一皮;
8、砌体砌至梁底130mm处,该部分空隙待本层砌体沉降、变形趋于稳定不少于7天,用45×110×190专用斜砖斜砌挤紧,其砂浆饱满度不小于90%;
(三)、墙体内外侧抹灰施工(采用1:3水泥砂浆,含外侧面防水层)
1、墙面甩毛处理(采用水泥、砂、108胶水配置而成)
2、根据控制线贴饼、冲筋;
3、墙面1:3水泥砂浆刮糙(外墙面使用防水水泥砂浆)
4、墙面1:3水泥砂浆抹面压实抹光(外墙面使用防水水泥砂浆,20mm厚)
5、墙柱交界处阴角抹成半径为50mm的圆弧角。
(四)、墙体外侧防水施工
1、待墙体抹灰层完全达到强度,且含水率满足防水施工要求后,先涂刷冷底子油一道,铺贴4mm厚改性沥青防水卷材,底部防水层做平至构造板底部,上部至顶板处,并采取固定措施,固定件、上口及下口等细部要做加强层,进行特别处理,在防水面层铺贴加强网,保证防水保护层粘贴牢固,防水保护层采用1:3防水水泥砂浆抹面保护。
(五)、考虑到盐城地区雨季持续时间长,雨量大的特点,为避免雨水倒灌以及地下水浸入地下室,须在一期分界的适当位置,顶部和底部分别设置排水沟,顶部和底部集水井共用,在集水坑内设置自动抽水系统,当水位达到一定高度时,自动启动抽水设备,将水抽至顶部集水坑,顶部集水坑的水经过三级沉淀池后排入市政管网。
排水沟与集水井土方开挖至标高(见附图)清理浮土完成,浇筑100厚C15混凝土垫层,在施工前将垫层面清刷干净,测放出砌体的轴线、边线及控制线,按照墙体轴线及边线排砖,采用三一砌砖法砌筑,砌体水平及垂直灰缝均为10mm,不应小于8 mm,不得大于12 mm,砌砖上下错缝搭砌,搭砌长度为60 mm,集水井、排水沟内壁采用1:3水泥砂浆抹灰,排水沟尺寸为400×400,壁厚为200,集水井尺寸800×800×800,壁厚为200,每30米设一个。
六、附图
1、分期位置图
2、一期分期封堵节点大样图
第四篇:土木工程 英文翻译(中文)
成本和进度计划控制集成:问题和需要
摘要:成本控制和进度控制是建筑行业中最重要的两个管理功能,主要研究工作主要集中在制定程序,提高成本和进度控制的有效性。因此,通过这种控制系统流能够得出研究人员所关注的质量,完整性和及时性数据。一个数据模型提出了一些整合的成本和进度控制功能,因为这种一体化能够解决今天建设项目所面临的很多问题。本文提供了成本和进度控制功能的概述,定义了所需的控制循环,并讨论成本和进度控制功能的问题和需要。一个综合的成本和进度控制数据模型的数量,在这方面的建设研究现状进行了讨论。对工作包装模型进行了简要介绍,并作为是最有可能的现有模式,达到预期的成本和进度集成。最后,为控制基础上的关系数据模型概念提供基础、概念设计,建议设计采用的工作包装模式的概念结构。
引言
在施工过程中的首要目标是完成项目按时在预算范围内,同时满足既定的质量要求和其他规格。要做到这一点需要大量的重点在施工过程管理。然而,施工管理过程是没有计划和控制系统不可能(“项目控制”1987年)。计划规定了一个项目的进度,成本目标和资源使用,以及任务和开展工作的方法。该计划通常是基地基础上发展的历史数据以及过去的经验类似的项目。另一方面,控制系统收集实际数据(反馈)对项目的进度,成本和资源的使用;比较现有的进度,计划时间表(分析)突出潜力需要特别注意的问题领域,并就分析的基础上作出决定的结果。为了支持建设过程管理有效,综合成本控制和进度控制的功能是用来收集质量及时提供优质的数据和历史数据为依据未来规划的新项目。
