中央空调安装调试难点分析及处理措施中英文对照..

时间:2019-05-14 14:37:58下载本文作者:会员上传
简介:写写帮文库小编为你整理了多篇相关的《中央空调安装调试难点分析及处理措施中英文对照..》,但愿对你工作学习有帮助,当然你在写写帮文库还可以找到更多《中央空调安装调试难点分析及处理措施中英文对照..》。

第一篇:中央空调安装调试难点分析及处理措施中英文对照..

中央空调安装调试难点分析及处理措施中英文对照

Analysis and treatment measures of difficult installation of central air-conditioning engineering

随着经济建设的不断发展和人们生活水平的不断提高,中央空调系统已经成为大型建筑和办公环境不可缺少的重要设施。中央空调的效果如何?能否满足所需?除设计和施工外,关键的一环,在于安装调试工作的质量,它将直接影响空气调节的使用效果。本文就中央空调工程安装调试过程中的难点进行分析,并根据问题原因提出一些处理措施,以便进一步提高中央空调工程安装调试质量,发挥中央空调应有的效能。

With the development of economy and the improvement of people's living standard, the central air-conditioning system has become an indispensable important facilities of large buildings and office environment.How the central air conditioning effect? To meet the need? In addition to the design and construction, key ring, lies in the installation and debugging work quality, it will directly affect the air-conditioning effect.Difficulties in central air-conditioning engineering installation process are analyzed, and puts forward some measures according to the problems, in order to further improve the quality of installation of central air-conditioning engineering, play a central air conditioning effectiveness.1.空调系统结露

空调系统在运行中发生结露,导致出现风管及吊架结露、风口滴水、天花滴水、墙面渗水发霉、墙面涂料脱落等现象,虽然不会造成太大的事故,但已经影响到了观感和使用功能,给用户使用和大楼物业管理带来许多不便,并造成了一定的经济损失。其原因为保冷施工不规范,保冷层厚度不达标,保冷措施未发挥作用等等。因此,保温保冷的施工应聘请技术过硬的施工队进行施工。air conditioning system of dew condensation in the operation of the air conditioning system, led to the emergence of wind pipe and outlet water, condensation, hanger ceiling dripping, wall seepage moldy, wall paint off phenomenon, although not cause too much of the accident, but has affected the perception and use function, the use and the building property management to bring a lot of inconvenience, and caused a certain economic loss.The reason for the cold non-standard construction, cold layer thickness is not standard, cold measures does not play a role.Therefore, construction of thermal insulation cold for the construction team please skilled construction.1.1风管的处理:目前中央空调风管主要有无机材料复合风管和镀锌铁皮风管两种。无 1 http://www.xiexiebang.com/ 机材料复合风管由两层高轻度无机材料夹一层保温材料复合而成,具有质量轻、不燃烧、造价低,成品板材现场切割制作、安装比较方便等特点,保温层一般为2cm厚聚苯烯泡沫。由于材料结构比较合理,一般很少出现结露现象,施工前应重点检查板材有无剥壳、胀板变形等情况。

1.1 wind pipe processing: the central air-conditioning duct mainly inorganic material composite wind pipe and galvanized iron duct two.The inorganic material composite wind pipe consists of two floors with mild inorganic material with a composite layer of insulation material, has the advantages of light weight, not burning, low cost, finished plate making, field cutting installation more convenient, the insulation layer is generally 2cm thick polystyrene foam.Because the material structure more reasonable, rarely dewing phenomenon, should focus on examination of sheet has no peeling, bilge plate deformation before construction.1.2空调水管道的处理:空调水管道温度低,出现结露的概率比较大,需要重点处理。施工时需严格控制供、回水及冷凝水管道和其他管道、风道、梁、柱、墙体之间的距离,常规距离控制在15cm以上,以便于保温工程的施工及确保保温质量,对于管道与支、吊架接触部位,正常情况下需增加木瓦管托,如无条件,也可以局部裹贴橡塑发泡板,再用卡箍收紧。同时需要注意各条管线应单独进行绝热施工。

1.2 air conditioning water pipeline: air conditioning water pipe temperature is low, there is condensation probability is big, need to focus on treatment.When construction should strictly control the supply, between water and condensate water pipeline and other pipelines, ducts, beam, column, wall distance, normal distance control in 15cm above, in order to facilitate heat preservation project construction and ensure that the insulation quality, for the pipeline and branch, hanger contact site, under normal circumstances should increase shingles pipe support, such as no conditions, can also partially coated rubber and foam board, and then tighten the clamp.At the same time the need to pay attention to each line should be insulated construction alone.1.3死角部位的处理:风道、水管紧贴梁底、墙边及穿墙的部位也是保温施工的关键部位,如正常施工有困难,可以先在这些部位做好简易模具,再采用局部聚氨酯发泡填充,在风道、水管与障碍物接触周边表面形成保温层,以此隔离死角部位与空气的接触。1.3 corner parts of the key parts of air duct, water pipe: close to the bottom of beam, wall and wall part is insulation construction, such as the normal construction difficulty, can be the first to die in these parts, and local polyurethane foam filling, in the air duct, water pipe and the barrier is http://www.xiexiebang.com/ http://www.xiexiebang.com/ formed on the surface of the contact perimeter insulation layer, in order to isolate dead parts and air contact.1.4送风口的处理:一般而言,相对封闭或面积较小的房间及走道的送风口出现结露的可能性较大,梅雨季节尤为明显,分析原因主要有以下几点。

Treatment of 1.4 inlets: Generally speaking, the room and corridor relatively closed or smaller outlet dewing possibility is larger, the rainy season is particularly evident, analysis the main causes are as follows.①空调区域内的空气相对湿度大:夏季,特别在梅雨季节或者雷雨天,空气相对湿度大,水蒸气多,空调送风口很容易产生结露现象。

The air conditioning area the air relative humidity: summer, especially in rainy season or thunderstorm days, air relative humidity, water vapor, the air outlet is easy to produce condensation.②空调送风温差大:在某些时段,冷水温度比较低,而风机送风量又偏小,引起送风温差偏大,从而出现结露现象。这时可以适当手动调小风机盘管末端进水阀开度,加大风机送风量,从而减小送风温差。

The air temperature: at certain hours, cold water temperature is relatively low, and the fan air volume is small, cause the supply air temperature difference is too large, resulting in condensation.At this time can be manually adjustable small fan coil end inlet valve opening, increase the fan air flow, thereby reducing the supply air temperature difference.③送风口为铝合金材质:目前空调风口大部分采用铝合金材料制作,由于是金属表面,结露会比较严重。在购置风口时应注意:a)委托生产厂家在铝合金表面进行喷塑处理,降低风口表面温度;b)在风口法兰边后侧敷贴PE保温条,减少气流与风口的换热。由于空调送风量大、温差小,送风口出现结露现象的概率比较小。

The air outlet for aluminum alloy material: the current air conditioning most of the use of aluminum alloy materials, due to the metal surface, condensation will be more serious.Should pay attention to in the purchase of air: a)commissioned by the manufacturers to spray on the surface of aluminum alloy tuyere, reduce surface temperature;b)PE insulation strip attached to the outlet flange back side dressing, reduce the heat flow and air.Because the air volume large, small temperature difference, the probability of outlet condensation is relatively small.2.空调器噪声大、有振动 http://www.xiexiebang.com/ The 2 air conditioner noise, vibration 集中空调末端设备一般有组合式空调机组、柜式变风量空调器及风机盘管3种。风机盘管体积较小,出现问题的概率小;组合式空调机组、柜式变风量空调器由于体积大,机械设备功率大,出现问题的概率较大,需要逐步排查。

Central air-conditioning end equipment generally have a cabinet type air conditioner sets, VAV air conditioning and fan coil unit 3.Fan coil has the advantages of small volume, small probability of occurrence problem;cabinet combined type air conditioning units, VAV air conditioner due to large volume, mechanical equipment power, the greater the probability problem, need to gradually investigation.2.1检查设备内部:系统调试前,按规定必须进行单机试运转,检查项目包括:空调器内部有无施工残留物,减振器或垫块是否安装到位,底脚螺栓和相关紧固件是否拧紧,风机叶轮是否摩擦蜗壳,轴承是否有润滑油,电动机皮带松紧如何等等,以保证设备自身有良好的运行条件。

2.1 internal inspection equipment: before debugging, stand-alone commissioning required by the regulations, inspection items include: the air conditioner has no construction residues, shock absorber or block is installed in place, the foot bolt and the associated fastener is tightened, the fan impeller friction worm shell, bearing for lubrication, the motor belt.How to wait, to ensure that the equipment has good operating conditions.2.2检查所有与空调器连接的部位是否有软接头:空调水管与空调器连接必须采用可曲挠法兰橡胶软接头。风管与空调器连接部位需安装静压箱,静压箱的主要作用有两点:①降低送、回风气流噪声;②合理混合并分配气流。静压箱与空调的连接可以用铝箔复合通风软管,也可以用三防帆布软接头。

2.2 check all parts connected with the air conditioner is a soft joint: air conditioning pipe and air conditioner connecting must adopt flexible flange soft rubber joints.The wind pipe and air conditioner connecting parts need to install static pressure box, there are two main effect of static pressure box: to reduce send, return air noise;the reasonable mixing and gas distribution.Connected static pressure box and air conditioning can use aluminum foil composite ventilation hose, can also use three canvas soft joint.2.3检查吊杆是否加装减振垫块或弹簧减振器:对于风量小的吊顶空调器,由于电动机功率小、振动小,可以在机组基础与设备吊架横托之间加装减振橡胶板垫块;风量大的空调 http://www.xiexiebang.com/ http://www.xiexiebang.com/ 器可以在设备吊杆上加装弹簧减振器,弹簧减振器的选用标准为:设备总质量÷吊杆数量(一般为4根)×(1.3~1.5)(系数),因此在吊装前需详细了解设备质量,否则,弹簧减振器选用偏大会影响减振效果。

Check whether the installation of 2.3 hangers damping pad or spring shock absorber for ceiling air conditioner air: small, because the motor power is small, small vibration, damping rubber pad block can be installed between the base unit and device hanger transverse support;air conditioning air volume can be added on the lifting rod spring shock absorber, selection criteria spring shock absorber for: the number of equipment quality / boom(usually 4)×(1.3 ~ 1.5)(coefficient), so we need a detailed understanding of the quality of equipment, before installation otherwise, spring and damper selection bias will affect the damping effect.2.4检查设备吊架上是否接有其他用途:在空调器吊装结束后,应在其底部独立增加角铁或方管等横担形成网架,以作为其他用途吊筋的悬挂支撑,网架的主吊筋固定在空调器周边,并与空调器保持一定距离,以便空调器检修。

2.4 check the equipment on the hanger is connected with other uses: in the air conditioner installation ends, should be independent of an increase in its bottom angle or square cross arm form grid, as other uses hanger hanging the support frame, main hanger is fixed on the air conditioner, and keeps a certain distance with the air conditioner, so that air conditioning maintenance.3.局部区域空调效果差

系统调试时出现的局部区域空调效果差的现象,可以从以下几个方面来排查并处理。

Local air conditioning effect of air-conditioning effect of 3 local area differential system debugging when the poor phenomenon, can from the following several aspects to the investigation and treatment.3.1检查空调器过滤网是否脏

在施工中,由于施工环境比较脏,灰尘很容易进入设备内部,设备运行一定时间后,过滤网会发生堵塞,造成空调器进风受堵,送风量偏低。3.1 check the air conditioner filter is dirty in the construction, due to relatively dirty construction environment, dust can easily enter the inside of the device, equipment operation after a certain period of time, the filter blockage can occur, caused by blocking the air conditioner air inlet, air flow is low.3.2检查风阀是否完全开启 http://www.xiexiebang.com/ 3.2 check valve is fully open

风管安装过程中,由于施工人员不重视或者防火阀联动调试等原因,送、回风道主风阀未及时开启或全部打开,造成空调器送风受堵、风量偏低。

The wind pipe installation process, due to construction workers do not pay attention to or fire valve linkage debugging, send, return air main air valve fails to open or fully opened, resulting in air by blocking the air conditioner, low.3.3检查有无异物堵塞表冷器

3.3 check whether the foreign body blocking the surface cooler

按规范要求,空调冷水管道与设备连接前都需进行冲洗,实际情况中,由于管线比较长、弯头比较多,或者受现场条件限制以及有些施工人员职业素质不高等原因,造成管道冲洗不干净,管道内残渣较多,最终堵塞空调表冷器的进口,影响水和空气的换热。

According to the specification, chilled water piping and equipment are required to wash before connection, in the actual situation, because the pipeline is long, bend more, or restricted site condition and some construction personnel occupation quality is not high, resulting in pipeline cleaning not clean, residue in the final jam more pipes, air import table cold, the heat transfer effects of water and air.如果表冷器前管道上装有过滤器,要及时拆卸清理,如没有安装,需拆卸与机组连接的软接头,清理表冷器进口。

If the table cooler of the pipeline is provided with a filter, to removing cleaning, if not installed, soft connector dismounting and cleaning unit, a surface cooler inlet.3.4系统内有空气 3.4 system with air