一个建设项目都聘请了一些成本和进度控制方法。尽管如此,许多项目受到控制不力,由于信息流通效率不高。这种低效率是建设管理的基本问题。具体来说,在控制系统中流动的信息质量问题的(克拉特1989年)的精髓。发现有问题的项目都在他们自己建造时间和历史的企业基础数据。此问题的解决方案强加两个挑战:整合成本和进度控制功能,以及控制数据质量,完整性和及时性。
至于第一个挑战,建设项目的时间表和成本之间呈现复杂的关系。虽然进度和成本之间的相互依赖性是显而易见的,它是罕见的工程控制系统,整合成本和进度控制功能(亨德里克森和金1989)。相反,他们仍然是两个相互独立地进行,而单独使用两种不同的控制功能结构:工作分解结构(WBS)和成本分解结构(CBS)。两种职能的整合困难在于每个功能的详细使用水平,而不是所需的详细程度。成本控制功能,由哥伦比亚广播公司表示,在执行的进度比控制功能的WBS的代表,少细分层次。这对每个函数使用的详细程度不同造成在成本和进度的数据保持方式的根本区别。每个数据的收集成为独立于其他的分别是维持。项目经理必须涉及的信息,然后从两个来源,从而降低了效率来获得有意义的信息。
至于第二个挑战,建设数据,这被收购采用不同的形式多种多样,很难以控制由于时间有限,无论是犯此任务或低效人工收集方法。但是,控制数据是非常
重要的控制功能的任何成功。如果错误数据进入系统,分析,报告和对这些数据进行决策是没有意义的。因此,提高质量,完整性和及时性数据的建设是一个公认的需要。
因此,要达到预期的整合,成本和时间数据必须获得和既定的共同点控制定义在一个足够详细的帐户维持。但是,它是不够的建立和保持一个共同的分母。一个自动化的方法,也需要获取和存储数据,支持这一概念,并详细程度。换句话说,有一个计算的数据采集和存储模式,支持综合成本和进度控制的概念,并提供及时的高质量数据的需要。
以往费用与进度集成的工作
研究人员正在试图找到一种综合的方式,开发数据的代表性模式,推动了一体化的执行成本和进度控制功能更好的办法。一个模型是需要真正能够整合成本和进度控制功能,而获取,存储,并提出及时的数据和信息。研究工作的记录数可以举出处理这一问题。下面的小节描述和讨论有关的一体化模式的研究发现。Teicholz模型
Teicholz(1987)中确认的详细程度的分歧CBS和现有的WBS。图1说明Teicholz对在哥伦比亚广播公司之间的差异和观念的WBS分解。在图中,一个记录的“带任务的成本数据帐户的8英寸墙在CBS的”对应的WBS的许多任务,包括“地带的8英寸(20厘米)墙面积甲”和其他类似任务的地区B和地板4℃。
Teicholz建议之间的CBS和WBS的映射机制。该机制允许一个给定的成本之间的帐户和一个或多个活动(任务)中有关该帐户的映射。这种映射机制的方式运作,主要是由百分之分配,其中一个具体的百分比费用帐户,指定一个给定的资源,如劳动时间和物质的数量以成本帐户)(在应分配给CBS的数量概念对WBS的既定任务
Teicholz的模式并不试图解决在实现预期的整合,即详细程度困难的根本原因。他利用在成本和进度控制电流的方法来建立一个便捷的解决办法(映射机制)来解决问题。他的百分之分配的概念是近似和判断。Teicholz确定了本应慎重考虑在实施他的模型的方法限制。具体说,在成本方面,成为信息的详细程度,成本帐户中的同步计划功能可能存在的联系没有剩余未完成的活动的费用。此同步问题存在,因为有两个不同意见,数据和没有试图整合这些意见身体。此外,维持与成本和进度控制的帐户之间的联系带来了额外的计算开销,可能影响的有效性和效率的数据处理和报告。