在冷水管网注水过程中,如果注水速度过快,管网内会残留大量空气,水流动循环后,这部分空气会集中在系统顶部或其他区域,造成局部空调器内冷水不流动或流动不畅,影响换热。

In the cold water pipe network water injection process, if the injection speed too fast, the pipe network within the residual amounts of air, water circulation, the air will be concentrated in the system or on top of other regions, causing local air conditioning cooling water does not flow or the flow is not smooth, effect of heat transfer.这种情况下,需手动开启空调器放气旋塞和打开系统高点排气阀排气。由于自动排气阀 http://www.xiexiebang.com/ http://www.xiexiebang.com/ 排气比较慢,因此在施工中,可以在供、回水主管最高点多安装几处排气装置,在实际工程中,可以在排气支管上安装一个三通,三通水平端安装普通闸阀,向上端安装自动排气阀,在管网注水过程中,可以打开闸阀,让管网内的空气快速大量排出,正常后再关闭,使用自动排气装置排气。

In this case, the need to manually open air conditioning vent plug and open the system high exhaust valve.The automatic exhaust valve slowly, therefore in the construction, can a few exhaust device installed in return for charge, the highest point, in the actual project, a three is installed on the exhaust pipe, three horizontal end installed ordinary gate valves, the installation of automatic exhaust valve in the pipe network to the upper end, in the process of water injection, can open the valve, let the air inside the pipe fast discharge, normal after closing, automatic exhaust exhaust use.3.5水流量调节分配不合理

3.5 water flow regulating unreasonable distribution 设计人员在设计系统时,根据不同功能区需求及节能要求,在分水器上设置了一定数量的阀门,以分别控制不同场所的水流量,在调试中需调节好这些阀门的开启圈数,保证每个场所空调水系统的顺利循环和流量的合理分配。

Designers in the design of the system, according to the requirement of demand and conservation of different functional areas, the amount of the valve installed in the water separator, water flow of different places, the need to adjust the valve opening laps, ensure the reasonable distribution of each places smooth circulation and flow of air conditioning water system.4.冷水机组制冷量达不到额定值

Cooling capacity 4 chiller amounted to less than the rated value

制冷机组是集中空调系统的心脏,如出现制冷机组制冷量不达标问题,对整个集中空调系统效果有很大影响。造成制冷量不达标问题的原因比较多,难以进行完全的技术分析,笔者在这里只谈几点粗浅的认识。

Refrigeration unit is the heart of central air conditioning system, such as the emergence of refrigeration capacity of refrigeration unit standards are not the problem, has a great influence on the central air conditioning system.The cause of the refrigerating capacity not the problem more, it is difficult to analyze complete technology, know the author only talked a few superficial here.4.1实际冷负荷超出机组制冷量 http://www.xiexiebang.com/ 4.1 actual cooling load exceeds the refrigeration capacity 设计时,对于制冷机组的制冷量要求,设计人员已经进行了详细的冷负荷计算。但在施工过程中,业主有时会在不是设计范围内的场所增加空调设备,因此,需核对实际空调服务面积是否超出图纸设计范围,如超出,冷负荷会比制冷量大,造成机组冷水出水温度偏高。The design for the cooling capacity of refrigeration units, requirements, design personnel have carried out a detailed calculation of cooling load.But in the course of construction, the owners will sometimes not in design range of places increased air conditioning equipment, therefore, need to check the actual air conditioning service area is beyond the scope of design drawings, such as beyond, cooling load than large refrigerating capacity caused by the unit, outlet temperature of chilled water.4.2冷却水参数达不到规定要求

The 4.2 cooling water parameters do not meet requirements

冷却水的水温和流量是制冷机组运行时很重要的参数,冷却水温偏高和流量偏小对制冷机组效率会产生很大的负面影响,对冷却水参数是否达到规定要求一定要多加重视和检查。另外,在设计和土建施工时,要尽量将冷却塔布置在相对空旷的屋面上,塔的数量超过2台时,需保证相邻塔的间距为塔直径的1~1.5倍以上,以保证各塔的进风气流不受影响。The cooling water temperature and flow rate are important parameters of refrigeration unit in operation, the temperature of cooling water and high flow is small on the efficiency of the refrigerating unit will have a great negative impact, on the cooling water parameters meets the specified requirements must pay more attention and check.In addition, in the design and construction, to minimize the cooling tower is arranged in a relatively open roof, tower more than 2 units, the need to ensure spacing between adjacent tower of the tower diameter of 1 ~ 1.5 times, to ensure that the air flow into the tower is not affected.4.3购置机组要留有余量

4.3 purchase of units to leave a margin 以溴化锂冷水机组为例,制冷机组在使用过程中,由于机组自身的一些原因,如机组内部钢板会有轻微腐蚀及溶液参数发生变化,传热管堵塞或结垢引起传热效率降低等等,都会引起制冷量衰退。在购置机组时,在设计制冷量的基础上,可以适当增加些投资,购置制冷量、功率大一些的机组,为今后系统良性运行留有空间。

Using lithium bromide chiller unit as an example, the refrigeration unit is in use process, because http://www.xiexiebang.com/ http://www.xiexiebang.com/ of some reason unit own, such as a slight corrosion and solution parameters change unit internal steel plate, tube blockage and scaling caused by heat transfer efficiency and so on, will cause the refrigeration capacity decline.In the purchase of units, based on the design of the refrigerating capacity, can be appropriate to add some investment, the purchase of refrigerating capacity, power of larger units, for the future of the benign operation of space systems.总之,安装调试工作直接关系到空调的使用质量。因此,作为工程安装调试人员,在中央空调工程安装调试中,应严格按照规范安装,严格管理、认真验收,这样才能保证中央空调工程的质量,避免各种问题的出现,保证中央空调的使用品质。

In short, installation and commissioning work directly related to the use of air conditioning quality.Therefore, as the engineering installation and commissioning personnel, in the installation of central air-conditioning engineering, should be installed in strict accordance with the norms, strict management, careful inspection, so as to ensure the central air-conditioning engineering quality, avoid all sorts of problems, ensure the quality of central air conditioner.9

第二篇:中央空调安装调试

1、空调水系统套管分为两管制、四管制和分区两管制水系统。两管制水系统是指有一套供水管路和一套回水管路系统的水系统,夏季供冷水,冬季供热水。在机房内进行夏季供冷冬季供热的工况交换,过度季节不可使用。这种系统结构简单,布置方便,占用的面积小,节省初投资。运行时冷、热水的水量相差极大。该系统不能同时实现同时供冷和供热。三管制系统是指冷水管和热水管分开设置,而回水管公用的系统。冷热量的交换系统很严重,能量损耗大。末端控制和水量控制较为复杂,较高的回水直接进去冷水机组,不利于冷水机组的运行。四管制指 冷热水系统的供回水管分开设置。投资较大,运行管理较为复杂,管路较多,系统复杂。