亨德里克森模型
亨德里克森和Au(1989)建议使用的集成工作元素的概念。该模型是通过从一个三维工作元素尼尔提出的定义(1983年)。一项工作的内容是控制帐户中定义的工作包矩阵从WBS和美国哥伦比亚广播公司从成本帐目,在此模型中,一个工作元素之间提供了一个WBS和哥伦比亚广播公司,其中一成本的帐户可能涉及一个或多个活动环节,在同一时间的活动可能涉及到一个或多个帐户的费用。再
次使用这种关系作为共同的分母是达到了预期的整合工作内容。因此,问题发生在一个特定的活动,可以很容易地分离,因为成本和与活动相关的性能数据是在同一水平积累分类分析。显然,这将会提高项目控制。
亨德里克森和Au(1989年)认识到,为获取和保持有效的项目控制数据的共同标准的需要。他们也承认,这一模式的成功,是发展更好的自动化数据采集和因为负担代表性的数据收集和储存方法队伍。此外,该模型还设有两个项目数据(CBS和工作分解结构),即使它们被用于数据收集和工作内容与储存的目的不同的看法。保持两个独立的意见,增加了项目的数据,在总结为成本控制和进度控制功能,即数据所涉及的开销,它创建一个额外的计算开销。
布斯和金的模型
布斯和金(金1989)正在开发完善建设项目的规划和控制使用面向对象编程(OOP)方法的计算机数据模型。他们提出的数据模型集成的企图,不仅建设成本和进度控制的数据。它依靠所谓的基础设施建设行动,一个设计对象(生化需氧量)需要在一个新元素的发展。在董事会被定义为最低级建设需要建立一个特定设计对象的任务。因此,董事会是一个实体,它提供了连接机制设计对象及其相应的施工操作控制功能(WBS和哥伦比亚广播公司)。
一个董事会有三个方面:对工作分解结构,工作包的成本帐在CBS,和设计对象上绘图。例如,以下5欠压检测器可以生成一个8英寸(20厘米)混凝土墙对象A区四楼:“编造模板”,“竖立模板”,“地方筋“,”倒混凝土“和”地带的模板。“每一个董事会,然后联系考虑到一个成本在CBS和一个工作包上的WBS。有关成本帐户可能包括“劳动成本为8英寸墙模板制作,”“劳动成本为8英寸墙模板竖立”,“劳动成本为8英寸墙模板剥“等材料和劳动力成本把筋与混凝土浇筑。有关工作包可能包括“模板8项。墙面积的A-4楼“,”钢筋工作8项。墙面积的A-4楼“和”具体工作的8项。工作8项。墙上的A区三楼4。
虽然这种模式解决了通过发展相结合的存储和操作机制,采用面向对象方法的成本和进度控制数据的代表性方面,它也忽视数据采集的支持。此外,每个生化需氧量是指在这样一个精致的水平,它可能无法取得数据,以支持该模型。事实上,一个可能达到的水平,详情时,根据需要开发数据处理模式,但它的效用是有限的困难,因为收购需要支持的数据模型。此外,该模型仍保持双WBS和哥伦比亚广播公司的意见,这带来了额外的计算开销。
工作包装模型
工作包装模型,我们认为是最有可能达到预期的成本和进度的整合,并在同一时间解决数据如前面所述有关的问题。它是由美国国家航空和航天局(NASA)和国防部(DOD)在航天部和国防工程产业。它分解成易于管理的工作包已经工作范围。关于工作的包装模型的最低水平表示将在该项目的活动网络使用的实际任务。
在此模型中,基于活动的成本控制的概念已被使用,这已为提高项目控制(莫