2、冷热水、冷却水系统的试验压力,当工作压力小于等于1.0Mpa时,为1.5倍工作压力,但最低部小于0.6Mpa;当工作压力大于1.0Mpa,为工作压力加0.5Mpa 对于大型或高层建筑垂直位差较大的冷(热)媒水、冷却水管道系统宜采用分区、分层试压和系统试压相结合的方法。一般建筑可采用系统试压方

法。分区、分层试压:对相对独立的局部区域的管道进行试压。在试验压力下,稳压10min,压力不得下降,再将系统压力降至工作压力,在60min内压力不得下降、外观检查无渗漏为合格。系统试压:在各分区管道与系统主、干管全部连通后,对整个系统的管道进行系统的试压。试验压力以最低电的压力为准,但最低点的压力不得超过管道与组成件的承受压力。压力试验升至试验压力后,稳压10min,压力下降不得大于0.02Mpa,再将系统压力降至工作压力,外观检查无渗漏为合格。凝结水系统采用充水试验,应以不渗漏为合格。

3、钉贴法:钉贴法是日前经常采用的一种保温方法,首先将保温钉粘在风道外壁上,然后再将保温板紧压在风道上,露出钉尖(图4---56)。保温钉形式较多,有金属、尼龙或在现场用镀锌钢板自制的。保温钉一般要求在矩形风道底面上的问距约2O0mm,侧面约300mm ,顶面30O~400为宜。板缝应整齐严密,板材或卷材要与管壁压实、压平,不得留有缝隙。保温钉穿透保温板后,套好垫片,然后将钉尖扳倒压平即可:粘钉时,宜每排错开1/2间距,在施下中常会出现在矩形风道的顶面少粘钉或不粘钉的现象,这样会使顶面的保温层不能很好地与风道贴实,而造成保温(保冷)效果降低。保温板不带铝箔时,可外包扎玻璃丝布,再做面层。

4、气密性试验的方法之是打压试验,即用氮气充入制冷系统中观察其压力变化,以鉴别是否有泄漏。打压试验时,要在制冷系统中安装高压压力表和低压压力表(使用复合式压力计也可)。

氮气可由低压侧充入。试验时,高压压力不超过1.6MPa(16kgf/cm²),低压压力不超过1.0MPa(10kgf/cm²)。充入氮气后可观察压力表,经8小时未见明显的压力变化即为合格:若压力有所变化,应该用肥皂水进行检漏,以查明漏点。

第三篇:商用中央空调-安装商用中央空调分析

商用中央空调--商场安装中央空调分析

商场常用的空调:

1)空调系统的分区

百货商店各层楼面几乎都是没有间隔的通间,没有必要按朝向的差别进行分区,而应按房间用途进行分区。例如:按一般商场、特种商场、地下商场、商品展示厅、办公室等进行空调系统的分区。有的大型百货商店还附设有美容室、餐馆、影剧院等设施,由于这些房间的服务时间不同,以及为避免气味的相互串通,应单独设立空调系统。2)集中式低速单风管系统

该方式的优点如下:保证有足够的新鲜空气;可集中进行空气过滤和空调机组的消声处理;在过渡季可采用全新风供冷,可推迟或少开制冷机;由于空气集中处理,系统本身简单,维护管理方便。缺点是风管断面较大,占用建筑空间多。当营业厅内无特殊臭气发生,且大厅布局变更不大时,集中式低速单风管系统方式是最经济的。3)新风空调机组加各层机组方式

新风由新风空气处理机组集中处理,由送风立管(或新风竖井)送至各层,与室内回风混合后,经各层空调机组进行热湿处理后由风管送入室内。这种系统机动灵活,用得较为普遍。4)集中式低速单风管和各层机组结合方式

在多层商场中,用得较多的是集中单风管和各层机组结合的空调系统。商场的回风经回风立管集中至屋顶或室内空调机组,经集中空气净化后,与新风混合、热湿处理后送入主风管。其优点是在过渡季可全部采用新风供冷及全部排风等。

5)为了节省机房面积,在层高允许的条件下,可采用卧式吊顶机组的空调方式,如大型商场沿长度方向设置多台吊顶式中、小型卧式变风量空调机组。此时新风进口面积按商场过渡季节送全新风考虑。但必须处理好冷凝水排放问题。

6)中、小型商场或与商店营业时间不同的其他一些房间(例如值班室、电视监视室、配电室和食堂等),采用单元式的空调机组(制冷剂直接膨胀式)比较合适。

7)在寒冷地区底层主要出入口,建议安装热空气幕,以减少或防止非调节空气渗入,这在供暖时特别需要。

8)百货商场的办公室大多设在建筑物的外区,可以采用侧送风、风机盘管或者热泵机组等周边系统方式。

9)商场内,由于人体负荷大,从人体散发的湿量多,因此外墙的玻璃窗面容易结露,在局部地区,可能会出现湿度过高现象,从而导致商品质量下降,所以在空调系统中,不设加湿装置。但在出售家具、木工制品的商场内除外。

10)空调冷热源较多使用往复式和离心式冷水机组,如受到供电容量的限制,也有使用溴化锂吸收式冷水机组的。在机房面积紧张或不允许采用锅炉供暖的地方,空气热源热泵是常选择的一种方式,机组可直接置于屋顶等室外。

商场空调负荷特点如下 :

1)商场内人员密度(包括顾客和营业员)在一天内变化悬殊,它决定于商场客流量,而商场客流量随时间、平日、节假日、季节、所在地区(闹市区或郊区),以及商场特色和层次等因素有关。2)商场建筑的空调冷负荷中,除建筑传热和日射等外部负荷以外,还有人体、照明、自动扶梯和陈列橱窗等负荷。3)商场建筑总冷负荷中,人体负荷和新风负荷是主要的。所以合理确定人体负荷是很重要的。

4)商场的建筑传热负荷远小于人体、新风、照明负荷,一般占总负荷的1%~7%。

5)新风负荷在商场建筑中,空调系统的最小新风量是根据人的卫生标准确定的。它与人们在空调环境中所处的状态、停留时间的长短,以及是否允许吸烟等条件有关。

建筑特点结构:

商场建筑的功能不同于旅馆和办公楼建筑,室内空调一般有以下一些特点 :