德等人的可能方式确认。1983年)。建议使用的概念作为一个网络控制的帐户活动的每项活动都针对的成本和时间数据获取和积累。由于簿记负担和控制活动网络不可行,以活动为基础的控制并没有被广泛接受,并已被修改。修改后的模型上使用的控制,其中一包可能存在比实际活动水平的基础上更高层次的WBS工作包。此修改后的模型称为成本/进度控制系统准则按工作包装模型用于执行综合成本和进度控制的WBS。
工作包装模式造就成本数据加入到WBS和消除哥伦比亚广播公司的一个项目数据的统一视图。该模型实现了一个层次结构中的共同点为获取和保持有效的项目控制数据的需要。这说明了基于活动或工作包的成本控制的模型引入的概念。这个共同点是认为是一项重要的贡献,真正实现一体化。
虽然工作的包装模式解决了数据处理和任职综合成本和进度控制方面,它忽略了数据采集阶段。对需要在一个详细的数据量非常大,问题和阻力模型发生(莫德等人,1983年)。
模型评估
总之,研究人员已经确认,并强烈表示的整合需要的成本和进度控制功能,并已开发模式,试图提供所需的集成。他们认为,更好地实现一体化是建立在共同的分母。他们的模型,定义连接的共同点之间的WBS和CBS的机制,但仍保持两种意见。然而,工作包装模式是唯一一个真正实现提供一个统一的看法一体化项目成本和进度控制数据定义使用一个共同点结构,工作分解结构。此外,从而消除了连接模型所需要的其他机制,创造了一个计算成本和进度控制廉价的数据处理环境。这一点尤其是当与复杂性和所需的额外的努力相比保持与CBS和其他型号的WBS的联系。此外,在工作包装模型支持自动化需要较少的开发工作,并可能确实是更有效地执行了上述原因。这些事实大大促进了自动化的成本和进度控制系统的效率提高,从而有助于及时报告制度。
另一个问题是,在大多数的数据采集任务被忽略模型。然而,数据采集在一个综合的方式,通过一个集成的数据存储模型的支持,被认为是一项重要的任务,这种模式的成功,大多数情况下它队伍。虽然这个文件的综合成本和进度控制数据存储方面的重点,它提供了数据采集简短的讨论。
因此,工作包装模型建议作为一个强有力的集成模型的候选人。但是,仍然存在一些局限性,特别是关于数据存储和数据采集的自动化支持能力。工作包装模型
这项工作的包装模式的发展是为了创造一个项目数据具体时间和成本数据进行分析和决策过程的统一视图,更容易执行。这种观点强加在规划和预算编制理念和新的方法来确定和改变使用控制帐户。这些需求和问题逐一加以讨论以下,还有一个描述测量工作进度。
规划和预算编制
大中型建设项目往往涉及成千上万的行动。WBS的有效地抓住了这些行动的细节。
另一个分解结构也承认工作包装模式:承包商的组织分解结构,这种结构的组织职责分配到每个控件的帐户上所期望的详细的WBS级别。
在工作规划和包装方面的预算是指所有认可工作的调度和分配预算管理的单位工作(控制帐户)(“成本及附表”1980年)。工作包装模型需要使用早期的WBS在项目生命周期。这意味着这项工作必须安排在与WBS的规定,预算和资源(材料,劳动力和设备)的消耗和成本,必须对每个WBS的定义控制帐户的准备。然后,顺序控制的帐户之间的逻辑关系建立,使每一个控制帐户的活动网络活动。每个控制帐户,然后变成了控制数据,描述在它涉及的工作保存。因此,由于在规划和预算编制理念上的变化和成本和进度控制功能,因为集成需求,是一个统一的数据组织强加给每个帐户。这样的组织必须提供每个控制帐户如下:1的工作范围,代号,计划的开始和结束日期,为资源消耗,实际开始和结束日期的预算,和实际的资源消耗。
然后识别系统是一个需要支持的工作包装模型。它的设计必须提供一种简单的处理机制,为每个工作包。这意味着,一个编码方案必须能够识别的进程和建设项目的所有资源。因此,为了能够满足需要的解决机制,需要在六个组成部分的编码方案:一个WBS,一个开放式保税仓,一种资源,一个工人的身份,活动网络识别和任务编码方案。这些组件通常是发达国家和规范公司内部。测量工作进展情况
测量工作包装方面的工作进展可以通过多种方式,与估计的进度(百分比完全控制每一个帐户),然后汇总这些值来得出一个项目的进展情况总体估计的目标。方法工作进展,积累和参考文献描述(“项目控制”1987年;里格斯1987;成本及附表“1980年)。一种方法用于测量工作进度控制的帐户中使用一个完成单位。这种方法适用于控制帐户有工作单位很容易衡量的。一个例子是在混凝土楼板浇筑量可以作为衡量单位工作的具体。百分之一的控制帐户完全估计,预算总额除以单位完成的实际单位。一旦百分比为每个控件帐户完全估计,整个项目的完成百分比可以计算。该项目预计完成百分比使用挣值方法,其中一挣值计算为每个控件的帐户,并与其他获得价值结合起来。个人所赚取乘以该帐户,其中一个可以控制的帐户预算的美元价值和预算的完成百分比计算值/或工作时间。因此,在所有控制帐户的进展可以归结为赚取美元或工作时间,从而提供一个在所有帐户相结合的进展情况来计算该项目的完成百分比机制。
第五篇:板缝处理
板缝处理
1、加气混凝土隔板之间板缝在填缝前应用毛刷蘸水湿润,填缝时应由两人在板的两侧同时
把缝填实。填缝材料采用石膏或膨账水泥。
2、预制钢筋混凝土隔墙板高度以按房间高度净空尺寸预留25MM空隙为宜,与结构墙体间
每边预留10MM,空隙为宜。勾缝砂浆用1:2水泥砂浆,按用水量20%掺入108胶。勾缝砂浆应分层捻实,勾严抹平。
3、GRC空心混凝土墙板之间贴玻璃纤维网格条,第一层采用60MM,宽的玻璃纤维网格条
贴缝,待胶粘剂稍干后,再贴第二层玻璃纤维网格条,第二为150MM。
4、轻质陶粒混凝土隔墙板缝、阴阳转角和门窗框边缝用1号水泥胶粘剂贴玻纤布条(板缝、门窗框边缝粘贴50-60MM宽玻纤皮条,阴阳转角处粘贴200MM宽玻纤布条)。光面板隔墙基面全部用3MM厚石膏腻子分两遍刮平,麻面墙隔墙基面用10MM厚1:3水泥浆找平压光。
5、增强水泥条板隔墙板缝、墙面阴阳转角和门窗框处用1号水泥胶粘剂粘贴玻纤布条,板
缝用50-60MM宽的玻纤布条,阴阳转角用200MM宽布条。然后用石膏腻子分两遍刮平,总厚控制3MM。
纸面石膏板与龙骨固定,应从一块板的中间向板的四边进行固定,不得多点同时作业。瓷砖面层工艺流程
基底处理-放线-浸砖-铺设结合层砂浆-铺砖-养护-勾缝-检查验收。
竹、木面层工艺
基层处理-安装木格栅-铺毛地板-铺设竹木地板-刨平麻光。
铺竹、木地板:从墙的一边开始铺钉企口地板,靠墙的一块板应离开墙面10MM左右,以后逐块排紧。
地毯面层
基底处理-放线-地毯翦裁-钉倒刺板条-铺衬垫-铺设地毯-细部收口。
幕墙节能工程除按一般建筑幕墙要求进行复验的材料外,还应增加对下列材料的性能进行复验:保温材料的导热系数、密度;幕墙玻璃的可见光透射比、传热系数、遮阳系数、中空玻璃露点;隔热型材的抗拉强度、抗剪强度。
桩的入土深度的控制,对于承受轴向荷载的摩擦桩,以标高为主,贯入度作为参考;端承桩是以贯入度为主,以标高为参考。饰面砖室内花岗石、粘贴用水泥、外墙陶瓷面砖应进行复验。