1)商场建筑空间大,室内人员多,照明设备多,故空调冷负荷和新风负荷大。

2)商品种类多,营业厅布局常有变动,要求空调设备具有一定的灵活性。

3)大商场内有些营业厅人员密度大,有些密度小,在确定空调机组容量和空调分区时,应加以区别。

4)有些商业建筑趋向多功能化,除了商业空间外,还设有会场、剧场、餐厅等,其空调系统应考虑分区。

5)百货大楼的出入口人流频繁,在寒冷地区的冬季,为防止或减少室外冷风的侵入,往往要设置前室并使用热风幕,在建筑上应考虑合适的入口方位,并设避风用的挡风壁。

6)在过渡季,为了推迟或少开制冷机,应充分利用新风供冷。7)根据建筑防火规范的要求,设置防排烟装置。

商用中央空调工作原理:

大型商场中央空调原理—大型商场中央空调工作原理

大型商场中央空调原理是由一台主机通过风管或冷热水管来连接多个末端的出风口,能够把冷暖气送到不同的区域之内,从而实现调节室内温度的主要目的。中央空调系统一般由冷热源系统和空气调节系统共同组成,制冷系统能够提供所需的冷量,而制热系统提供所需的热量,其中制冷系统是中央空调系统最重要的部分,需要认真进行研发和设计。

大型商场中央空调原理—大型商场中央空调的优点介绍

大型商场中央空调具备着多方面的优势体现,首先它具有投资成本低的特点,可以给人们带来很高的经济效益体现。其次大型商场中央空调具备美化装饰的作用,进行隐藏式安装,能够节省室内的占地空间。第三大型商场中央空调具有舒适度高的表现,能够在运行的时候即使补进新风,不仅能够提高空气的质量,也会给人带来舒适化的感受。第四大型商场中央空调具有结构紧凑、运行稳定的特点表现,在使用效果方面是非常稳定的,不会出现忽冷忽热的情况。以上介绍的就是有关于大型商场中央空调原理以及大型商场中央空调优势方面的具体内容,大型商场中央空调是一类具有多方面优势特点的空调类型,这也是它备受关注的原因所在。装了中央空调的商场客流量也会更多一些,夏日炎炎,谁都想找个凉快的地方逛逛也好,走走也好。中央空调的制冷效量是可以满足客流量大的地方。而且现在的时代商场安装中央空调已经是很平常的一件事,中央空调算是一个大型商场的标配了吧。所以,商场安装中央空调这件事是利大于弊哦。

第四篇:综采设备地面调试安装措施

一、工作面电缆铺设:

1、电缆在入井前应进行绝缘摇测,对电缆的伤口或外套磨损严重的地方,要进行热补或冷补的修复工作,对于电缆连接的设备是用插头连接的要将电缆插头安装好,电缆绝缘处理好,插头也安装好后要将所有的电缆头用绝缘胶带缠好或插头要用塑料布包好,并在电缆头1米附近标出是电缆所带的设备,以及是电动机侧还是开关负荷侧,是移动变电站低压侧还是开关电源侧,如果是移动变电站之间的连线,还应标出是几号移动变电站的连线。

2、这个工作面在电缆的铺设中采用了先将电缆入井挂在切眼的煤壁上的办法。电缆钩要提前挂好,间距不要太远2.5米以内,塑料电缆钩太脆容易断裂,铺设电缆时不得用力过大,最好要在塑料电缆钩之间加设铁电缆钩,没有铁电缆钩可以在塑料电缆钩之间用铁丝捆绑,分担电缆钩的承载力。主运转载机的安装地点采侧的煤壁上没有电缆钩,可以将电缆用铁丝吊挂在顶板上,一定要固定好,否则会出现电缆插头掉落的事故。各电缆在主运顺槽中预留的余量,转载机电缆45米、破碎机电缆40米、采煤机电缆45米和运输机机头电缆高低速各20米。切眼中,采煤机机窝处要将电缆挂在顶板上,以防影响采煤机的安装。

3、电缆挂入切眼的应注意的几个问题:1)电缆的绝缘应定期进行摇测,去除浸入电缆内部的潮气,摇测后要将塑料布重新包扎好;2)电缆要定期巡查,对断裂的电缆钩要及时补换。3)在工作面设备的安装过程中,容易将吊挂在煤壁上的电缆挤坏,要安排人看好,4)电缆在搬家队易碰撞处贴反光标识进行提醒保护。

4、工作面电缆的入槽和上架:工作面转载机、运输机、和支架,以及设备列车到位后。设备列车后面电缆,如果用单轨吊或用皮子抱捆,单轨吊应安装到位或最好皮子应准备好,还有运输机机尾上的电缆槽子,机尾入井前应提前安装好。由于电缆先期已吊挂在煤壁上了,不需要大量的人力来拖电缆,只需要少量的人员,按电缆在煤壁上的次序,由下而上,逐渐放运输机的电缆槽内。电缆头在所连接的电动机处应留有1.5--2米的余量;电缆在运输机机头入槽和机尾出槽处都应留下1米的余量。电缆要入槽过程中应安排专人对电缆的破口和冷补或热补的位臵,对应支架的编号一一记录下来;采煤机的电缆应从主运拉着头到运输机机尾留出5米的余量后,从分中槽往运输机机头方向数3个电缆槽处由下槽转到上槽。工作面的660供电电缆也要同时辅入电缆槽入。

二、设备列车安装须注意的几个问题:

1、参照过去设备列车的布臵和结合本工作面对设备列车对设备布臵的需要,确定设备列车的布臵顺序,并画出布臵图。

2、对设备列车所需要的材料要提前准备好。

1)设备列车的照明包括照明灯、电缆、灯架和固定灯架用的螺栓; 2)设备列车的接地装臵包括接地扁铁、接地连线、接地极、接地镀锌螺栓和移动变电站及综保辅助接地用的接地线;设备列车的连接板和连接销。

3)设备列车上的电缆架和电缆插销,在入井前都应安装到位,包括空压机后的特殊电缆架子都应安装到位; 4)设备列车用的轨道、道夹板和螺栓;

5)设备列车中,移动变电站后面挂电缆用的特殊电缆钩;

3、设备列车的所有设备在入井前要检查,除尘除锈重新喷漆,对缺损的零部件要及时补齐和修复。

4、根据过去工作面和所用电缆的长度,确定设备列车尾车到运输机机尾的距离。

5、设备列车在安装时,与采侧煤壁的距离要适当比生产时宽一些,靠采侧道轨采侧边缘与煤壁应留出1.4米至1.5米的余量,方便电缆上架和列车后水管的折除以及液压管理的吊挂。

6、设备列车入井时应编号和标出朝向工作面的方向。

7、对设备列车上容易丢失部件要另行集中运输或对其进行固定。

8、对设备上个车上容易损坏的部位要如开关的观察窗要采取措施进行防护和隔离开关手把。

三、辅运顺槽电缆的铺设和高压接线盒的安装

1、辅运顺槽的电缆钩要提前安装或补齐

2、提前准备好材料包括高压电缆、高压接线盒、接地极、接地线、固定接线盒的膨胀螺栓、绝缘胶带、四氯化氮、凡司林和高压接线盒内接线用的特殊套筒。

3、电缆入井前要摇测其绝缘程度,对损伤的外套要修复好,并用塑料布将电缆头包好。接线盒入井前要对保证其完好,缺少零件的及时补齐,生锈的外壳要除锈,重新刷漆。

4、电缆要拉直接线盒处留有的余量不要多过,不要与其他电缆交叉。

5、在施工的过程中接线盒接好线后及时吊挂起来。

四、工作面安装期间的临时供电方案

方案1:在最近的配电点660V移动变电站处或截面足够大的660电缆接线盒处引线,用铺设好的高压电缆将低压电供入工作面。

方案1:在最近的配电点10KV高防开关处或截面足够大的高压接线盒处引线,用铺设好的高压电缆将高压电供入在工作面设备列车前的躲避硐中放臵的一个660V移动变电站中,然后用低压电缆向安装期间的工作在临时泵供电。

五、工作面内部设备的安装

1、中双刮板铺设安装时就注意的哪些事项:

1)刮板的方向应使大弧形面朝向运行方向,使T型螺栓头指向背离溜槽中板,却刮板在上槽时,T型螺栓应从下向上穿。2)T型螺栓的六角防松螺母必须拧紧,对直径42×145 mm的中双链,链间距为220mm,每8个环安装一个刮板,刮板间距为1168mm。3)将联结件的粘附物清洗干净,涂少量润滑油。

4)圆环链立环的焊口背离溜槽中板,即上链立环焊口朝上,下链立环焊口朝下。

5)接链环应在竖直位臵,便于通过链轮,固定零件不得缺少。6)螺纹的紧固力矩为1320N.m

2、工作面设备供电和通迅、照明系统的安装: 0)各设备的电动机在入井前应进行绝缘摇测,绝缘达不到要求的要进行处理;电动机不完好的要把各零部件补齐。

1)工作面各设备电动机、开关和移动变电站的接线,严格按照接线工艺进行施工,不得出现不完好和失爆现象;使用连接器连接的设备,电缆的连接插头在受力后容易使内部连接脱开,应打开检查后再安装。

2)对于双速电动机,各电缆和绕组的连接要一一对应,不对接错:

3)按照供电的电压等级对设备电动机的接线方式进行施工; 4)移动变电站在通电之前必须将主、副接地装臵安装到位; 5)在供电初期,必须先保证一台乳化泵和采煤机的供电; 6)开关通电后,控制台以及控制线路也及时安装,、对开关的所有回路进行先期试车;

7)工作面的通迅和照明灯的安装,应尾随支架的安装逐步展开。所需的材料要提前准备包括,工作面用的扩音电话、通讯电线,固定扩音电话用的架子和螺栓、吊挂电缆用的电缆钩、支架灯、接支架灯用的电缆、固定支架灯的螺栓。

8)支架的管路要尾随支架的安装及时连接,编号要及时标喷出来。

9)工作面的扩音电话要与设备列车控制器及时连通,保证工作面的通讯。

3、工作面采煤机安装时应注意哪些事项: 0)采煤机在入前必须对各电动机的绝缘程度和各部件的完好程度进行严格检查,缺少的要及时补齐。

1)工作面安装地点应有足够的长宽的缺口,俗称机窝,便于存放采煤机部件。

2)安装地点的项板支护要完好牢靠,底板清扫干净,通风良好。3)准备好材料:起吊环、钢绳绳套、手拉葫芦、方形枕木、液枪和液管。

4)起吊部件或单体挤压部件时附近不得站人员,指挥人员应就地选择安全地点。

5)电工作业与机工用电时,应避免平行作业,防止误伤害。6)电工应严格按照接线工艺和防爆标准进行施工,线路不得出现遗接漏接错接现象。

7)电工严禁带电作业,机工严禁设备运转时检修,一定要及时停电闭锁。

8)各电缆容易受损伤的地方,再试机前要用皮子包好。9)采煤机照明装臵也要在试机之前要施工完成。

4、刮板输送机空载试运转时应怎样检查: 1)检查电缆吊挂、开关,控制器是否工作正常; 2)检查各减速箱和润滑点的油箱是否缺油; 3)检查输送机上有无人员作业,有无障碍物;

4)按顺序点动机头低速电动机、机尾低速电动机、机头高速电动机和机尾高速电动机,检查其旋向是否一致,不一致的要及时整改。5)检查机头、机尾摩擦离合器、减速器、各连接螺栓链轮、分链器、护板和压链块是否完好、紧固,润滑是否良好。

6)检查中间部:从机头链轮开始,往后逐级检查刮板链条、刮板、连接环及螺帽是否正确坚固。检查4-5米后,在刮板上做个明显记号;然后开动电动机,把带记号的刮板运行到机头链轮处;再从此记号向机尾检查,一直到机尾;在机尾处的刮板再做个记号,然后从机尾往机头检查中部槽、铲煤板、挡煤板的情况。回到机头处,开动电动机把机尾有记号的刮板运行到机头链轮处,再往机尾重复对刮板链检查,直到机尾。到此,对刮板链检查了一个循环。在检查中发现的问题要及时处理。

7)紧链:输送机空载运转后,各溜槽消除了间隙,刮板链必然要产生松弛现象,因些,必须重新进行紧链。

5、采煤机在工作面安装试运转应注意的问题: 外观检查

1)零部件完整齐全。螺栓、螺钉坚固,手把及按钮动作灵活、正确。2)油质和油量是否符合要求,有无漏油、漏水的现象; 3)用手盘动滚筒,不应有卡阻现象。截齿和喷头齐全完好。4)电动机的接线是否正确,滚筒旋转方向是否正确,两牵引电动机是否旋向一致。

5)电缆夹是否齐全,长度否合适,拖缆装臵是否固定好。6)电控的外围设备包括端头操作站,预警装臵是否安装到位。7)摇臂上截割部的漏油口是否畅通。8)运输机闭锁装臵是否安装到位。试运转应注意:

1)机器应无异常响声,各部 温度应正常,符合规定。

2)滚筒升降灵活,升降到最高点和最低点的时间是否符合规定。3)内外喷雾良好,无漏油、漏水现象 4)牵引正常,控制灵活。

5)遥控操作和各操作点的操作是否灵活。

六、伸缩带式输送机的安装:

1、伸缩带式输送机在井下安装前应做哪些准备工作? 0)伸缩带式输送机所用的电动机入井前要进行绝缘摇测,开关要开盖检查,确定设备完好。

1)设备下井前,安装人员必须熟悉设备和有关图纸资料。根据矿井巷道的运输条件,确定设备部件的最大尺寸和质量。

2)在安装输送机的巷道中,首先确定输送机的安装中心线和机关的安装位臵,将这些基准点在支架或顶板相应位臵上标志出来。3)清理巷道底板,根据输送机总体装配图所标注的固定安装部分长度,将巷道底板平整出来。对安装非固定部分(主要指落地式机身)的巷道也要求一般的平整。

4)为便于运输,应将大件解体,并作好标记,以便于对号安装,对外露的加工面,应采取保护措施,防止磕碰损伤。

2、伸缩带式输送机在井下怎样进行铺设安装? 井下铺设的方法是: 1)井下巷道空间较窄,为避免铺设时零部件的堵塞,应按照先里后外的原则,即按机移动机尾装臵、机身(中间架)、回空输送带下托辊、纵梁上托辊、载货输送带、卷带装臵、储带仓(包括张紧小车,移动小车,托辊小车、储带仓架、储带转向架车)机关传动装臵的顺序,搬运到各自的安装地点的巷道旁边。

2)根据已确定的基准点,首先安装固定部件,如机头部、储带仓、机尾等部件。安装后,机头尾及各滚筒中心线应在同一直线上。3)安装机身时首先将H形中间架每3米一架卧放在输送机中心线底板上,底脚朝向机头。

4)将输送带工作的一面向上,沿输送机铺设在巷道一侧底板上,然后从一端将输送带180度搭在中间架的横梁上;再装中间架的纵梁、下托辊与上托辊。

5)输送机的沿线通讯保护系统,同时推进安装;

6)铺设载货输送带可借助主传动滚筒和另设臵一台牵引绞车进行。7)用于后退式采煤方法时,将储带仓中的游动小车臵于靠近机头端(前进式或综掘工作面臵于远离机头的一端),开动绞车,给输送带以足够的张力,以保证输送机在起动和运行过程中输送带不会在传动滚筒上打滑。

8)检查各部分安装情况,清除影响运转的障碍物,做好通讯联络,检查电控保护装臵动作情况。

9)如果输送机中间设有中间驱动,中间驱动和带式输送机机头供电应取自同一个电源,所有电动机应设立反馈点,保证电动机在同时工作。

3、制作输送带接头时应做哪些准备工作: 1)按输送带的厚度选用相适应的钉扣机和U形扣; 2)切割接头时,要保持接头与输送带边呈90度; 3)接头两侧应切去一个三角形,其高度为25~30; 4)U形钉的尖端应向着输送带承载的一面; 5)钢丝绳联接销的长度应小于输送带宽度。

4、带式输送机的试运转:

1)未装输送带的试运转:机头、储带仓和电气设备都装好后,先不装输送带,进行空运转,检查减速器运转是否平稳,轴承声响、温度是否正常,张紧绞车是否性能良好

2)装上输送带后的空运转:拉紧输送带:在空运转前,开动张紧绞车给输送带以足够的张力;空运转试验:空运转时全线各点都必须设人观察情况,发现输送带跑偏、打滑及其它不正常情况,应立即停车进行处理,空运转时间为4小时左右。

3)负荷运转:空运转确认无问题后方可放煤加载运转试验。驱动装臵应运行稳,不允许出现异常振动及声响,在起动和运行过程中不允许输送带有打滑现象;运行过程中,输送带边缘不得超出托辊管体和滚筒边缘;负荷运转试验时间为2小时。

5、怎么处理输送机跑偏?

1)输送带在卸载或机尾滚筒跑偏的处理:利用滚筒轴承座上的调整螺杆进行调整,即输送带往哪边跑就调紧哪边的螺杆。滚筒调整后必须按规定重新调整刮板清扫器。

2)输送带在中间部跑偏的处理:利用改变托辊的方向与位臵进行调整,即输送带往哪边跑就在这边将托辊朝输送带运行方向偏转一个角度,但一次不能调整得太多。

捆绑大件时,应在棱角处垫上旧皮带,以免损坏钢丝绳。地面起吊重物时,钩头下严禁站人,所有人员站在安全地点并戴好安全帽。

安装过程中起吊设备时必须遵守下列规定: A.起吊工器具必须完好齐全。

B.起吊前要进行试吊确保无问题后方可起吊。C.起吊设备下严禁有人工作行走或逗留。D.起吊工具器必须有专人检查。

使用倒链起吊大件时,人员必须站在被起吊物件的侧上方和索具受力方向的相反位臵,防止倒链或索具滑扣、断裂伤人。起吊工器具必须完好齐全。

B.起吊前要进行试吊确保无问题后方可起吊。C.起吊设备下严禁有人工作行走或逗留。D.起吊工具器必须有专人检查。

7、起吊设备前,人员必须站在被起吊物件的侧上方或索具受力方向的相反位臵,防止倒链或索具滑扣、断裂伤人。

第五篇:管道安装中常见问题的分析及处理措施

管道安装中常见问题的分析及处理措施

1、排水管道堵塞问题的预防和处理措施

产生的原因:室 内排水管道堵塞是建筑安装工程施工中常见的一种质量通病,是管道安装与土建施工配合难以解决的老问题。在土建与安装交叉施工中,管道被堵塞的事例很多,特 别是卫生间排水管口与地漏更为严重。即使管道安装后,管口用水泥砂浆封闭,还往往被人打开,作为清洗水泥及平整地面的污水排出口。有的甚至从屋面透气管 口、雨水斗落入木条、碎石、垃圾、砂浆等,造成管道的堵塞。轻者耗工疏通,重者凿打砼地面,返工拆除管道重新安装,这样既耗工耗料,又影响工期。有的排水 管道管腔内已部分堵塞,在通水试水过程中未能及时发现,投入使用后,必然出现管道堵塞,影响用户使用。

预防和处理措施:为 了避免交叉施工中造成管道堵塞现象,在管道安装前,除应认真疏通管腔,清除杂物,合理按规范规定正确使用排水配件;安装管道时,应保证坡度,符合设计要求 与规范规定及排水管口采用水泥砂浆封口等措施外,还必须采取如下多种技术措施以防止管道堵塞:由于建筑结构需要原因,当立管上设有乙字管时,应根据规范要求,在乙字管的上部设检查口以便于检修;当设计无要求时,应按施工及验收规范规 定,在连接2个及2个以上大便器或3个及3个以上卫生器具的污水横管设置清扫口,在转角小于135度的污水横管上,设置检查口或清扫口;排水管道安装时, 埋地排出管与立管暂不连接,在立管检查口管插端用托板或其他方法支牢,并及时补好立管穿二层的楼板洞,待确认立管固定可靠后,拆除临时支撑物,此管口应尽 量避免土建施工时作为临时污水排出口。在土建装修基本结束后,给水明敷支管安装前,对底层及二层以上管道作灌水试验检查,证实各管段畅通,然后用直通套(管)筒将检查口管与底层排出管连接。

2、管道渗漏问题的预防和处理

管道渗漏问题也是给排水管道施工常见的问题,产生这一问题的原因也比较多,对这一问题的预防和处理是给排水施工最关注的核心环节,对管道系统严密性的严格要求贯穿于整个施工过程中。

产生的原因:管 道渗漏的问题可以从材料、施工操作二方面来分析。材料方面:材料方面的原因包括:管材和管件的强度不合格;管道和管件有砂眼;管道安装后被人为损坏。这些 情况作者都接触过,质量问题较多的是镀锌钢管的弯头,这些劣质弯头的问题主要是外弧处的壁厚过薄或有砂眼,肉眼一般很难发现。塑料管材原材料的质量一般很 好,出现渗漏的原因一般是安装后被其他工种施工人员作业时损坏造成。施工操作方面:施工方面的原因包括:镀锌钢管的螺纹加工不合格;管道接口连接不严密。这些也是常见的原因。排水管道接口出现渗漏的情况很少,出现这种问题的原因大都是施工马虎,管道连接时忘记涂胶水或插入深度不够。入深度标记,这样容易控 制且便于检查。

预防措施和处理方法:严 格控制采购过程,仔细检查。对于各批次的管材、管件的使用情况做好记录,一旦发现问题及时更换。对于PPR管材安装,应对其的伸缩性采取措施进行预防。可 利用的技术措施有:非直埋管道敷设时,应考虑解决管道热胀冷缩变形的技术措施。应尽量利用管道折角自由臂补偿管道的伸缩;当管道不能利用折角作自然补偿 时,应采用其他类型补偿措施。水平干管与水平支管连接、水平干管与立管连接、立管和每层支管连接,应有管道伸缩时相互不受影响的补偿措施。布置横管或立管 时应充分利用建筑空间,以“U”形管道做变形补偿。出现渗漏问题,需要寻找漏水点,找到漏水点后分析原因。然后,采取相关措施进行处理:更换不合格的管 材、管件;施工操作不合格的一律返工,重新制作安装;由于热胀冷缩造成的PPR管材,截去一段管道采取上述的技术措施进行整改(感谢关注机电天下)。

3、阀门的选择和安装中问题和预防措施

产生原因:阀门类型选择不当:阀型与管道系统功能及压力不匹配,闸阀与截止阀混用,蝶阀与球阀混用,柱塞阀与闸阀混用,明杆阀与暗杆阀混用等,给管道运行和维修带来不良后果。阀门安装不利于操作和维修。止回阀安装位置不当等问题。

预防处理措施:安装时应考虑操作和维修空间,注意安装高度和手柄朝向;又如两个阀门直接连接时,中间缺少穿入螺栓的间隙,应在二阀间增设短管等止回阀必须按指示箭头安装。高位水箱出水管的止回阀,应在距水箱底≥1m处水平安装,以利止回阀正确动作,或采用低阻力止回阀。

4、噪音问题产生原因及处理方法

产生原因:给 水管道压力超过0.3~0.4MPa且管径≤20mm及管路较长时,管道会产生啸叫和振动,这主要由高速水流动力与管道系统产生共振所致。排水管道噪音问 题:排水管的水流呈不充盈和重力流状态,噪音难免,且受管道材质影响。试验资料表明,DN100管当流量为2.7L/s时铸铁管噪音值为 46.5dB,PVC-U管噪音值为58dB,故在要求安静的高档房间,宜选用柔性连接铸铁管。新产品芯层发泡隔音PSP管,隔音效果好,价格略贵,也可 选用。

预防处理措施:综合防治措施有适当加大管径、采用曲挠橡胶接头、支架与管道接触处加橡胶垫以及加装减压阀等。但注意减压阀本身也有噪音,要经反复调试,使噪音减至最小。

下载中央空调安装调试难点分析及处理措施中英文对照..word格式文档
下载中央空调安装调试难点分析及处理措施中英文对照...doc
将本文档下载到自己电脑,方便修改和收藏,请勿使用迅雷等下载。
点此处下载文档

文档为doc格式


声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:645879355@qq.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。

相关范文推荐

    中央空调销售及安装业务的会计和税务处理

    中央空调销售及安装混合销售业务会计和税务处理涉及销售与安装的混合销售业务, 尤其是需要安装与检验合格的业务,税法虽已明 确各纳税时点,但在具体会计实务操作中,由于与会计准......

    施工重难点分析及措施

    文明施工及土方开挖 本工程施工现场环境较特殊,首先施工现场无堆土区,需考虑土方全部外运 及外购土方回填的方法措施,施工现场必须全封闭分隔并做好安全通道工作,需着重考虑防......

    监控摄像设备安装调试故障处理说明书

    监控摄像设备安装调试故障处理说明 一、摄像头(枪机和球机)安装安装规范 1、摄像头宜安装在监视目标附近不易受外界损伤和遮挡监视目标的地方,安装位置不应影响现场设备运行和......

    空调设备安装及系统调试质量通病防治措施

    空调设备安装及系统调试质量通病防治措施 一、组合式空调器安装 (一)现象:表面凹凸不平整,各空气处理段连接有缝隙,空气处理部件与壁板之间有明显缝隙,减振效果不良,排水管漏风。 (......

    药物分析 专业词汇中英文对照

    药物分析 专业词汇中英文对照绪论 释药系统(drug delivery system,DDS) 中国药典(Chinese Pharmacopoeia,ChP) 美国药典(The United States Pharmacopoeia,USP) 美国国家处方集(The......

    中央空调系统设备房设备及管道安装减振措施

    中央空调系统设备房设备及管道安装减振措施 摘要:中央空调系统的大面积应用,给人们带来了舒适的生活和工作环境;尤其是在商业性质的办公大厦,该系统以灵活的末端供冷系统布置,加......

    施工材料转运难点分析及应对措施

    4.4.7施工难点、重点的技术措施 4.4.7.1工程实施过程中的重点分析和应对措施 重点分析:在城区道路、公路及村镇街区道路人行道上埋设管道过程中,容易因没有报建批复、违反当地......

    施工重点、难点分析及其应对措施

    第三章施工重点、难点分析及其应对措施第一节工程特点本工程仓库分为仓库1~4,共分两层,全部为立体货架式仓储模式。一层为预应力钢筋混凝土框架结构体系,屋面采用大跨度轻钢结......